SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte 2015-11-11.

Slides:



Advertisements
Similar presentations
Domino.Doc Project Overview Project Rollout/Schedule Preview Eastman Kodak Health Imaging Doug Smith.
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
CS 501: Software Engineering Fall 2000 Lecture 4 Management I: Project Management.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
Systems Engineering Management
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
SKA Pre Construction Phase Infrastructure Tracy Cheetham Carel van der Merwe General Manager: Infra & Site OpsInfrastructure System Engineer
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
INFRA:DISH = DISH INFRA: LFAA = LFAA INFRA:SDP = SDP INFRA:CSP = CSP INFRA:SADT = SADT INFRA:MGR = MGR INFRA:AIV = No IF? Infra ICD Leads.
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Project Name Company Name Presenter Name
By: Anjaneya Datla. What are TDMA Systems? Time division multiple access (TDMA) is a channel access method for shared medium networks. Several users can.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
Anders Sunesson RF Group ESS Accelerator Division
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Summary of the Paris SKA Meeting 4-8 September 2006 R. T. Schilizzi.
Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.
Assembly, Integration & Verification 2015 SKA Engineering Meeting Richard Lord 11 November 2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
SKA Interface Workshop: AIV Interfaces – Summary and Wrap AIV consortium Manchester June 2013.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Telescope Teams P. Dewdney Telescope Teams – relationships with System Design General role of the Architect Group is ‘Guardians of the Design’.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Head of Project Update Alistair McPherson November 2015.
SKA Configuration Management Engineering Meeting Susan Nel
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Towards System Review et al SKA Engineering Meeting 2015 Tim Stevenson
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
2016 PG&E DATA CENTER BASELINE STUDY Jeff Stein, PE Brandon Gill, PE.
SKA Interface Workshop: AIV interfaces AIV consortium Manchester June 2013.
Engineering Commissioning May 2016 SKA1 LOW – Assembly, Integration & Verification Adam MacLeod AIV Consortium Manager & ASKAP System Engineer.
SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.
SKA Status – Tango Collaboration Meeting Lize van den Heever June 2016.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
“Other” Cost Estimates
Supportability Design Considerations
CYCLONE Filtration System.
Growth in electricity generation over time
ASTERICS Kick-Off Meeting: SKA links and interaction
PM view of SAFe SAFe Construction Planning Workshop A J Casson
SKA Element Interface Management Workshop CSP Element
COST PLANNING AND ESTIMATION
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
INTEGRATING THE SKA-MPI DISH INTO MEERKAT
SADT Overall Summary Total ICD count is currently 37 system level ICDs across 6 Elements LFAA 3 ICDs DISHES 7 ICDs CSP 12 ICDs TM ? Unable to proceed.
Financial benefits of solar and wind power in South Africa in 2015
A Draft Funding Model for the SKA
SAFe Workshop SDP Ferdl Graser SDP Systems Engineer 2 October 2017.
SDP-lead Interfaces Summary
Infrastructure Interface – Power, cooling & building
Project Plan MS Project Example (Optional)
Presentation transcript:

SKAO Power Update 2015 Engineering Meeting: Penticton Adriaan Schutte

Power Restrictions on Sites Consumption Management –General budgeting procedure –Power budgeting –Power Maturity Levels (PMLs) & milestones –Power allocations Power Quality Standard Overview Footer text

SA: 4MW available (transient effects) Power Restrictions Footer text

Aus: Primarily diesel-based, high cost Power Restrictions Footer text

General Budgeting Process: Consumption Management Footer text

General Budgeting Process: Consumption Management Footer text

Tailored to power management Include: –Reticulation as loads –Supply cost –Operational budget Consumption Management Footer text

Power Maturity Levels (PMLs) –Based on Technology Readiness Levels (TRLs) –Evidence required (same data as for simulation) Consumption Management Footer text PML Required PML Evidence RequiredMilestone 1Power estimates based on first order calculations 2Estimates based on engineering analysis and simulation Preliminary Design Review (PDR) 3Measurements in laboratory environment on test setups PDR +9 Months 4Measurements in laboratory environment on breadboards CDR -6 Months 5Measurements in a representative environment + PQ Critical Design Review (CDR) 6Short term measurements + PQ on prototype for all operating scenarios Production Readiness Review 7Medium term measurements +PQ on prototype for all operating scenarios Before Site Testing is Allowed 8Medium term measurements on at least one production unit at site Before Site Operation is Allowed 9Long term measurement on multiple production units Completion of Commissioning

Reporting in detail design phase: –Revised power reporting document issued –Implement PMLs “Engineering estimates” no longer OK Require simulations and then measurements –Implement time-domain simulation Require power models from Consortia Consumption per science use case (Day in the Life) Identify other effects: –Modes –Temperature (e.g. cooling systems) –Wind (e.g. dishes) –Etc. Consumption Management Footer text

Recap: baseline v2 allocations SKA1 Low: When running on diesel: 12,000 litres / day Consumption Management Footer text ElementAverage & Peak Power Consumption (kW) LFAA1,064 CSP Low Imaging30 CSP Low Non-Imaging144 TM Low20 SADT Low50 INFRA-AUS (LFAA)15 Cooling & Site Dist. Losses (INFRA) 741 SKA1 LOW TOTAL2,062

Recap: baseline v2 allocations SKA1 Mid: When running on diesel: 30,000 litres / day Consumption Management Footer text ElementAverage Power Consumption (kW) Peak Power Consumption (kW) Karoo Site Complex (incl. DRUPS, sheds, etc) Existing Equipment (KAT-7, etc).4556 MeerKAT Dishes (64) SKA1 Mid Dishes (133)1,1301,530 CSP Mid Imaging170 CSP Mid Non-imaging420 TM Mid20 SADT Mid110 Cooling & Site Distribution Losses (INFRA-SA) SKA1 MID SITE TOTAL4,0074,865 33kV Line Losses Klerefontein Support Base2545 Carnarvon POP Station510 SKA1 MID KAROO TOTAL4,4875,610

Operational cost (approx.): –SKA1 Mid: Eur 7.5 mil / year (grid only) –SKA1 Low: Eur 8 mil / year Power cost is about 25% of annual budget –Assuming ops budget is 10% of Eur 650 mil –Assumptions on SDP consumption Power Budget Footer text

SKA PQ standard developed by INFRAs Replace PQ sections in all ICDs Based on international standards Checked against ALMA and E-ELT standards Status: –In final review –To be issued very shortly Power Quality Footer text

Thank You Questions?