October 1, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Effective Methods for Software and Systems Integration
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 25 June, 2002WFC3 Monthly Status Review1.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
September 10, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Development Report Engineering Node August 2006
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
I&T&C Organization Chart
2011 Prioritization Update to Market Subcommittees
GLAST Large Area Telescope
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
GLAST Large Area Telescope
STScI Ground System Development Status:
GLAST Large Area Telescope:
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level testing– Linda K, Robert, Gavin, Allison 2.Complete build & EEPROM install – Justin, Robert This build completes code & unit test for the following 4 CSCs:, - CS DCE, CS DIB, CS MCE, DIB CSCI Chris Dorato 1.Sept 28 2.Oct 5 COS FSW Build 3.2 HW needs: nothing new FSW support to MEB testing takes no more than 1 week Complete code development: 1.Mechanisms part2 – Robert, Linda 2.Diagnostics – Linda 3.Start Target Acquisition - Robert 4.Complete code walkthrough 5.Complete unit level testing 6.Complete build & EEPROM install – Justin, Linda 7.Develop formal release procedure & execute - Justin This build completes code & unit test for the following 2 CSCs: - Mechanisms & Lamps, Diagnostics Chris Dorato 1.Oct 12 2.Oct 26 3.Nov 2 4.Nov 9 5.Dec 31 6.Jan 4, Jan 5, 2002 HST Software & Operations Task/Action Status Need to update dates based on completion of Build 3.1

October 1, TaskLeadDue Dates COS FSW Build 4 HW needs: nothing new 1.Complete code development –Complete code walkthroughRobert, Linda 2.Complete unit level testing 3.Complete build & EEPROM install 4.Linkfile updates & general cleanup This build completes code & unit test for the last CSC: Target Acquisition Chris Dorato 1.Feb 15, Mar 1, Apr 3, Apr 5, Apr 30, 2002 HST Software & Operations Task/Action Status Need to update dates based on completion of Build 3.1

October 1, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record & Analysis Memory Load & Copy (Steve) Done Buffer Memory Mgnt (T Tag) (Steve) Done Sept 21 Sept 28 CS DIB (Hugh) Done1/15 & 1/252/28 & 3/8 3/15 NED (Adam) Done 10/12 Memory/Image Dump (Steve) 9/28 & 10/510/19 & 10/2611/2 & 11/16 11/23 CS DCE (Gary) Done10/12 & 10/1910/26 & 11/2 11/9 CS MCE (Denise) 10/5 & 10/1210/26 & 11/211/9 & 11/16 11/23 Diagnostics (Gary) 1/18 & 1/252/8 & 2/153/1 & 3/8 3/15 Mechanisms & Lamps (Tina, Rich) Done10/12 & 10/1911/9 & 11/16 11/23 DIB CSCI (Hugh) 12/14 & 12/171/18 & 1/252/8 & 2/15 2/22 HST Software & Operations Task/Action Status FSW Bld 3.1 FSW Bld 3.2

October 1, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record Buffer Memory Mgnt (T Acq) (Steve) Done 4/26 & 5/3 5/10 Target Acquisition (Gary) 3/29 & 4/54/19 & 4/265/10 & 5/17 5/24 System Init & Service Functions (TBD) HST Software & Operations Task/Action Status FSW Bld 4 TaskHigh ReuseLow Reuse Test Plan1 week2 weeks Peer Review1 week Test Procedure, CCL, SMS 1 week2 weeks Peer Review1 week Bench I&T w/FSW1 week2 weeks Dry Run1 week Run for Record1 week Adjust durations to account for CSC unique attributes and personnel resource.

October 1, COSWFC Mem Img Dmp CS DIB DIB CSCI CS DCE CS MCE MLCM&IDBMM Steve Hugh Gary Diagnostics Target AcquisitionFQT Denise Boot NEDDiagnostics FQT Brian Telemetry IR Detector Todd CMD Mechanisms Rich UVIS Detector Component testing provides: Test environment checkout and FSW I&T. Early testing helps lower cost and shorten schedule. Risk to FHW is reduced when component testing is first completed on the FSW. Mechanisms Limits Sept Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sept TBD1 TBD2 Tina MLC, Lim, NED Dry & Final Runs M&ID, BMM, Diag Dry & Final Runs HST Software & Operations Task/Action Status Boot NED

October 1, TaskLeadDue Dates COS Non-Flight Software 1.Complete the FUV detector simulator– Dina, Allison (Waiting for completion of FUV ETU Testing) - verify simulator responses for Door commands + 3 others 2.Mechanism test software ready for Aperture testing – Jeff Chris Dorato 1.Oct 12 2.Nov 1 COS MEB Functional Test Preparation 1.Mech Sim test and certify – John, Sue 2.Support HW (Cables, LVPS loads, etc.) – Chuck, Bob L 3.Science Data Generator software 4.SMS development & test – Brian & Mike 5.Test procedure released – Sue, Todd 6.Ops product development & database certification – Linda R 7.Flight Electronics Ready - Virg 8.Flight database build complete – Chris B 9.Flight software build 3.1 complete – Justin, Robert 10.Dry run test on SW/Ops Test Bench – Sue, Linda, Ken, Soraya 11.Test readiness review – Sue 12.Standalone backup on SITS 4 – Justin 13.Load Build 3.1x onto flight hardware – Justin, Robert, Soraya Sue Ross 1.Oct 12 2.Oct 12 3.Oct 12 4.TBD 5.Oct 5 6.Sept 7 7.Aug 24 8.Oct 8 9.Sept Oct Oct 5 12.Oct Oct 24 HST Software & Operations Task/Action Status

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates COS FUV ETU HW/SW Integration Test 1.Complete Test #2 with new DCE & CS DCE code 2.Send image data to STScI – Ken Ken Brownsberger 1.Oct 5 2.Oct 8 COS OSM2 I/F Test HW needs: Ops test bench w/ new mech sim, Flow bench, OSM2, cable, scope (in cal) w/prob 1.OSM2 available for test (binding problem) 2.Complete test procedure and conduct peer review – Tina, Jeff 3.FSW Build 3.1 image ready – Chris D. 4.Dry run procedure 5.Run test bench certification procedure – Tina, Jeff 6.Test Readiness Review – Tina, Jeff 7.Perform test – Tina, Jeff Tina Fredo 1.Sept 20(TBD) 2.Sept 7 3.Sept 21 4.Sept 24 5.Sept 27 6.Oct 1 7.Oct 1 COS External Shutter Mechanism Test HW needs: TBD test bench & SITS, flow bench?? 1.Perform test Robert Gillett 1.Oct 8-9

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates COS Software & Mechanism I/F Testing 1.OSM1 – Tina, Jeff 2.Aperture – Tina, Jeff Tina Fredo 1.October 26 2.November 22 COS Documentation 1.DM-01 SI Commands List – Chris B 2.DM-02 Engineering Data List – Chris B 3.DM-03 FSW Everything Document – Chris D - Update requirements, hold CCB & re-release - Release with FSW build DM-04 GSE Software – Dina 5.DM-05 Command Definition – Linda R 6.DM-06 Science Data Format – Linda K 7.DM-08 FSW Test Procedure – Denise 8.DM-14 Telemetry Calibration List – Chris B 9.OP-04 Constraints And Restrictions Document (CARD) – Hugh 10.OP-04 Operations Limitations Document (OLD) – Hugh Grant Blue 1.Sept Sept Sept 2002 Sept Sept Oct 31, Oct 5, Dec. 15, Sept TBD 10.TBD SI Delivery Date: Sept 29, 2002

October 1, COS Action Item List 1.Grant, Sue – Expedite updating second COS Mech simulator. 2.Ken – Plan FUV ETU HW demo with Code 582 & Ball (Mid October) 3.Justin – Review list of non-flight software with Chris Dorato 4.Justin – Develop formal release procedure 5.Chris Dorato – Get CCB approval for COS FSW requirement changes & republish DM-03 6.Grant – Include STScI MOU dates in status HST Software & Operations Task/Action Status

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 2.1 (finish on WFC3 Test Bench) HW needs: MEB CS (in place) 1.Rebuild FSW image with proper name: 2.1 – Justin This build completes code & unit test for the following 7 CSCs: - Command, Telemetry, Error, Limits, - Memory/Image Dump, Memory Load & Copy, - Buffer Memory Management Chris Dorato 1.Sept 28 BOOT Code Development & Test HW needs: MEB CS (in place), SES1 (10/29) 1.Complete code walkthrough – Dominic 2.Complete I&T on test bench – Dominic 3.Burn PROM, install on benches and verify– Dominic, Jason This effort completes code & unit test for the BOOT CSC Chris Dorato 1.Oct 15 2.Nov 12 3.Nov 16

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 2.2 HW needs: SES2 (10/19), SES3 (9/14), SES4(9/7), MecSim1 (10/1), Ops test bench available for comp test & ops develop. 1.Complete code development: - Mechanisms (SOFA, Shutter, Correctors) – Dominic, Jason - Service Functions - TBD 2.Complete code walkthrough – Jason, Dominic 3.Complete unit level testing – Jason, Dominic 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the Service Functions CSC Chris Dorato 1.Oct 1 2.Oct 15 3.Nov 15 4.Nov 17 WFC3 Flight Software Build 2.3 HW needs: SES1 (10/29), SES2 (10/19), MecSim2 (TBD) 1.Complete code development: - Mechanisms (CSM, IR FSM, Lamps) – Dominic - NED – Jason - Diagnostics - Jason 2.Complete code walkthrough – J, D, G 3.Complete unit level testing – J, D, G 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the following 3 CSCs: - Mechanisms & Lamps, NED, Diagnostics Chris Dorato 1.Nov 30 2.Dec 15 3.Jan 31, Feb 4, /15 Dates need to change to reflect MechSim availability

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 3 HW needs: complete test bench (December) GSE SW needs: Detector Simulator, Science Data Generator 1.Complete code development: - UVIS Detector (BOE: ACS MCE/MIE) – Dominic - IR Detector – Gavin 2.Complete code walkthrough – Gavin, Dominic 3.Complete unit level testing – Gavin, Dominic 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the last CSCs: - UVIS Detector, IR Detector Chris Dorato 1.Dec 31 2.Jan 15, Mar 15, Mar 30, 2002 IR: 100 days Start: 11/1/01 BOE: ACS MCE & MIE UVIS: 40 days

October 1, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record & Analysis Command (Todd) Done 9/28 & 10/5 11/2 & 11/9 11/16 Telemetry (Brian) 9/28 & 10/1211/2 &11/911/30 & 12/7 12/14 Error (TBD) Limits (Gary) 11/16 & 11/2311/30 & 12/712/14 & 12/21 1/4 Memory/Image Dump (Steve) 1/18 & 1/252/1 & 2/82/15 & 2/22 3/1 Mem Load & Copy (Steve) 11/23 & 11/3012/7 & 12/1412/21 & 1/4 1/11 Buffer Mem Mgt (Steve) 3/8 & 3/153/22 & 3/294/5 & 4/12 4/19 Boot (Denise) 12/14 & 12/211/11 & 1/182/1 & 2/8 2/15 HST Software & Operations Task/Action Status FSW Bld 2.1

October 1, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record & Analysis Service Functions (x) NED (Denise) 2/22 & 3/13/8 & 3/153/22 & 3/29 4/5 Diagnostics (Denise) 4/12 & 4/194/26 & 5/35/10 & 5/17 5/24 Mechanisms & Lamps (Brian) 1/18 & 1/252/15 & 2/223/8 & 3/15 3/22 IR Detector (Gary) 4/5 & 4/124/26 & 5/35/17 & 5/24 5/31 UVIS Detector (TBD) HST Software & Operations Task/Action Status FSW Bld 2.2 FSW Bld 2.3 FSW Bld 4

October 1, TaskLeadDue Dates WFC3 Non-Flight Software 1.Proto (MEB sim) UVIS & IR image cmd & data capture - supports MEB flight board testing 2.Proto (MEB sim) Det Sim HW checkout with SES1 board 3.UVIS & IR Detector Sim NFSW (runs on PC in Test Bench) - supports HW Detector Simulator & FSW testing 4.UVIS & IR Science Data Generator NFSW - supports FSW testing 5.HSTView – Update for noise testing 6.UVIS & IR Corrector Performance Verification – Jeff 7.IR Filter Wheel Performance Verification – Jeff 8.Channel Select Performance Verification – Jeff 9.UVIS Shutter Performance Verification – Jeff 10.UVIS & IR Corrector Optical Alignment – Jeff 11.IR Filter Wheel Optical Alignment– Jeff 12.Channel Select Optical Alignment– Jeff Chris Dorato 1.Oct 2 2.Oct 29 3.ASAP 4.Dec /18 6.Oct 12 7.Oct 26 8.Nov 16 9.Nov Dec 7 11.Dec Dec 21 HST Software & Operations Task/Action Status

October 1, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Documentation 1.DM-01 SI Commands List (IR: 3/27/01) – Adam 2.DM-02 Engineering Data List – Adam 3.DM-03 FSW Design Document – Chris D 4.DM-04 GSE Software – Dina 5.DM-05 Command Definition (IR: 5/17/01) – Mike 6.DM-06 Science Data Format (IR SER: 6/29/01) – Adam STScI needs update with new Eng Snapshot Data 7.DM-08 FSW Test Procedure – Denise 8.DM-14 Telemetry Calibration List – Adam 9.OP-04 Constraints & Restrictions Doc (CARD) – Tim, Todd 10.OP-04 Operations Limitations Document (OLD) – Tim, Todd Grant Blue 1.Aug 15, Oct 15, Aug 29, Aug 15, Sept 30, Oct 15, 2001 Oct 1, TBD 2.Nov 30, TBD 4.TBD SI Delivery Date: Aug 15, 2002

October 1, TaskLeadDue Dates Schedules 1.Update Master Schedule – Grant Grant Blue 1.Sept 14 COS/WFC3 Transition Plan 1.Rework outline as required 2.Initial release Grant Blue 1.Sept 15 2.Sept 31 STScI Dates of Interest 1.Provide Test Bench image data from both detectors (scidatagen) 2.Provide Surrogate detector images w/flight MEBs Grant Blue 1.Mar 1, June 1, 2002 HST Software & Operations Task/Action Status

October 1, WFC3 Action Item List 1.Grant – define date for DM-08 & OP-04 HST Software & Operations Task/Action Status