Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin.

Slides:



Advertisements
Similar presentations
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Design to Dozer August, 2010.
Advertisements

Roadway Intersection Design In GEOPAK Site
best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
Test Automation Success: Choosing the Right People & Process
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development ACEC/WisDOT Transportation Improvement Conference.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ODOTcadd Standards VBA Application Updates Eric Thomas, CADD Consultant.
Implementing a Model Based Approach to Design and Construction at Wisconsin DOT Eric Arneson, P.E Methods Development, WisDOT
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Moving to Civil V8i Select Series 3 Robert Garrett.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Presented By: Chuck Lawson, PE Paving the Way for Roadway Designer in GEOPAK V8 i (SELECTseries 1)
Trimble  Quantm  Haul Road Optimization Presenters Name.
Using OpenRoads Effectively
Fundamentals of Information Systems, Second Edition
Estimating With Electronic Documents Kevin R. Miller, Ph.D. Brigham Young University
Working with 3D Models in Design & Construction Panel Discussion 1.
Enterprise Architecture
Release & Deployment ITIL Version 3
The BIM Project Execution Planning Procedure
LandXML.org 2006 Nathan Crews Principal Schema Architect, LandXML.org Software Researcher, Autodesk.
Financial Area Representative Meeting FAR UTShare PeopleSoft Update October 16,
® IBM Software Group © 2006 IBM Corporation Writing Good Use Cases Module 4: Detailing a Use Case.
Construction Automation A Six Year Plan in Development Ron Singh Chief of Surveys Geometronics Manager Roadway Conference 13 April, 2010.
Civil Platform Update Derricke Gray, GEOPAK Product Manager.
Transaction Processing Systems and System Development Life Cycle
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
Twelfth Lecture Hour 10:30 – 11:20 am, Saturday, September 15 Software Management Disciplines Project Organization and Responsibilities (from Part III,
PowerPoint 2003 – Level 1 Computer Concepts Cathy Horwitz April 25, 2011.
Eight Steps to Improving Career Services in Schools, Colleges, and Agencies James P. Sampson, Jr. National Career Development Association Global Conference.
Estimating With Electronic Documents Kevin R. Miller, Ph.D. Brigham Young University
Web-Based Instruction Overview Nada Dabbagh George Mason University.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Jay Vose, P.E. Civil Platform Update ATHENS and Beyond.
Part II – Applications 3D Engineered Models for Construction Part II - Applications September
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
WisDOT Implementation of 3D Technology & Methods in Design & Construction 2009 Contractor/Engineer Conference WTBA & WisDOT January Jerry H. Zogg,
ConSysTec 3 rd Israel ITS AnnualMeeting Israel ITS Architecture Development Rob Jaffe, Ph.D. President, ConSysTec Shenorock, NY USA.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
© 2009 Bentley Systems, Incorporated Michael Cavanaugh Product Manager, Road and Site InRoads V8i SELECTseries 1.
Bentley OnSite: Overview Construction / Engineering / Inspection Solutions from Bentley Civil.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
Introduction to Interactive Media Interactive Media Tools: Authoring Applications.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Software Requirements Specification Document (SRS)
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
How are Highway Designs Actually Represented in Surface Models for Automated Machine Guidance and How Should We Control Them? Alan Vonderohe Construction.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Join us on Twitter: #AU2013 CI1754-R BIM for Infrastructure in Concrete Terms Francesca Maier, PE Aaron KrovanceKevin Gilson Parsons BrinckerhoffHDR, Inc.Parsons.
What is 3DM (DTM)? – Collection of intelligent computer objects that represent an original surface – The objects know their position in space and in what.
Education Management Information System Redesign for Longitudinal Data (EMIS_R) Presented by: Office of Information Policy and Management November 18,
SYSE 802 John D. McGregor Module 0 Session 3 Systems Engineering QuickView.
Chapter 1 Introduction to AutoCAD Civil 3D 2009 Learning Objectives: Understand basic features of AutoCAD Civil 3D Start AutoCAD Civil 3D Understand.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
BIM EXECUTION PLANNING PROCESS
Estimating With Electronic Documents Kevin R. Miller, Ph. D
BIM EXECUTION PLANNING PROCESS
FUTURE CAPACITY BUILDING NEEDS dISCUSSION
3d Model integration from design to inspection and construction
Model-Based Design and Construction: the UDOT Experience
2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.
Presentation transcript:

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Implementing a Model Based Approach to Design at Wisconsin DOT August 21, 2012 WisDOT Methods Development

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Topics WisDOT Civil 3D implementation status WisDOT model oriented design workflow Implementing 3D Surface Model Deliverable Future of Roadway Models at Wisconsin DOT Implementing Civil 3D Specific Delivery Requirements

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 WisDOT Model Concept Definitions 3D Surface Model Produced for projects with Grading work Includes surfaces for AMG operations of Grading, Base Course, and Paving Initial model deliverable requirement will be 3D Surface Models Roadway Model Evolution of model concept to include information for increased utility in design and construction processes, and ultimately expanded to downstream roadway lifecycle processes

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 WisDOT Civil 3D Implementation Status Deployed Civil 3D 2010 in January of WisDOT staff have enrolled in Civil 3D New User Training ( ) 8 Civil 3D design projects have submitted PSE WisDOT’s First All-Civil 3D developed plan set delivered Nov 1, 2011

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 WisDOT C3D Implementation – Upcoming Events CAiCE Retirement by July 2013 MicroStation Retirement by July 2014 Next implementation objective: full utilization of Civil 3D functionality in our workflows Plans Production workflow training Survey Data workflow training Quantity Takeoff functionality Drainage Analysis

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 WisDOT’s Current AMG & Model Practices Develop & Pilot AMG Spec for Grading Advisory Group, Stakeholder Workshops, Two Construction Seasons with Five Pilots 3D Model Data Development and Exchange a Major Issue AMG for Grading is Contractor Option Statewide Contractors Producing 3D Models

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Model-Based Design Part of WisDOT Implementation of 3D Technologies in Design & Construction Plan with Five Active Initiatives: Statewide Real-Time Kinematic GPS Network. DTM Data Collection. 3D Design. Automated Machine Guidance. Field Technology and Inspection.

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Requirements of the Design Workflow Civil 3D Design Workflow goal to develop construction ready surface models during the design process Must produce surface models with sufficient detail to support AMG operations 3D Surface Model output must be synchronized with plan sheets

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Model Sharing Pilots 2011 – We’ll discuss in detail later today Determine Benefits of Providing 3D Roadway Models at Pre-Bid. Determine Utility of 3D Models for Bid Preparation. Establish Requirements for “Construction –Ready” 3D Models Flowing from Design Process. Includes Model Content and Format. Field Test “Construction Readiness” of 3D Models. Identify and Implement any Changes to Design Workflows Necessary for Achievement of “Construction Readiness” in 3D Models.

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Model Sharing Pilots Results – We’ll discuss in detail later today Surface Model was used in bid preparation activity Plan activities to greater level of detail, reducing uncertainties Identify potential sites for borrow/waste, and communicate with property owners Surface models were construction ready – validated design workflow Model content changes Add longitudinal breaklines as visual aids for operators Add surfaces for all subbase layers Staged models not needed for AMG operations

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Requirement WisDOT will implement a 3D Surface Model Delivery Requirement on projects starting after July Model content requirements and other details will be released Q4 of 2012.

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Content Concepts

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Content Concepts

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Content Concepts

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Content Concepts

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, D Surface Model Content Concepts Surfaces Exist Top Finished Base Course Subbases Datum Pavement Surface model data density will be design speed dependent Surface models must be synchronized with plan sheets Additional content Longitudinal breaklines Horizontal alignments Vertical alignments Superelevation transition information Fully staged model requirement will be decided on project-by- project basis

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Roadway Model Evolution Ability to increase information included with the 3D Model will grow Methods of accessing information will become easier WisDOT looking to expand use of Roadway Models in: o Integration with GIS o Operations o Design o Construction o Maintenance o Planning

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 WisDOT Goal for Roadway Models As potential for Roadway Model uses expand, WisDOT will maximize utilization WisDOT will need access to full function of design data to realize full potential of Roadway Models WisDOT will ultimately require delivery of design software files pertinent to the final roadway design as delivered in PS&E

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Design Data Utilization Requirements Data import into Civil 3D Entire object family needed (Survey Data, Points, Alignments, Profiles, Surfaces, Pipes and Pipe Networks, Typical Sections, Sheets For Plans, Roadway Models, etc) Direct Import process, will not require user manipulation

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Design Data Utilization Requirements Objects, when imported into Civil 3D, will contain all the intelligence and functionality of their Civil 3D counterparts, and will be linked to their graphic representation Objects will retain their ability to react to each other like native Civil 3D data does react to changing terrain conditions adhere to WisDOT design standards

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Design Data Utilization Requirements Objects will correctly interact with Civil 3D design control tools Design results in Civil 3D will be identical to design results delivered in the data’s native software

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 How Can Our Roadway Model Goals Be Met? To answer this question WisDOT has: Learned more about how model design software functions & compatibility between software Monitored “TransXML” Development Monitored collaborative efforts between Bentley and Autodesk

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Roadway Model Design Software Evolution of roadway design software: Highly individualized Each has unique approach to doing the design Each uses proprietary formats that limits the ability to share design intelligence Functionality to modify the design is: Limited in non-native software Unlikely to significantly improve

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Performance Base Alternatives considered, but ultimately abandoned Civil 3D Specific delivery requirements will go into effect for projects solicited after July 2014 Civil 3D Specific Design Delivery Requirements

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Civil 3D Implementation = New Design workflows 3D Surface Model Delivery Requirements Evolution of Roadway Model Civil 3D Specific Project Data Delivery Requirements Model Based Approach to Roadway Design

Methods Development – Support, Develop, InnovateFHWA – 3D Design at WisDOT, August 21, 2012 Questions??? Wisconsin Dept of Transportation Model Based Design as WisDOT