UNC VMware Environment
UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with reseller, Zunesis Zunesis assessment – Executive summary Technical Roadmap Total Cost of Ownership Return on Investment Bundled cost into other approved projects and utilized IT one-time dollars to fund. Sept. 23, 20082CHECO Presentation
UNC VMware UNC VMware Environment 3 HP C7000 Blade Chassis: 4 HP Virtual Connect Modules for Networking 2 HP Virtual Connect Modules for Fiber Redundant paths for networking and fiber Currently 10 Blades with ESX 3.5 Update 2 Each Blade has: 2 AMD 2.8GHz 16GB Ram 1 NIC for Management 1 NIC for Vmotion HP EVA 4100 Configuration – EVA 4400 for E-Fort: LUNs are kept at 300GB 8 to 10 VMs per LUN Multiple paths Every ESX host has access to every LUN Sept. 23, 20083CHECO Presentation
UNC VMware Current status 34 production servers (24 migrated from Physical to Virtual) 12 test servers Services running in UNC VMware production environment (out of E-Fort) SoftGrid (Application streaming) Campus printing services DHCP ResNet registration process (Cisco Network Registrar) Sept. 23, 2008CHECO Presentation4