1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.

Slides:



Advertisements
Similar presentations
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Advertisements

Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Gas Performance Assurance Framework 11 th January 2013 Confidential.
IGT Single Service Provision Requirements Update – 27 th March 2013.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Agency Charging Statement Overview of Consultation 11 th February 2008.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
Modifications iGT 039 and GT 0440 re iGT Agency Services background
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Change Management Committee – June 2019 Update
PN UNC Workgroup iGT Services
Modification th July 2008.
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
UNC Modification Proposal 0362
PN UNC Workgroup iGT Services
June 2019 Release Scope DSC Change Management Committee
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
AUG Query Responses 21st November 2013.
Connected System Exit Points - Update
Project Nexus Workgroup
Joint Theft Reporting Review (from meeting 1st March 2019)
PN UNC Workgroup iGT Services
Modification 421 – Updates and Benefits Case
Meter Reads.
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
Customer Issue Management CoMC Update for June 2019
Enabling Large Scale Utilisation of Class 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08

2 v1 Current Position Mismatch between CSEP v iGT Invoicing 75,750 (Gas Forum data - January 08) Average domestic CSEP Transportation Charge per annum - £33.36 (CSEP Invoice) Estimated under-recovery of CSEP Transportation for DNs - £2.53m RbD energy misallocation = 1.309,263,000kWh (1.309TWh) 44,673,919Therms (Based on average customer AQ 17,284k – SP CSEP Invoices) Average SAP Price = 52p/Therm Potential misallocated energy based on average SAP = £22.23m per annum CSEP Rejections do not stop energy flow – impacting Shipper billing and RbD allocations only No incentives for DNs and iGTs to resolve

3 v1 Overview of xoserve Role Will accept daily updates of AQ movements provided by iGT at MPRN level Process will take account of more frequent updates resulting from outputs of AQ Review process, potential Rolling AQ changes xoserve will no longer reject AQ updates that are a direct result of failures within the connection process (including information exchange) Rejection will only occur due to file structure/file format errors only Updates that would have previously rejected due to connection process failures will be handled offline and resolved directly between iGTs and DNs within acceptable timescales outlined within NExA CSEP Invoice will be at MPRN level split by Charge Type (no need to use LMNs) – see Appendix for draft invoicing file formats AQ Updates passed within day to Gemini for gas allocations (D+8)

4 v1 Overview of iGT Role IGTs will provide xoserve with daily updates of connections and changes of supply. iGTs involved in Nests will be permitted to nominate portfolio movements directly to xoserve Reconciliation volumes will be submitted directly by all iGTs (including Nested) Updates will be provided on a daily basis at MPRN level Invoice Shippers at MPRN level on a monthly basis (Shippers can challenge iGT invoice for data inconsistencies when directly compared made against CSEP Invoice)

5 v1 CSEP Billing Solution Xoserve (Transmission & DN) IGT (including nests) nominates directly to xoserve On daily basis Shipper Transmission & DN agent issues bill for transportation to shipper on an MPRN basis each month Invoice Transportation is billed to a shipper on a MPRN basis each month Dataflow of energy allocations – daily from Gemini to shipper Gemini IGT Transmission & DN Agent aggregates information about CSEP and inputs into Gemini UNC IGT UNC

6 v1 Discrepancies will be managed offline and resolved under terms specified in Network Exit Agreement between DNs & IGTS (this will not affect invoicing) File Formatting Rejections CSEP Billing Solution – Data Processing Xoserve (Transmission & DN) IGT (including nests) nominates directly to xoserve On daily basis IGT Network Offtake Discrepancies Rejections will be resolved within 2 Business Days

7 v1 Governance Framework Network Exit Agreement The relationship between each DN and iGT and each other DN or iGT should be set out within a generic Network Exit Agreement. This document will outline the rights and obligations with regard to engineering and operating arrangements for network connections and offtake from system(s). Governance of this Agreement should be considered under SPAA. UNC Terms will be extended to reflect DN obligations in relation to accepting and processing update files from IGTs and the invoicing of Shippers at MPRN level by charge type. Will also reflect any additional obligations specified under the terms of the Network Exit Agreement that affect the calculation of offtake quantities, the proportion of Transportation Costs and to facilitate the reconciliation of Larger Supply Points. iGT UNC Terms will reflect that iGTs should submit updates at MPRN level on a daily basis. Nested networks will be permitted to submit updates and I&C reconciliations directly to xoserve. The iGT UNC will also be updated to reflect any additional obligations specified under the terms of the Network Exit Agreement that affect the calculation of offtake quantities by DNs, the Review of Annual Quantities and the reconciliation of Larger Supply Points.

8 v1 Next Steps Immediate steps to be taken to reduce the mismatch of Meter Points between CSEP and iGT Invoicing. One off downloads from each iGT –Xoserve to confirm if they can accept LMN updates directly from Nested iGT if not interim solution should be urgently explored Review of current rejection codes to ensure that network connection failures do not impact iGT AQ updates I.e. allow CSEP AQ values to be updated and CSEP Invoicing to be corrected Commitment from iGTs/DNs to seek and resolve network connection issues within set timescales - priority UNC/iGT UNC Development Workgroup to be formed to outline and agree Business Rules and procedures for proposed Solution Development of multi-lateral Network Exit Agreement Gemini solution should be pursued to reduce D+8 timescales for gas allocations (2012) Review of CSEP Administration charge – already deemed as User Pays