Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 

Slides:



Advertisements
Similar presentations
By: Edith Leticia Cerda
Advertisements

Testing Relational Database
Project Management Concepts
Standard Work Making the “new way” become the standard way
What is the ADDIE Model? By San Juanita Alanis. The ADDIE model is a systematic instructional design model consisting of five phases: –Analysis –Design.
Planning for Enterprise Systems
Data Collection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
The ADDIE Model By: Elva Juarez LEARNING THEORIES.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Evaluating and Revising the Physical Education Instructional Program.
System Development Life Cycle (SDLC)
7.2 System Development Life Cycle (SDLC)
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Coaching Workshop.
Attention to Detail in Competitive Procurements Prepared By: Steve Kramer and Chris Whyte Procurement All Hands July 2, 2013.
Leaders Manage Meetings
Uncovering the Promise of Faculty Success Online Lawrence C. Ragan, Ph.D. Penn State’s World Campus NERCOMP Boston 2005.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Writing a Research Proposal
Effective Methods for Software and Systems Integration
FORMATIVE EVALUATION Intermediate Injury Prevention Course August 23-26, 2011, Billings, MT.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Chapter 10.
9 Closing the Project Teaching Strategies
Striving for Quality Using continuous improvement strategies to increase program quality, implementation fidelity and durability Steve Goodman Director.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Updated Performance Management for Exempt Staff Fall 2009.
CIS 321—IS Analysis & Design Chapter 4: Analysis— Investigating System Requirements.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
IT Requirements Management Balancing Needs and Expectations.
Generic Approaches to Model Validation Presented at Growth Model User’s Group August 10, 2005 David K. Walters.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 Product Design Finalization; Inspections.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Define Tollgate Checklist
Systems Life Cycle. Know why it is necessary to evaluate a new system Understand the need to evaluate in terms of ease-of- use, appropriateness and efficiency.
Learning to Read Sight words: Learning to read Student behavior: Manage student’s behavior an Important part to student learning.
Systems Analysis and Design in a Changing World, Fourth Edition
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Building Human Resource Management SkillsNational Food Service Management Institute 1 Delegating and Empowering Objectives At the completion of this module,
Healthy Futures Performance Measures Session. Session Overview Combination of presentation and interactive components Time at the end of the session for.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Six Sigma Continuous Improvement Training Introduction to Benchmarking Six Sigma Simplicity.
Why So Much Attention on Rubric Quality? CAEP Standard 5, Component 5.2: The provider’s quality assurance system relies on relevant, verifiable, representative,
Project Management Training
AMEDD Rev. 30 August 2000 Donna O. Farley, Ph.D. Building an Action Plan for Practice Guideline Implementation Training for MTF Action Team Facilitators.
Software Requirements Specification Document (SRS)
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Dances with Faculty: Empowering Success in the Online Environment Lawrence C. Ragan, Ph.D. & Marilynne Stout, Ph.D. Penn State’s World Campus.
What has been accomplished at the end of MSD 1 & 2?
HPHC - PERFORMANCE TESTING Dec 15, 2015 Natarajan Mahalingam.
1 Pengembangan Sistem Informasi Williams, B.K, Stacy C. Sawyer (2007). Using Information Technology: A Practical Introduction to Computers & Communications.
MEASURE Evaluation Data Quality Assurance Workshop Session 3 Introduction to Routine Data Quality Assessment.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
TM 720: Statistical Process Control DMAIC Problem Solving
Feedback/Performance Review and Compensation Process
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design
CLINICAL INFORMATION SYSTEM
Systems Analysis and Design
INFORMATION SYSTEMS PLAN
Presentation transcript:

Making Improvements Improve Kaizen Facilitation

Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run  Plan (4W’s, 1H)  Review Solution Sets  Finalize Design and Implement  Evaluate the Test / Run and Verify  Standardize all Critical Elements 2

Characteristics of a Pilot Test A pilot is a test of a selected solution Has following properties: Performed on a small scale (limited in scope, budget and time) Used to evaluate both the solution and the implementation of the solution – exposes issues Used to make the full-scale implementation more effective Provides data about an expected result 3

Steps for a Pilot Phase 1: Plan Who will be involved What needs to be piloted When and for How long Where will the pilots be conducted How will the pilots be conducted 4

Steps for a Pilot Phase 2: Review Solution Sets Make sure all elements are complete Integrate elements and interfaces Identify possible failure points (Perform S x O x D) Evaluate predicted performance (capability) Tips Establish review objectives in advance Complete all pre-work Keep documentation clear and consistent Distribute documentation prior to meeting Set follow-up meetings to complete action items 5

Steps for a Pilot Outcomes List of key issues raised, identifying who raised them List of proposed actions for modifying the Pilot, including who is responsible for making changes List of modifications / changes needed Schedule of future meetings to complete actions Schedule of future design review meetings 6

Steps for a Pilot Phase 3: Finalize Solution Design and Implement Implement any changes from previous pilot (Phase 2) Move to Pilot Testing / Solution Validation Tips Carefully observe all activities, effects and interactions during the pilot run Actively manage the pilot run Continue pilot long enough to establish reliable baseline performance data Check for ripple effects and unintended consequences 7

Steps for a Pilot Phase 4: Evaluate the Pilot Test / Run and Verify Continue to collect data Use applicable statistical techniques Improve on the Solution / re-design if the Pilot demonstrates any weakness Prepare for Change Celebrate Success! Communicate small victories 8

Full Scale Implementation (last step) Phase 5: Standardize Critical Elements Implementation Plan Who / When / How Documentation What’s the new process ? / new work instructions? Implementation Troubleshooting Who has responsibilities when trouble arises? Training New approaches need to be taught, old ways broken Performance Management Update Position Descriptions, Job Duties, etc. 9

Review Improve is a fun phase! (you have to change something) In general, magic improvement tools do not exist (If they did, you would be in that training class…) Remember: The simpler the new process is to understand, the easier it will be to implement, and the less change management problems you will encounter Once positive change is accomplished, process improvement is proven, and the gains are truly realized, CELEBRATE WITH YOUR TEAM ! 10