MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting.

Slides:



Advertisements
Similar presentations
PO Box Committed Mail All Express Mail and Priority Mail that was received from the plant prior to the PO Box up- time. All First-Class Mail except redistribution.
Advertisements

® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
1 Wednesday, Sept. 17, 2008 It’s Time for Intelligent Mail ® : Overview and Value of Intelligent Mail ®
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
Flats Strategy Managing Cost and Maximizing Efficiencies Joe Schick Vice President of Postal Affairs.
Thursday, October 23, 2014 Area Mailing Industry Focus Group Postal/MTAC Update.
Reduce Postage Costs and Improve Delivery, Combined Mailing Solutions PCC Mailers Forum 2014 September 10 th, 2014 Deborah Damore Fairrington Transportation.
2007 National PCC POWERING UP YOUR BUSINESS with Intelligent Mail®
MTAC WG 114 MTAC Workgroup 114 Establish Service Standards and Measurement Update – May 16, 2007.
MTAC Workgroup 114 Establish Service Standards and Measurement First-Class Mail Measurement July 24, 2007 FCM Subgroup Meeting.
Overview of Scanning Presented by Tom Day Senior VP, Intelligent Mail & Address Quality Friday, February 20, 2009 Webinar #14.
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
® Intelligent Mail Update Measurement & Barcodes Periodicals Subgroup June 25.
1 Pritha Mehra Vice President, Mail Entry and Payment Technologies Mail Entry and Payment Initiatives.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
Understanding Flats Co-Mailing The Benefits, Requirements And Added Values of Utilizing Co-Mailing for Your Standard and Periodical Pieces.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
® Flats Track for Periodicals, Catalogs & Printers David Mastervich Manager, Periodicals, Catalogs & Saturation Rosa Fulton Executive Director, FSS National.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher May 18, 2005 Washington DC.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
MTAC WG 114 MTAC Workgroup 114 DRAFT Recommendations Review and Discussion Full Workgroup Meeting August 29, 2007.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
Intelligent Mail February Vision Provide end-to-end visibility and a seamless process for mail acceptance and delivery, using standardized intelligent.
EInduction Overview 1 eDropship Post-Induction Process November 15, 2010 MTAC Workgroup 138.
USPS Product Information MTAC Jim Cochrane Vice President, Product Information February 17, 2011.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
MTAC Workgroup 102 Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail May 16, 2007.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher Feb 22, 2006 Washington DC.
GLA FOCUS GROUP August 20, MAILING INDUSTRY ECOSYSTEM 2 Mail Owners E-Commerce Logistics Printers & Mailers Software Vendors Equipment Manufacturers.
® Intelligent Mail Measurement Readiness. Letters - Automation Data Capture PointTechnologyTimelineBarrier Start the Clock: Induction Acceptance scans.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
™ September 23, 2015 Future of Mailing An Industry Perspective.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
MTAC Work Group #82 Parcel Delivery Performance Measurement Effectiveness.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
1 Service Performance Measurement System & Intelligent Mail® Barcodes MTAC – January 31, 2008.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Intelligent Mail Measurement Readiness June 13, 2007 Full WG Meeting.
1 Intelligent Mail ® Barcode Implementation Federal Register Notice ©USPS2007.
November, 2006 MTAC Workgroup 99 Streamline Acceptance / Verification of Periodicals and Postage Payment Postage in PostalOne!
1 MTAC Workgroup 117 October 12, 2007 Washington DC.
Streamlining Verification MTAC Workgroup Mission Statement: –Collectively determine how the USPS and the Industry can leverage existing, or guide.
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality.
1 Intelligent Mail Barcodes Mail Preparation MTAC November 8, 2007.
Co-Mail UPDATE Jim Wiseman. Co-Mailing What is it?
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
1 Operations’ Update Fall and Holiday Periods 2002 Mailers Technical Advisory Committee Meeting August 7, 2002.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
1 Service Measurement Status Report MTAC: November 19, 2008.
Military Postal Service Agency FOUO 1 DoD Mail Acceptance & Delivery Solutions.
Simplifying the Commercial Mailing Experience Heather Dyer Program Manager Major Mailer Support HQ.
… January 14 – 16, 2014 Wanda Senne NAAD Meeting, February 28, 2014
Capital metro Area focus group
Standard Mail Volume Profile
Mail Prep & Entry Pre-MTAC Webinar
Southern Area Isaac Cronkhite Mailing Industry Focus Group Meeting
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
Presentation transcript:

MTAC Workgroup 114 Establish Service Standards and Measurement Standard Mail Measurement July 30, 2007 Std Subgroup Meeting

 Letters/Cards: 60.5% (61,950,150,454 pcs) ●Automation = 90.4% (estimate of all letters) ●Manual = 9.6% (estimate)  Flats: 38.9% (39,908,898,270 pcs) ●Automation = 54.4% (estimate of all flats) ●Manual = 45.6%  Parcels: 0.56% (575,581,604 pcs) ●7.6% electronically manifested currently Standard Mail Product Mailstream

Standard Letters (Non-DDU Entry) PostalOne! Implied Delivery Stop the clock Start the clock Manifest Created Mailer Facility USPS Processing Facility Pallets scan compared against the manifest DBCS DPS scans Calculated Service Non-matching Pallets scans – Mailing Excluded Carrier Street Delivery Mail handler scans pallet barcodes Verification

Standard Letters (DDU Entry – arrives as whole tray) PostalOne! Implied Delivery Stop the clock Start the clock Manifest Created Mailer FacilityUSPS DU Facility Pallets scan compared against the manifest Carrier scans tray label when cased or taken to street Calculated Service Non-matching Pallets scans – Mailing Excluded Carrier Street Delivery DU clerk scans pallet barcodes Verification

Standard Flats (Non-DDU Entry) PostalOne! Implied Delivery Stop the clock Start the clock Manifest Created Mailer Facility USPS Processing Facility Pallets scan compared against the manifest Top piece scanning Calculated Service Non-matching Pallets scans – Mailing Excluded Street Delivery Mail handler scans pallet barcodes Use AFSM last en-route scan in conjunction with top piece scanning in each handling unit prior to casing USPS DU * Until FSS Verification

Standard Flats (DDU Entry – bundles at DU) PostalOne! Implied Delivery Stop the clock Start the clock* Manifest Created Mailer FacilityUSPS DU Facility Pallets scan compared against the manifest Carrier scans top of bundle when cased Verification Calculated Service Non-matching Pallets scans – Mailing Excluded Carrier Street Delivery DU clerk scans pallet barcodes * Could be drop shipped at plant, but bundle still sent to DU

Standard Parcels PostalOne! Stop the clock Start the clock Manifest Created Mailer FacilityUSPS DU Facility Pallets scan compared against the manifest Carrier scans parcel barcode Calculated Service Non-matching Pallets scans – Mailing Excluded Carrier Street Delivery Clerk scans pallet barcodes and 5 pieces upon arrival Verification

USPS Proposed Std Measurement Solutions Product Type/Entry % Product Volume Proposed Measurement Solution TimelineBarrier Letters/Cards – Origin-Entered 18.7% Electronic Manifest IM™ barcodes DPS scan 2008 Mandatory in CY2009 Adoption of IM™ and electronic manifesting Letters/Cards – Destination-Entered 41.8% Electronic Manifest IM™ barcodes DPS scan Tray scan for ECR 2008 Mandatory in CY2009 Adoption of IM™ and electronic manifesting Flats – Origin-Entered 5.7% Electronic Manifest IM™ barcodes Top piece in tub scan 2008 Mandatory in CY2009 Use of IM™ and electronic manifesting Flats – Destination-Entered 33.2% Electronic Manifest IM™ barcodes Top piece in tub scan or Bundle piece scan 2008 Mandatory in CY2009 Adoption of IM™ and electronic manifesting Parcels0.6% IM™ package barcode / DELCON Ready Use of DELCON Non-POS sites