Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug. 2010 – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Thesis 2005 Cira Centre – Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
World Trade Center 7 Building Performance Assessment.
JOSEPH MUGFORD THESIS PRESENTATION SPRING 2007 SOHO HIGH RISE CONDOMINIUMS A STUDY OF LIGHTWEIGHT CONCRETE CONSTRUCTION.
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
SMILOW CANCER HOSPITAL | 20 YORK STREET, NEW HAVEN, CONNECTICUT DANIELE R. NAVARRETE | STRUCTURAL OPTION
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Adam Love Structural Senior Thesis Presentation 2010 The Pennsylvania State University FDA OC/ORA Office Building Silver Spring, MD.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Palomar Medical Center West: Segmented Review Process.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Student Health Center Jacob Brambley - AE (structural option)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Daniel Suter Unknown Data Center Somewhere, USA
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Mississippi Riverbank Project (Final Presentation) May 14, 1999
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie Force Alternative Path Enhanced Local Resistance Architectural Breadth Conclusions Project Team Owner: Health Research Architect & Engineer: General Contractor:

Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie Force Alternative Path Enhanced Local Resistance Architectural Breadth Conclusions Progressive Collapse UFC 4-023: Typical Action Classifications Alternative Path Analysis Interaction Equation Moment Divided by m-factor Expected Strengths Used Typical Frames = 6

Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie Force Alternative Path Enhanced Local Resistance Architectural Breadth Conclusions Progressive Collapse West Façade Column Alternative Path Analysis

Architecture Breadth Existing Interior Atrium View Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie Force Alternative Path Enhanced Local Resistance Architectural Breadth Conclusions Atrium Curtain Wall Redesigned Interior Atrium View

Conclusions Goals Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie Force Alternative Path Enhanced Local Resistance Architectural Breadth Conclusions Costs Progressive Collapse Requirements Slab Reinforcement: 596% Increase Columns: 113% Increase Beams: 9.9% Increase Total Superstructure: 7.4% Increase Design to UFC criteria Explore impacts of this analysis Minimal architectural impact