The HCAL barrel absorber structure

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Enrique Calvo Alamillo Madrid 1 March Index: 1.Proposal for a DHCAL m3 module. 2.Numerical simulations for a m3 module. 3.Extrapolation of the m3.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
TP4-ENERSOL-TD/PV double function
AHCAL Mechanics status report Karsten Gadow CALICE AHCAL main meeting DESY,
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
Superconducting Large Bore Sextupole for ILC
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
M.Oriunno, SLACALCP, Albuquerque SiD Calorimetry Mechanical Design and Engineering Issues Marco Oriunno, SLAC 2009 Linear Collider Workshop of the.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Aki Maki1 GLD Costing Aki Maki KEK 27/4/2006. Aki Maki2 Cost Summary 27/04/06 GLD COST SUMMARY –Solenoid Magnet**-** B JPY –Cryogenic System***** B JPY.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Problem Statement/Constraints Design Options Design selection Design layout Analysis Fabrication Testing Results Recommendation Concluding Remarks.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Baby-MIND Modules & Services
SuperB IFR mechanics of IFR prototype – by C. Fanin
UNIT-I SLOTTING MACHINES
Hcal Geometry and Assembly
HCAL preliminary analysis and results
Status of design and production of LEP connection cryostat
LumiCal mechanical design, integration with LDC and laser alignment
IHEP group Shashlyk activity towards TDR
SDHCAL Integration Moi j’aime bien SAFARI
SiD Engineering Status Report
HCAL Modules -First Ideas
Challenges for FCC-ee MDI mechanical design
Roof design Bunker Project CDR
Presentation transcript:

The HCAL barrel absorber structure Design Status Report @IPNL 17.09.2009 17.09.2009 K.Gadow - DESY

HCAL barrel absorber structure mechanical design overview (first loop) module sub-module backpack support change of module orientation (22,5° rotation) 17.09.2009 K.Gadow - DESY

HCAL barrel integration in ILD Installation of last HCAL sub module in front of the cryostat Installation with sensitive layers possible Sub module connection by plates from the front and back 17.09.2009 K.Gadow - DESY

ECAL barrel integration in ILD Install ECAL modules The middle modules you can install only with the second AHCAL half barrel in place ECAL cable slot HCAL front end electronics HCAL cables & cooling 17.09.2009 K.Gadow - DESY

real size test setup vertical 2 short length (360 mm) absorber sub-modules mounted to a short length module 360 mm = 1 HBU length delivery tolerances flatness, thickness machining tendering, processing, handling, tolerances, costs sub-module mounting stacking and shape tolerances, module interconnection, stability sensitive layer installation handling, tolerances, vertical and horizontal layer connection, cabling and cooling routing module to module module module connection sub-module sub-module 17.09.2009 K.Gadow - DESY

real size test setup vertical 360 mm sub-module flatness measured of 4 raw plates 3000 mm x 1500 mm Order 2 batch 1 (not roller leveled) order 2 batch 1 water cut to individual plate size flatness measured for each plate before machining sub-module Nr.1 mounting in horizontal position gap size measured in horizontal position (front) sub-module Nr.1 turned vertical gap size checked by cassette prototype 2 positions where the cassette does not fit into the gap gaps must be measured also in depth plate position must be measured flatness measured of 4 raw plates 3000 mm x 1500 mm Order 2 batch 2 (roller leveled) production finished of sub-module Nr.2 mounting started 17.09.2009 K.Gadow - DESY

real size test setup horizontal 4 full length (2160 mm) absorber plates mounted to a fraction of a sub-module 2160 mm = 6 HBU outer position = broadest plates (~ 1300 mm) delivery tolerances flatness, thickness machining tendering, processing, handling, tolerances, costs sub-module mounting stacking and shape tolerances, module interconnection, stability sensitive layer installation handling, tolerances, vertical and horizontal layer connection, cabling and cooling routing 17.09.2009 K.Gadow - DESY

real size test setup horizontal 2160 mm sub-module plates layer 43 to 46 flatness measured from 4 raw plates 2500 mm x 1500 mm Order 1 batch 1 (not roller leveled) order 1 batch 1 water cut to individual size plate flatness measured roller leveling done horizontal mounted 17.09.2009 K.Gadow - DESY

before roller leveling plate measurement measurement of flatness and thickness deviation according EN10029 (steel plates t >=15<25 mm flatness class N, steel group H L(1000): max 10mm L(2000): max 13mm thickness class B min: -0,3 mm max: +1,6 mm measured at the edges only measurement setup 2160 mm sub-module plates before roller leveling max 8 mm deviation 2160 mm sub-module plates after roller leveling max 1 mm deviation 17.09.2009 K.Gadow - DESY

Roller leveling FlatMaster from company arku capacity: t <= 50 mm flatness: +- 1 mm 17.09.2009 K.Gadow - DESY

sensitive layer housing 362 mm x 462 mm standard width housing contains 1 HBU unit for 360 mm sub-module 0.5 mm stainless steel One side border per bottom/cover plates 100 mm bottom plate extension for front end electronic 6 point welded fixation/distance bolds per HBU unit Cover plate and HBU fixed by 6 M2.5x4 screws per HBU unit total thickness 7 mm +-0.1 mm 362 mm x 2260 mm standard width housing contains 6 HBU units for 2160 mm sub-module other parameters see above 1HBU and 2HBU standard width housing prototypes available 17.09.2009 K.Gadow - DESY

Test beam setup V2 2 HCAL vertical test absorber structures with sensitive layers 1 ECAL JRA3 prototype 17.09.2009 K.Gadow - DESY

Summary economic absorber plate production process achievable deeper investigations of deformation and internal forces at the test setups are needed for global understanding of the barrel structure therefore the interface (forces and dimensions) to the ECAL must be defined sensitive layers with front end electronics are needed to continue the housing production design and to start the installation-, cabling-, cooling-tests combined test beam setup must be discussed 17.09.2009 K.Gadow - DESY

Backup sensitive layers 17.09.2009 K.Gadow - DESY

Backup front end electronics 17.09.2009 K.Gadow - DESY

Backup front end electronics 17.09.2009 K.Gadow - DESY

Backup absorber structure data evolution 2x8=16 shape V0 V1 V2 absorption factor 5 5.2 material Fe 1.4401 number of layers 47,6 48 (+ 1 cover layer) absorption layer mm 17,5 18 (17 + 2 x 0.5) detector layer 6,5 6 (3 mm sensitive) layer step distance 24 24,5 26 (18+6+2 air gap) module thickness 1159,9 1194 1266 inner radius 2000 1948 (material saving) outer radius 3342 3378 3394 17.09.2009 K.Gadow - DESY