PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.

Slides:



Advertisements
Similar presentations
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Unit 50 Roof Trusses Truss Types and Components • Principles of Truss Design • Truss Fabrication • Installing Roof Trusses • Truss Safety.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Chapter 19 Floors.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Copyright © 2009 Pearson Education, Inc. An object with forces acting on it, but with zero net force, is said to be in equilibrium. The Conditions for.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Beams - structural members supporting loads at various points along the member. Transverse loadings of beams are classified as concentrated loads or distributed.
Framed Structures Luisana Hernández.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Competency: Draw wall sections and details
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
S A Griffiths CM42 June 2015 Electrical & Control.
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
Mezzanine Update.
LBNF CAD models, Drawings and Component list
PANDA Yoke of the Magnet
MICE Partial Return Yoke Mechanical Design
Step IV PRY Preparation - Contents
MICE CM31 Schedule summary
Competency: Draw wall sections and details
Integration issues at IHEP
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Project Design & Construction
Competency: Draw wall sections and details
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
ROOFS.
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
Presentation transcript:

PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation l Absorber Change l Schedule l Conclusion Jason Tarrant – Integration Engineering

PRY Base - Requirements l Requirements – Load (before cross-bars added) Fix to floor ~25 tonnes (self weight) Overturning Compression Tension NO CAPACITY FOR SIGNIFICANT OVERTURNING FROM MAGNETIC LOAD – This will be taken by the cross-bars, leg ties & link plate connections

PRY Base - Environment l Requirements – North side Plate roof on north side Edge of floor / trench Services in trench on wall and ceiling Services trench directly under leg Trench ends False floor

PRY Base - Environment l Requirements – South side South mezzanine uprights Services trench Ramp Walkway

PRY Base - Environment l Requirements - Services Tracker Cryo South mezzanine Vacuum system

PRY Base - Design l TD North East Quadrant Existing Base PRY Legs PRY Connector Tie down bars and bases Support Bridge Trench & trench services Trench edge

PRY Base - Design l TD – North West Quadrant Existing Base (shown cutaway) PRY Legs PRY Connector Tie down bars and bases Support Bridge Trench & trench services Trench edge Short columns where raised floor ends Vacuum system (installed later)

PRY Base - Design l TD – South West Quadrant New base / platform PRY Legs PRY Connector Vacuum system Support Bridge Short columns where raised floor ends Tie down bars and bases Brackets and floor anchors

PRY Base - Design l TD – South East Quadrant New base / platform PRY Legs PRY Connector Support Bridge Services trench Brackets and floor anchors Vacuum system South mezzanine supports

PRY Base – Structural Integrity l Testing Floor anchor pull out (TD ) Component load tests l Analysis & calculation

PRY Base - Preparation l South Mezzanine Full length of hinged platforms Raised platforms Reduced leading edge & cut beams Removable section for easy absorber change Fit around PRY

PRY Base - Preparation l Trench Water circuit move Ladder move and change North-east tie bars pass between trench services (water and ISIS cables

PRY Base - Installation l Bases Floor anchors (TD ) Pillars, tie plates & sub-floor (TD ) Top plate installation (blue) & hole drilling (TD )

PRY Base - Installation l Installation Survey inside bridges into place Add legs & connectors (+ bespoke shims to set position) Add outer bridges Add tie downs / bolt to floor

PRY Base – Absorber Change Absorber change

PRY Base – Schedule l Schedule Prep for frame by July 2014, PRY install by end Aug 2014

Conclusion l Design done (top level = TD ,2153,2136 & 2090) l Calculation and analysis shows OK for self weight only (not magnetic load) in terms of stress and strain l Piece parts out for manufacturing quotation l South mezzanine structural engineering drawings near completion (OPUS) l RFS placed for floor quality tests l Load testing on critical parts will be undertaken l Possibility of strain gauges on critical parts as per main PRY (H Witte investigating) l Schedule currently predicting manufacture, prep and install to coincide with PRY delivery (final install dependant on PRY frame delivery)