GTPE 04/06/15 L. Scibile 04/06/2015 1 EDMS: 1515929.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

VISITOR SAFETY AT THE LAWRENCE BERKELEY NATIONAL LABORATORY.
Sample questions from the Rules of the Road units of the Driving Theory syllabus. ESOL for Driving.
Luas Cross City Main Infrastructure Works April 2015.
Copyright 2004 Foreman Architects Engineers School Security From Common Sense to High Tech.
Chinese International School Laboratory Refurbishment A case Study of laboratory design.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
Work Zone Safety It Starts With YOU!!. 2 BOOK 7 What is NEW??? IMSA TECHNICAL EXPO October, 2014 Dave Edwards.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
2015 Traffic Signals 101 Topic 12 Special Provisions.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
71 BRR Project Chennai Street Design. What makes a complete street? A street that provides separate spaces for walking and cycling, and, dedicated lanes.
Service Management Status 108 th ACCU Meeting 09 June 2015.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
BARTEX Parking Control System Automated Parking Management.
CERN campus: mapping of the building versus energy consumption and an example of design and construction of a green building. Luigi Scibile CERN, General.
24 LOGISTIC CENTER. 24 LOGISTIC CENTER IS: New generation of logistical operator, providing integrated 3PL- services for planning and controlling enterprise.
Community Development Department Construction Phase.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY PARKING IN EUROPE INTERREG IIIC THE “UNIQUE” PARKING PHENOMENON OF ATHENS. NEW PARKING POLICY PROSPECTS. John M. Frantzeskakis Professor Emeritus,
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
COMPLEMENTARY MEASURES TO SUPPORT CYCLING Karl Reiter FGM- AMOR.
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
VISITOR SAFETY AT THE LAWRENCE BERKELEY NATIONAL LABORATORY.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Priority Development Areas Ursula Luna-Reynosa, Economic Development Director David Kleinschmidt, Public Works Director November 3, 2011.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
MUNICIPALITY OF ATHENS CONTROLLED ON-STREET PARKING Chronis Akritidis Civil & Transportation Engineer Deputy Mayor of Athens John Frantzeskakis Professor.
Service Management Status 104 th ACCU Meeting 03 June 2014.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
CTC Planned Development and Development Agreement Modification January 12, 2016 Planning Commission Workshop Greg Turner, Land Use Manager.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
Maintenance and Temporary Traffic Control
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
West Cambridge Data Centre Ian Tasker Information Services.
Osher Lifelong Learning Institute Relocation to UC’s VICTORY PARKWAY CAMPUS IS THIS CHANGE FOR THE BETTER? OLLI RELOCATION—KEY POINTS - Classes will be.
An overview of School health and safety AT THE DESIGN STAGE
White Pigeon Community Schools
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
ELCITA UPDATE JULY 2017.
IS THIS CHANGE FOR THE BETTER?
CERN Beamline for Schools 2017
Background B513 built in early 1970’s for mainframe era.
SMB Service Status 112th ACCU Meeting
Special LS1 day on 12 June 2012, EDMS:
Health & Safety Team | Edinburgh Napier University
Udaipur Smart City SUMMARY OF PROGRESS
Health & Safety Team | Edinburgh Napier University
BSOE SPACE/FACILITIES COMMITTEE Agenda – July 23, 2009
Carleton College Facilities Management
An assembly about safe behaviour near roads.
Radisson Blu, London Stansted
Presentation transcript:

GTPE 04/06/15 L. Scibile 04/06/ EDMS:

Items IPP Status Parking 4-5 NEWS – Ex BP station NEWS - Mobility Centre NEWS – On-going projects 04/06/ EDMS:

IPP Process status 04/06/ EDMS:

IPP Status: Approved for study The two projects clearly identified as having safety implications: – IPP : Relocation of the coating laboratory to a more adequate working area on the first floor of Bldg 101. (X) – IPP : Replacement of Bldg 195 and refurbishment work on associated buildings (196 and 232) and infrastructure Two projects with consolidation implications: – IPP : RAMSES Office, storage and laboratory space – IPP : Refurbishment of Bldg 156 And seven new projects: – IPP : Second network hub (X) – IPP : Extension of radioactive equipment storage building capacity (X) – IPP : Modification of Bldg 238 and tank for gensets (X) – IPP : New building for metallurgy laboratory. – IPP : Conversion and refurbishment of chemical laboratories in Bldg 3 for the safe handling of nano-materials. – IPP : ALICE R&D O2 lab. (X) – IPP : ALICE visitor space in Point 2. 04/06/2015EDMS:

IPP Status: Not approved Projects not considered for this round of IPP: – IPP Storage building for rewinding line, cables and connectors – IPP Construction of a New Assembly Hall in Prévessin near Building 867 – IPP New Training Centre Prevessin – IPP CMS 3585 Annexe (Workshops and Tooling storage) – IPP Building 287 Extension – IPP Building Annex 04/06/2015EDMS:

Parking /06/ EDMS:

 PARKING (Consolidation program)  Safety  For Pedestrians and cyclists  For kids from the kindergarten  For car traffic on and around the parking (entrance, exit, junction)  Continuous sidewalk from Entrance A & Building 33 to main building  No reduction of number of parking spots  Dedicated parking spots for kindergarten drop-off (3m wide instead of 2.5)  Dedicated car sharing parking spots  Disabled parking spots  Emergency services road marking  Energy saving and high performing led lighting  ENTRANCE A (security & mobility program)  Access control for cars, pedestrians and cyclists  Car plate reader for in- and out-going cars  Fully automated gates (car, bike, pedestrians) Program 04/06/2015EDMS:

Existing parking layout 04/06/2015EDMS:

New parking layout 04/06/2015EDMS:

 PARKING  234 parking spots  m 2 of parking surface  500+ ml of sidewalk  9 high-rise lighting masts on car park  10 low-rise lighting masts along sidewalk  ENTRANCE A  2 automated turnstiles for bikes and pedestrians  2 automated gates and barriers for cars  2 car plate readers  Surveillance cameras  1 high-rise lighting masts Technical specification 04/06/2015EDMS:

Phased execution Phase 1 Phase 2 Phase 1’or 2’ 04/06/2015EDMS:

Planning  Option 1 – Requiring early supply of automated equipment  Start of work Phase 1 & 1’: 6-07  End of work Phase 1:  Start of work Phase 2:  End of work Phase 1’:  End of work Phase 2:  Option 2 – If early supply of automated equipment not possible  Start of work Phase 1: 6-07  End of work Phase 1:  Start of work Phase 2 & 2’:  End of work Phase 2’:  End of work Phase 2: /06/2015EDMS:

Ex BP station 04/06/ EDMS:

Ex BP station Agreement to use the space as is (not blacktop) 04/06/2015EDMS:

Mobility Centre 04/06/ EDMS:

CERN Mobility Centre Pole échange multimodale Trams, navettes, voitures, vélos Réception voiture location Stations à vélo 04/06/2015EDMS:

Overview 04/06/2015EDMS:

On-going projects 04/06/ EDMS:

On-going projects PolimerLab – CE tenders out, HVAC and EL should be published this week. Bat 311 – CE detailed studies on-going for call for tender as planned. Extension ENH1 - CENF extension – Works on-going as planned. Globe renovation – Globe closed and preparatory works started. Bat 107 – Building closed, final resolutions with previous contractor to be presented at next FC. Being passed new contracts for engineering support. Bat LIU Injectors – CE construction contract passed and works starting next week. Bat – CE tenders out. 04/06/2015EDMS: