H. Prin. 2015-05-27 2 Review of the present situation 1/2 Cold mass design: No significant improvement since Alexandre is finishing the work on the twin.

Slides:



Advertisements
Similar presentations
Options for sustainable construction. This module will describe the generic benefits of solid timber construction. The advantages of these construction.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Christian Löffler Collaring to cold mass finishing 2 Outline Available tooling and operational status CMM of 5.5m coils Instrumentation Pairing.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
TSI Plastics, Inc.. o TSI Plastics has been servicing the Aerospace & Defense Industries since 1959 as a contract manufacturer of custom fabricated parts.
MSE 440/540: Processing of Metallic Materials
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Features favoring PM Small Size Geometry - Flat surfaces with few thicknesses - Straight side walls (constant cross-section) - surface finish and precision.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Nonprofitfinancefund.org ©2009 Nonprofit Finance Fund.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 CASE STUDIES IN PROJECT MANAGEMENT Lecture 1 General issues on project management.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
AB-CO TC / J. Wenninger1 MCB orbit correctors  There are 752 MCBH(V) SSS orbit corrector circuits.  Individually powered by a ± 60 A, ± 8 V.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
AGENDA: 1) SDO Procurement ACTIONS has noted at last meeting (10 June): ALEXANDER: magnetic forces during assembly to be computed. In case, we could assemble.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
FCC week March 2015 Marriott Georgetown Hotel D2 for FCC P.Fabbricatore INFN Genova D2 for FCC P.Fabbricatore & S.Farinon INFN Genova Presented.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
1 JEOPARDY! Version 2005: Review for IED 2 Design Process Sketching Visualization Geometric Relations Modeling $100 $200 $300 $400 $500 Presentations.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Chapter Three Sections 3.1 through 3.4
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Plastic Injection Molding
ENVIRONMENTALLY RESPONSIBILITY
Cold mass design, assembly plans and QA/QC at CERN
Alignment of VSC components along LSS 1&5
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
DS11 T Transfer function, integral field and coil length
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Design of the He and HB ODU
the MDP High Field Dipole Demonstrator
Pierre-Alexandre Thonet
Analytical Cost Model (16 T dipole)
Parts exchange for HL-LHC AUP Q1&Q3
2K CB FDR Overview:  Agenda, Charge, Review Process
Electricity and Magnetism
Status of the PANDA Solenoid Magnet Production in BINP
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
Feed horn array sub-system for QUBIC
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
On the accuracy of port assembly at Wendelstein 7-X
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
High Precision Magnet Production for NSLSII at IHEP
ECR on pole order of the HL-LHC IT circuit and resulting implications
Presentation transcript:

H. Prin

Review of the present situation 1/2 Cold mass design: No significant improvement since Alexandre is finishing the work on the twin aperture model Most of the potential issues on the long model or series magnets are expected to be intercepted and treated on the twin aperture model  it is worth to invest time on the short model design and to work hand in hand to apply common solutions. Regular informal meeting with Nicolas and Alexandre. Outer yoke decreased diameter, tie rods diameter, number and location will lead to recalculate the yoke magnetically and mechanically. Alexandre promised to give his best efforts to provide a yoke cross section geometry by the end of next week. Discussions started on the tolerance of the fine blanking laminations. Christian Loffler received metrology files showing large deviations at the level of the “main” contact surfaces. Additional discussions, chain of dimension analysis and a trial assembly might be needed before launching the drawings for fabrication.

Review of the present situation 2/2 Electrical, instrumentation and protection scheme A power scheme is proposed, it was discussed with TE-EPC and TE-MPE. The drawing is ready to be achieved in CDD in order to clarify and stamp the base line. Ludovic Grand-Clément has prepared several proposals concerning the instrumentation and protection. The level of instrumentation and redundancy has implication on the capillary diameter but most of all on the cover flange design: diameter, number of pins… A quick and clear decision must be taken in order star the design of this new cover. Ludovic proposes to take this in charge once the global scheme in fixed.