Advanced BIM and Lean Jaime Johnston, Bryden Wood Associates Brian Swain, Brian Swain Ltd.

Slides:



Advertisements
Similar presentations
Christine Pasquire, Nick Blismas, Alistair Gibb
Advertisements

First create and sign up for a blue host account Through the help of Blue Host create a WordPress website for the business After you created WordPress.
Page 1 Capability Business Benefit Business Risk KEYBA Capabilities: Benefits V Risks Facilitation of Decision making Getting the right people together.
© 2013 Rainmaker Solutions Limited. All rights reserved. G-Cloud Services – Lot 4 Cloud Consultancy.
AMI Home Area Network Update SAG Meeting March 18, 2014.
Applying Lean to EHS. Key Points 5 Principles of Lean Application within EHS Real World Value Results.
© Radiant Innovation Who Am I ? UK – based management consultancy – 1 person at present, but with growth plans Focused on change and innovation.
Innovation in Supply Chain Management
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
 Backdrop – JIT foundation  Understanding your Business … KPI’s  Value Streams … ‘True North’  Lean Partnerships to drive cost improvement  Design.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Overview of Lean Six Sigma
Lean Supply Chain Action Learning Program September 2007.
Lean Organizational Structure Lean Leadership Series.
How to Effectively Implement Set-up Reduction in Any Organization.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Lean Six Sigma Kick-Off Meeting Template
Construction Category Management Planning Version 1.1 (May 2015)
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
AgileCamp Presents: Agile 101. Good luck in your presentation! This slide deck has been shared by AgileCamp Kit under the Creative Commons Attribution.
IS&T Relationship Management Program IT Partners Presentation April 19, 2005.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapter 5: Process Improvement: Reducing Waste Through Lean.
Project Team 191: Lean Principles in Construction.
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Henry Krumb Lecturer, SME- DC Role of the Project Management Professional April 8, 2014 THE ROLE OF THE PROJECT MANAGEMENT PROFESSIONAL AT PROJECT START-UP.
CSZ QUANTUM LEAP – Vic Falls Peter Doona Finance Director BAT Zimbabwe.
1 The Application of Industrial Production Techniques to Health Care Delivery Summary of notes Pittsburgh Regional Healthcare Initiative: Perfecting Patient.
Assessment of Portal Options Presented to: Technology Committee UMS Board of Trustees May 18, 2010.
Business Improvement Techniques. What’s it all about then?
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Name of Project Agency(ies) involved
1 Managing Risk in a Lean Environment Ray Sloane Mace Risk Management.
Exploration of parallels in Lean and VM methodology in construction Steve Parker, Institute of Value Management.
Gulay Litchfield For CQI-TECH PLC
Hollings Manufacturing Extension Partnership MEP Overview 2015.
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
Introduction to Factory Thinking Andy Fielding, Costain.
Lean Manufacturing. Why do this? Lets look at jobs on Monster.com that refer to Lean - ployer/?WT_srch=1&s_kwcid=job%20ope.
Productive General Practice First support day: Getting started.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Information Sharing for Integrated Care A 5 Step Blueprint.
All roads lead to…..Warwickshire’s extra care housing The challenge of developing extra care at a large scale Tim Willis, Extra Care Housing Programme.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
Context and Problem Effects of Changes Strategy for Change Aim: To reduce the length of handover by standardising the quality of information transmitted.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Commission of Inquiry into achieving best value in the procurement of construction. Andrew Smith Chair of NIEP Board National Improvement and Efficiency.
ISA 201 Intermediate Information Systems Acquisition
What is Lean Construction?
Software Risk Management
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Wendy Birkinshaw, A/Director, Service Transformation
ISA 201 Intermediate Information Systems Acquisition
Information Sharing for Integrated care A 5 Step Blueprint
SUPPLY MODELS JUST-IN-TIME
X4MIS Change Management Principles
Project Management Essentials Connecting PI to PM
An introduction to lean in construction Victoria Shaw Stephen Greenhalgh Both.
© LEAN CONSTRUCTION INSTITUTE
Light Gauge Steel Frame
IS&T Project Reviews September 9, 2004.
Michelle Papayannakos
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Presentation transcript:

Advanced BIM and Lean Jaime Johnston, Bryden Wood Associates Brian Swain, Brian Swain Ltd

Lean Improvement Programme Birmingham Gateway Project

Lean Programme Objectives Focus on the delivery of Client requirements Stabilise & improve the programme Improve quality, delivery, cost and H&S performance Work collaboratively with all teams across the Critical Paths to promote teamwork, sustainable & practical solutions Start Early

The Five Lean Principles Specify what creates ‘value’ from the client’s perspective Identify all steps across the whole value stream for every product family Make those actions that create value flow Only make what is pulled by the customer Strive for perfection by continually removing successive layers of waste.

Client Agreed Value Definitions A lean principle that drives the definition of: Customer values Within the Project Constraints And therefore drives the clarity of Goal Deployment Delivery Early High Quality Whole Life Cost Drive Value YET Achieve Cost

Collaborative Programme Compression Objective: Stabilise and Improve the Programme Delivery to Client’s Needs

Lean Tools and Techniques Stability & Improve Whole programme focus Improvements at all levels Client and Contractor involvement

Maximising the Benefits Early engagement & start up = maximum benefits = Stability and Improve Whole programme analysis and improvements - Design - Handover

Critical Path Focus

Gateway Atrium Demolition Objective - secure & achieve 6 month programme reduced from 12 months Achieved 5 months for bulk of demolition - with slow start, overlap of areas Associate trades interfaced - floating decks, Rail Additional works integrated - tension, edge works

Lean Activities

Visual Management Deployment Design Hub – Collaborative clusters Project Completion Hub - focus Gold Command Room - Hotspots/escalation Project Completion - detailed planning Supporting schedule of meetings, actions reviews, escalation and performance

7 Wastes - Improved Performance Overproduction Inventory Transportation Process Idle Time Operator Motion Bad Quality

Dispersal Tunnel Scope

Where does it fit? Is it Critical?

Potential Options Build a new Tunnel Expensive, safe, impacts other Construction activities Move it in sections Slow, disruptive, repetitive risk, costly Move swiftly Cost effective, riskier, less disruptive CLIENT MOST SATISFIED

Steps to identify improvement

Preparatory Works Cabling replaced Plug and play connections Back up distribution boards installed Unit movement jacks and wheels Trial runs and test

Lean Deployment Benefits Specific Highlights:- Demolition Process Improvement 12months to 6 months Dispersal Tunnel 3 weeks to 52 hours Asbestos process improvement turnaround 8.3 days down to 3 days Vertical Access Programmes saved 2 weeks / area John Lewis Partnership and Facades XCSC handover and Façade productivity Duty Managers Process 50% reduction in leadtime Quantifiable benefits = £28m Mitigated Losses Numerous associated benefits – Facades, Rail platforms, Vertical Access Collaborative Planning deployed, Logistics planning and work studies

Associated Benefits General Overview Embedded Collaborative Planning as the norm Data and visual process level driven Embedded Visual Management in various formats Focus on Programme Compression, not just acceleration Senior Team Facilitation Impartial Process Driven Completion process support