3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.

Slides:



Advertisements
Similar presentations
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
Vienna, 8 April th IG Meeting Meeting Guide.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Gas Regional Initiative - Region South-South East 3rd Implementation Group Meeting Towards a Regional Entry-Exit System in the SSE Gas Market. A Preliminary.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Dipl. Ing. Dr. Stephan Ressl Vice Chairman EFET Europe Gas Chair EFET SSE Head of Business Development EconGas GRI SSE Vienna, European Federation.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
1st Stakeholder Group Meeting Region South-South East 27th September 2006, Bratislava.
Gas Regional Initiative South-South East Contribution by TSOs Milano Tasks 5 July 2007, Krakow, Poland.
Gas Regional Initiatives (GRI) – Progress Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
1st RCC Meeting – Region South-South East June 1, 2006, ROME.
GRI SSE – latest developments as seen by a concerned TSO OMV Gas, November 2007.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
2nd IG Meeting – Region South-South East 5th July 2007, Krakow, Poland.
XIV Madrid Forum, May 2008 Regulation 1775/2005: Compliance Monitoring Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
GRI - SSE Workshop on system access Vienna, EFET SSE © Copyright 2006 EFET European Federation of Energy Traders 1.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Athens, Greece, 10 June th SG Meeting Meeting Guide.
Athens, 9 June th RCC Meeting Meeting Guide.
3rd SG Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008 Prague, Czech Republic.
TITRE XXI Madrid Forum 22nd and 23rd March 2012 GRI SSE Progress and Outlook Walter Boltz GRI SSE Co-Chair.
Dipl. Ing. Dr. Stephan Ressl CChair EFET SSE Head of Business Development Econgas SSE SG Prague, 22/01/2008 European Federation of Energy Traders.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
7th RCC Meeting – Region South-South East 5th July 2007, Krakow, Poland.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna.
1 Gas Regional Initiative Regional Energy Market South-South East Hub development as a regional balancing market Italian Balancing Point TF.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Workshop on transportation routes Region South-South East 24th November 2006, Vienna.
Madrid, 3rd October st SG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Region South-South East
New transparency guidelines
Region South-South East
Gas Transmission Europe
2009 TSO Transparency Gas Regional Initiative North-West
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
GRI NW TRANSPARENCY PROJECT
Madrid Forum (16 October 2007)
International Energy Conference Energy Security of South East Europe and the National Security A view on gas market liberation Sofia – June 15th,2018.
Presentation transcript:

3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia

2 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

3 IG meeting agenda – 2 Agenda itemResponsible 14:00 Presentation session III - Regional Cooperation in the Third Package - Regional Entry Exit Tariff System: Update - Hub development PSV and CEGH EC RCC CEGH, PSV, EFET, Eurelectric 15:00Coffee break 15:30AOB 16:00ClosureCo-chairs

4 Action Points 1-3 of the last IG meeting Implementation TFActions Responsible/ Result until Best-practice standardised bulletin board - harmonized content for individual TSO platforms accordnig TAG and OMV best practice TSOs presentation at next IG Summary of planned investments in the region (incl. Storage) - inclusion of information on expansion projects (Transmission&Storage) into the survey RCC presentation at next IG Removing remaining obstacles to implementation of IPA/OBA - further update on implementation :TSOs will focus on concluding IPAs where these are not yet in place; Implementation of an OBA regime is dependent on certain prerequisites and will always be conditional; Shippers must be equally involved in the implementation process by complying with the nomination rules set up by the TSOs - Baumgarten: all involved stakeholders work on a solution within the next 3 months incl. a list of remaining ostacles TSOs, Shippers CEGH presentation at next IG

5 Action Points 4-6 of the last IG meeting Implementation TFActions Responsible/ Result until Best-practice standardised bulletin board - harmonized content accordnig TAG and OMV best practice TSOs presentation at next IG meeting Summary of planned investments in the region (incl. Storage) - inclusion of information on investments into survey RCC presentation at next IG meeting Removing remaining obstacles to implementation of IPA/OBA - further update on implementation and - Baumgarten: all involved stakeholders work on a solution within the next 3 months incl. a list of remaining ostacles CEGH presentation at next IG meeting Best practice provision of OSS service - Transparency platform (GTE pilot project) - TSOs offer OSS service to shippers who request it - best practice OSS (OMV, TSOs presentation at next IG REETS - presentation of benchmarking results - simulation of introduction of REETS RCC presentation at next IG Hub development as regional balancing market - update on implementation of next steps according schedule CEGH/EFET PSV/EFET presentation at next IG

6 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

7 Best-practice standardised bulletin board  What was expected:  Implementation of an online, user-friendly, and secure trading platform.  implementation of an online platform using a harmonised standard (best practice TAG) for transmission capacity on all major transit systems of the region SEE

8 Example to be used for all Austrian transit capacities

TAG Bulletin Board Harmonised Bulletin Board (3) * * Optional information may be in the form of an attachment or as directly published text

10 Action POINT 1 - Best-practice standardised bulletin board  Suggested next steps  Coordinator: TAG  Action Point from last IG meeting:  Implementation of the standard content until next IG meeting  Next steps:  Preparation of guideline for the standard bulletin board by TSOs  RCC to comment on guideline before implementation  Role of RCC to monitor implementation

11 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

12 Summary of planned investments in the region First analysis  Natural gas demand growth: Where data have been submitted, there is an indication of growing natural gas consumption up to 2015  This is the case in eg: Austria, Czech Republic, Italy, Slovenia, Poland  Infrastructure investment  At the TSO level:  Building activity in the region mainly as reinforcement, only little or few true new projects  Examples: TAG compressor stations, reinforcement in Italy  New infrastructure in Czech Republic and Italy  At the SSO level  Both expansion and new projects  Examples: Expansion: 2 projects (A), Virtual storage (CZ), expansion (I, P), new capacity: A, CZ, H, I, P, Rom, Sl (preliminary analysis)

13 Summary of planned investments in the region Implications of findings  Natural gas demand growth seems unquestioned in line with: rising energy demand, economic growth etc.  Expansion/new infrastructure mainly in storage area Fewer infrastructure projects in terms of volume  However: Infrastructure projects might not ‘come online’ until  From a regulatory viewpoint: Issue of capacity shortages unsolved  Clear acknowledgement: SSE region affected by capacity shortages in a heterogeneous manner:  North of the region (Poland, Czech Republic) different from Southern part (Austria, Italy)  Impact of LNG both in the North (Poland) and South (Croatia-Italy-Austria) [potentially]

14 Further analysis:  Pipeline capacity: Is there enough (cf. rout assessment)?  Congestion scenarios 2010, 2015, 2020  Expansion projects till 2020  Storage capacity: A flourishing market-but how much capacity will be available to the market?  Congestion scenarios 2010, 2015, 2020  Expansion projects till 2020  Market needs till 2020  Impact of LNG: What will it be?  Projects that have an influence on the region Summary of planned investments in the region

15 Further data needs and next steps  NRAs to complete natural gas demand forecast (national level)  RCC to ask shippers and traders (EFET and EURELECTRIC) to submit their estimates regarding natural gas demand per country in the region  RCC to ask TSOs and SSOs to cross check the information provided and update it if required Summary of planned investments in the region

16 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

17 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

18 Removing remaining obstacles to implementation of IPA/OBA Interconnection point (GTE map) affected TSOsreported statusactual implementation? Lanzot (54)RTN SPP under negotiation Hora Svate Kateriny (22b)RTN WINGAS in placeOK Waidhaus(24)RTN EON GT, GDF DT under negotiation Oberkappel (25)BOG EON GT, GDF DT under negotiation Velke Kapusany (55)NAFTOGAZ SPP in placeOK Tarvisio (49)TAG SRG under negotiation Murfeld (51)OMV GEOPLIN under negotiationmid 2007? Gorizia (48)GEOPLIN SRG under negotiationmid 2007? Baumgarten (55)SPP OMV, TAG, BOG under negotiationmid 2007?

19 Action Point 3: Removing remaining obstacles to implementation of IPA/OBA Suggested next steps Affected TSOs Action Point of last IG meeting:  CEGH will coordinate a solution for Baumgarten within the next 3 months and present the results at the next meeting Next steps:  CEGH to outline barriers for conclusion of IPA/OBA at Baumgarten Timing:  CEGH and involved TSOs to conclude IPA/OBA until the end of 2007

20 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

21 Best practice provision of OSS service  What was expected:  Practical implementation of a voluntary one-stop-shop (OSS) service based on the recommendations of the OSS study  Information requirements  Capacity information  Cumulative transportation tariff for the requested route  Contract information to be signed with different parties  Service fee for the OSS service

22 Action Point 4: Best practice provision of OSS service Suggested next steps  Coordinator: RWE TGN / OMV Gas  Next steps:  TSOs of the region are invited to participate in the GATRAC platform  TSOs offer OSS service to shippers who request the service according to best practice OSS ( OMV Gas)  Timing: update next meeting  Role of RCC to monitor implementation

23 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

24 IG meeting agenda – 1 Agenda itemResponsible 11.00OpeningCo-chairs 11:15 Presentation session I - Best practice standardised bulletin board - Best practice: TAG - Summary of planned investments in the region TSO TAG RCC 12:00 Presentation session II - Implementation of EASEE gas CBPs in the region - Removing remaining obstacles to implementation of IA/OBA - IPA/OBA in practice: Baumgarten - Best practice provision of OSS service - OSS in practice: GATRAC - Current status of planning: Transparency platform - Proposal of a Regional ISO Model as a way forward? EASEE gas TSOs and shippers CEGH RWE TGN TSOs EFET

25 IG meeting agenda – 2 Agenda itemResponsible 14:00 Presentation session III - Regional Cooperation in the Third Package - Regional Entry Exit Tariff System: Update - Hub development PSV and CEGH EC RCC CEGH, PSV, EFET, Eurelectric 15:00Coffee break 15:30AOB 16:00ClosureCo-chairs

26 IG meeting agenda – 2 Agenda itemResponsible 14:00 Presentation session III - Regional Cooperation in the Third Package - Regional Entry Exit Tariff System: Update - Hub development PSV and CEGH EC RCC CEGH, PSV, EFET, Eurelectric 15:00Coffee break 15:30AOB 16:00ClosureCo-chairs

27 IG meeting agenda – 2 Agenda itemResponsible 14:00 Presentation session III - Regional Cooperation in the Third Package - Regional Entry Exit Tariff System: Update - Hub development PSV and CEGH EC RCC CEGH, PSV, EFET, Eurelectric 15:00Coffee break 15:30AOB 16:00ClosureCo-chairs

28 Action Point 6: Hub development as regional balancing market (I) Suggested next steps  Lead: PSV/EFET and CEGH/EFET  Next steps:  Separate workstreams and update on implementation of next steps according schedule  Timing:

29 Action Points 1-3 Implementation TFActions Responsible/ Result until Best-practice standardised bulletin board TAG GmbH to circulate document outlining the features of the standardised bulletin board and the timetable for implementation by all TSOs of the region to stakeholders for comments 15 December 2007 Summary of planned investments in the region (incl. Storage) NRAs to complete natural gas demand forecast (national level) RCC to ask shippers and traders (EFET and EURELECTRIC) to submit their estimates regarding natural gas demand and storage need per country in the region RCC to ask TSOs and SSOs to cross check the information provided and update it if required 31 December 2007 Removing remaining obstacles to implementation of IPA/OBA Murfeld and Gorizia: conclusion of IPA/OBA Baumgarten: CEGH to coordinate with TSOs to conclude IPA/OBA 31 December 2007

30 Action Points 4-6 Implementation TFActions Responsible/ Result until Best practice provision of OSS service Regional ISO TSOs of the region are invited to join the GATRAC platform EFET to circulate their paper on a Regional ISO for comments TSOs of the region/ November 2007 REETS AEEG to circulate REETS simulation study to stakeholders for comments AEEG/ 31 December 2007 Hub development as regional balancing market PSV: implementation of independent Market Operator for the balancing point, RCC to monitor implementation according to action plan CEGH: implementation of back- up/back-down services, RCC to monitor implementation according to action plan IBF TF/ March 2008 CEGH and EFET/ March 2008

31 IG meeting agenda – 2 Agenda itemResponsible 14:00 Presentation session III - Regional Cooperation in the Third Package - Regional Entry Exit Tariff System: Update - Hub development PSV and CEGH EC RCC CEGH, PSV, EFET, Eurelectric 15:00Coffee break 15:30AOB 16:00ClosureCo-chairs

32 Any other business-AOB Proposed date of next meeting  Suggestion: Next meeting (SG meeting) end of January 2008  Key: Progress report and participation of stakeholders  Regulators only to facilitate the process Context of regional activities  Next Madrid Forum on 16th/17th October 2007  ERGEG to report on progress  Update on issues regarding transparency (Outcome of recent survey)