PRESENTATION ON WATER COOLING TOWER

Slides:



Advertisements
Similar presentations
Fall 2002 Technical Development Program
Advertisements

BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
ARC313 Building Code II. Review What is the minimum bearing pressure allowed for soils to support foundations? 75 kPa How can you tell by looking at the.
Measurement for Civil Engineering works
Chp12- Footings.
Lecture 9 - Flexure June 20, 2003 CVEN 444.
PIPE CULVERT By CH. VENKATARAMAIAH.
CE-303-Lecture #1 Fundamentals of Concrete Objectives To explain the basic concepts of concrete To explain briefly the properties of freshly mixed concrete.
Reinforced Concrete Design
Curing and Protection of Concrete
WORKSHEET 4 CONCRETE. Q1 a) what are the two main properties that concrete must have? (i) strength b) how do we achieve them? by using an acceptable water.
Foundation Systems.
Chapter 33 Foundation Systems.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Civil Engineering Materials
Batching, Mixing, and Handling. Ordering or Specifying Concrete Alternative (1) Common: When the owner requires the concrete supplier to assume responsibility.
Basic Civil Engineering-Foundation
STEAM CONDENSERS.
Floor Systems and Foundation Support
Chapter 18 Foundations.
Building Foundations Foundation Walls.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Placing Quality Concrete
Natural Draft Cooling Towers
COOLING TOWER Prof. Osama El Masry.
Introduction to a pit installation
Pavement Analysis and Design
Plain Concrete I. *Definition 1. Concrete: a hard, strong construction material consisting of a hardened or set mixture with such aggregates as sand, gravel,
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Design of Concrete Structure I Dr. Ali Tayeh First Semester 2009 Dr. Ali Tayeh First Semester 2009.
Site Work.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
CHILLED WATER AIR-CONDITIONING SYSTEMS
University of Sydney – Structures CONCRETE Peter Smith 1998 Concrete Making and Testing l Unique material çMade specially for each job çHandling on job.
Introduction to Energy Management. Week/Lesson 9 part a Evaporative Cooling and Cooling Towers.
1.Initial setting time of cement:  40 to 60min  30 to 60min  15 to 60min  35 to 60min.
BUILDING CONSTRUCTION
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Mahatma Gandhi Institute of Technical Education & Research Centre
CAISSON FOUNDATION.
Curing Definition The process of prevention of loss of moisture from fresh concrete while maintaining satisfactory temperature regime (BS 8110) Fig: The.
5. FERROCEMENT.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
CRACKS IN BUILDINGS: Some Remedial Measures
CONCRETE AND SUSPENDED TIMBER
Foundation – jay Desai.
Use of Modern Retrofitting Techniques in Udaipur Station Building
Desert Cooler.
TECHNICAL SPECIFICATION AND REQUIREMENTS
Prepared By: Alka Shah Civil Engineering Department
Internal Training Module
S.T.B.S College of Diploma Engineering, SURAT
CEN 180: Civil Engineering Drawing II
EARTHING.
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Cast in Place 2 way Flat slabs Basically joists in both directions
GOALS For the classification of cracks in the wet and hardened concrete. To diagnose cracks in concrete structures and determine their types.
Arch205 Materials and building construction 1 foundation
COOLING TOWER.
PAVEMENTS CEE 320 Steve Muench.
Batching, Mixing, and Handling
Arch205 building construction foundation
What is CONCRETE SLUMP TEST –
Concrete A structural material made by combining cement, sand, aggregate, and water.
BUILDING CONSTRUCTION Foundation
Presentation transcript:

PRESENTATION ON WATER COOLING TOWER

INTRODUCTION OF RGTPP The Plant is Located near Ramgarh Town of District Jaisalmer in Rajasthan. The Plant is 60 Km from Jaisalmer. The installed capacity of the first stage is 110 MW. The GAIL Pipeline is approximately 35 km from the Ramgarh Site, from where a tap offline is also taken.

WATER COOLING TOWER Cooling tower is a heat rejection device, which extracts water heat to the atmosphere though the cooling of a water stream to a lower temperature. The generic term "cooling tower" is used to describe both direct (open circuit) and indirect (closed circuit) heat rejection equipment.

SPECIFICATION OF LOADING & RCC MATERIAL The specifications covers general requirements of materials, design, construction and testing of RCC works involved in the construction of RCC induced draft cooling tower. Loading Concrete works Reinforcing steel Structural steel Painting for concrete surfaces

Loading Wind loads shall be considered as per IS:.875(part-3) Earthquake loads shall be considered as per IS:1893 duly considering the type of soil and foundation system Dead load shall be considered as per IS:875(part-2).

Concrete Works Cement used shall be OPC complying with IS:8112 Minimum grade of concrete for various structural components shall be M 25. Minimum cement content per/cum of concrete shall be as specified in IS:456. Minimum cement content shall be used as per IS:456. Material design, construction and workmanship in general shall conform to IS:456 and IS:3370. For pre stressed concrete works, design, construction and workmanship shall be in accordance with IS:1343

Reinforcing steel Reinforcement bars shall be either mild steel conforming to IS:432 or high yield strength reinforced bars conforming to IS:1786 Steel wires for pressurising shall conform to IS:1785(part 1&2) minimum diameter of steel wire of 4mm

Structural steel Steel used shall conform to IS:2062 grade A or B as specified. The minimum coating of zinc shall be 500gm/m^2 and shall comply with requirements of IS:2629 and IS:2633. Galvanised surfaces shall be further protected by providing two coats of bituminous coating conforming to IS:1962 after applying etching primer coat as per IS:5666.

Painting for concrete surfaces Water proof bituminous paint conforming to IS:9862 shall be provided to concrete surfaces . The preparation of concrete surface for painting shall conform to IS:2395(part-1). Painting shall consist off one coat of primer conforming to IS:9862 and two coats of bituminous painting conforming to IS:3384

CONSTRUCTION OF WATER COOLING TOWER EXCAVATION PLAIN CEMENT CONCRETE REINFORCEMENT FOR RAFT RAFT CASTING COLUMNS BEAMS & WALLS SLABS CURING

1.EXCAVATION Excavation is done for dimensions of 20 mx12mx2m. The earthwork so excavated is removed from the site with the help of JCB & truck.

2.PLAIN CEMENT CONCRETE PCC is done above the compacted earth surface using concrete material of grade M5. The ratio of materials used in PCC is 1:4:8. The PCC is done before the placement of reinforcement for raft foundation so as to prevent the rusting of the reinforcement by oxidation process which takes place in presence of moisture of earth surface & the air.

3.REINFORCEMENT FOR RAFT

4.RAFT CASTING Concrete of grade M10 is used for casting of the raft foundation. The ratio of material used in concrete for raft casting is 1:3:6

STAGES OF RAFT CASTING Batching

II. Mixing

III. Transportation & placing

IV. Compaction Compaction of concrete in raft foundation is done by needle vibrator.

It consist of power unit, flexible shaft & needle. It is used for removal of air voids in concrete paste. Frequency = 12000 cycles of vibrations/minute Needle dia. =20mm to 75mm. Length of flexible shaft= 25 to 90 cm.

5.COLUMNS Formwork is used for erection of the material which is used for construction of columns & beams of the water cooling tower Formwork vibrator is used for compaction of the concrete columns

6.BEAMS & WALLS Beams are casted at a height of 3m from the raft casting with the spacing of 30cm along the width of cooling tower. A gap of 1.2m is left vacant above the layer of the beam and beneath the stone wall for placing the 3 layer of fill pack material. Stone wall is constructed above the layer of beams separating each of the adjacent cell of the cooling tower(7 in no.).

Above walls separating each shell of cooling tower a layer of beams is provided with a spacing of 30cm along the width of cooling tower. A layer of drift eliminator is placed above this layer of beam within the spacing's created by the layer of beams. Stone walls are constructed immediately above the second layer of beams .

7.SLABS One way slab is constructed above the walls of the shells with openings left for casting of the fan cylinder.

8.CURING After concrete is placed, a satisfactory moisture content and temperature must be maintained, a process called curing. Adequate curing is vital to quality concrete.  Curing the concrete aids the chemical reaction called hydration. Most freshly mixed concrete contains considerably more water than is required for complete hydration of the cement; however, any appreciable loss of water by evaporation or otherwise will delay or prevent hydration.

SHELL OF COOLING TOWER

COMPONENTS OF WATER COOLING TOWER Cold Water Basin Fill Media Plastic Pipes With Nozzles Drift Eliminators Erection Of Fans.

1.COLD WATER BASIN

The basin floor of each compartment shall be sloped towards a collecting sump for effectively draining the water to permit desilting / desludging. Water shall be drained from the sump into a drain chamber outside the basin by CI drain pipe embedded below the basin floor.

2.FILL MEDIA

Plastics are widely used for fill, including PVC, polypropylene, and other polymers. Three layers of fill media is used in each shell with a total of 1308 pieces, 436 per layer. Plastics are glued together with solgum cement(16 pcs. Of PVC sheets are glued to form 1 piece of fill media) Fill pack size 300mm x 600mm (42 pcs. In top layer) 1220mm x 300mm(394 pcs. In top layer) 600mm x600mm (middle layer) 1200mm x 600mm (bottom layer)

3.PLASTIC PIPES WITH NOZZLES 18 pipes are arranged in each shell of cooling tower with 9 pipes on each side of the channel carrying the hot water brought from the power plant through large pipes .

4.DRIFT ELIMINATORS These capture water droplets entrapped in the air stream that otherwise would be lost to the atmosphere Air after passing through the fill media is moving upwards with air velocity sufficiently large to provide an upward thrust for small water droplets in the cooling tower.

5.ERECTION OF FAN Gear box Shaft Electric motor