Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.

Slides:



Advertisements
Similar presentations
F1 Contribution to ILC Vertex Detector Tobias Haas 23 Febuary 2005.
Advertisements

Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
Octobre MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
L.Vitale INFN and Univ. Trieste
Testbeam Planning Common to all testbeams:
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
KEK news ( ) S.Tanaka.
STT Detector risk’s assessment
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings.
10/month is the present production rate 2 FTE + sporadic contributions
Work packages status in Torino and perspectives
Comments to the SVD4 structure
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
SVD group organization, schedule, milestones
Presentation transcript:

Tasks and time scale T. Tsuboyama (KEK)

DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business. – The first sample comes in 1.5 years Mass production – Sensor characterization. – Quality control

Readout APV25 hybrid – Origami (C. Irmler) and Normal – Production – Quality control --- Test Repeater – Location should be decided. (Not yet clear) – Mechanical and Electric design – Mass production Backend – COPPER/FINNESSE – Mass production DAQ software – Slow control

Mechanics Discussion with KEK engineering group has started. Support – Joint work with IR/DEPFET/Strip design is necessary – Connection to CDC/IR/DEPFET – Design: Cooling of normal hybrids – Construction Ladder production – Design – Assembly procedure – Storage – Booking and testing Ladder mount scheme and procedure

Infrastructures Monitor – Radiation and Beam abort – Temperature Cooling – Chiller/coolant – tubing – Special consideration of Origami cooling tubes Cables – Power supply / signal / control / Power supply: – 3 times larger system than the present SVD Krakow and Prague groups are designing power supply system common to SVD and DEPFET

System integration Definition of Integration strategy. Online software – Cluster finding and time reconstruction – Calibration – Performance monitor Data quality monitor Quality assurance monitor Test with source /laser (?) Debugging hardware and software Calibration Cosmic ray test Commissioning Pixel + SVD should be done together.

Offline Software Hara san is now working for overall computing and has not time to contribute to SVD Calibration / Database Alignment – For physics study, much better svd/pixel alignment and reliable tracking (CDC+SVD+PIXEL) is necessary Simulations – A GEAN4 version is reported by Drasal (Prague) – Detector optimization Tracking – CDC track extrapolation – Evaluation of SVD only tracking A. Moll (MPI) – New alignment efforts A. Moll (MPI)

Schedule Japan Fiscal Year DSSD prototyping DSSD production Ladder/Structure design Support production Ladder production FADC production DAQ preparation Ladder mount System test Installation