COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* *

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
1 Chamonix 2010 Summary of Session 7: Future Upgrade Scenarios for the Injector Complex P. Collier /BE (V. Mertens /TE) Chamonix Summary, 5th Feb 2010.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
F Project X Overview Dave McGinnis October 12, 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
Linac4 Status 1 M. Vretenar sLHC public event
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
LIU-PS Beam Dynamics Working Group Introduction and objectives
contribution to the round table discussion
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
CLIC Klystron-based Design
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Michael Benedikt AB/OP
Superbeams with SPL at CERN
IS IT POSSIBLE TO INCREASE THE p INTENSITY FOR CNGS BY A FACTOR 2 OR 3
W. T. Weng Brookhaven National Laboratory
Progress towards Pulsed Multi-MW CERN Proton Drivers
Present and Future test facilities for High-intensity Targetry CERN
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Joint session – Beta-beams
The SPL-based Proton Driver at CERN
Summary of session 9: "LHC Injectors Upgrade"
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* * Introduction Users’ requests Main upgrades considered Analysis Recommendations - short term - medium term - long term Summary

COMPASS meeting 2/07/2004 R.G. for the HIP WG 2 Introduction: HIP WG Members M. BenediktPSBSecretary K. CornelisSPS R. GarobyChairman E. MetralPS F. RuggieroLHC M. VretenarLinac(s)

COMPASS meeting 2/07/2004 R.G. for the HIP WG 3 Introduction: Mandate Define a list of specifications for beam performance based on perceived future physics needs. Investigate possible changes to the CERN complex of proton accelerators. Publish a summary of various alternatives and compare them in terms of performance, flexibility and approximate cost. The associated requirements in technical competence should be underlined. A preferred scheme should be indicated with the possible option of a staged realisation. Present the recommendations for approval by the A&B management by the end of Partly done CERN-AB OP/RF

COMPASS meeting 2/07/2004 R.G. for the HIP WG 4 Introduction: Work history Minutes and presentations available at Builds upon previous work:  CERN/PS (AE), CERN/SL , Increasing the Proton Intensity of PS and SPS, R. Cappi (editor)  LHC Project Report 626, LHC Luminosity and Energy Upgrade: a Feasibility Study, F. Ruggiero (ed.) 24 meetings since January 9, 2003 Intermediate reports at ATC (06/03), ISOLDE upgrade SG (09/03) and CNGS TWG (01/04) Final report published ( May 2004, CERN-AB OP/RF))

COMPASS meeting 2/07/2004 R.G. for the HIP WG 5 Introduction: Subjects & speakers SPEAKERSUSERS’ NEEDSACCELERATORS’ ISSUES S. Baird, M. BenediktProton beam availability T. NilssonISOLDE upgrade and future plans M. Benedikt, G. MetralPotential of shorter basic period K. ElsenerCNGS needs and potential M. GiovannozziPS new multi-turn ejection M. LamontSPS ppm and fast supercycle changes M. VretenarPossible upgrades of linacs A. Mueller (CNRS)EURISOL A. Blondel (Geneve)Future neutrino beams H. SchonauerRCS option F. RuggieroPotential LHC upgrades D. ManglunkiCT status and possible improvement E. ShaposhnikovaHigh intensity in SPS: longitudinal issues K. CornelisHigh intensity in SPS: transverse issues J. VirdeeFuture LHC upgrades

COMPASS meeting 2/07/2004 R.G. for the HIP WG 6 The present priorities of CERN have been used, and only the users communities already working on the site have been considered. Namely, the needs of LHC, neutrino and radio-active ion beam physics have been taken into account. For the other present users (AD, PS East area, nTOF), the assumption has been that their requirements do not significantly influence the choice, and that every scenario envisaged would be compatible. In terms of schedule and resources, the requested beams fall into 3 main categories:  the short term, “low” (ideally zero) cost demands, which match the present commitments of CERN and belong to the approved physics programme,  the medium term, “medium” cost requests, which correspond to modest and progressive increases of performance for the present experiments,  the long term, “high” cost wishes, which are linked to major equipment upgrades and to new experiments suggested for integration inside the future physics programme of CERN. Users’ requests (1)

COMPASS meeting 2/07/2004 R.G. for the HIP WG 7 Users’ requests (2) USER CERN COMMITMENT* USERS’ WISHES Short term Medium term [ ~ asap !] Long term [beyond 2014] LHCPlanned beamsUltimate luminosityLuminosity upgrades FT (COMPASS) 4.3  10 5 spills/y ?7.2  10 5 spills/y CNGS 4.5  p/yearUpgrade ~  2 ISOLDE 1.92  A **Upgrade ~  5 Future  beams > 2 GeV / 4 MW EURISOL1-2 GeV / 5 MW * Reference value for analysis ** 1350 pulses/h – 3.2  ppp

COMPASS meeting 2/07/2004 R.G. for the HIP WG 8 Main upgrades considered DescriptionBeneficiary “Loss-less” PS multi-turn ejectionCNGS Double PSB batch for CNGSCNGS Reduced basic period (0.9 & 0.6 s)ISOLDE Energy upgrade of linac 2ISOLDE, CNGS Linac 4 (=> single PSB batch for LHC)LHC, ISOLDE Low energy RCS (PSB replacement) LHC, SPL LHC, EURISOL, 30 GeV RCS LHC, New 30 GeV PS (~ “PS XXI”)LHC 1 TeV LHC injector (“Super-SPS”)LHC

COMPASS meeting 2/07/2004 R.G. for the HIP WG 9 Analysis*: Flux Basic Assumptions 2007 [2010]: (no shortage of protons in 2006 because LHC is not running) Accelerators time schedule  PS operating time/year:5400 h(without setting-up)  SPS/LHC operating time:4700 h(without setting-up)  SPS in LHC filling mode:15 %[5 %]of the time  SPS in LHC pilot mode:35 % [10 %]of the time Availability  PS & PSB:90 %  SPS for CNGS:80 % Beam intensities  SPS intensity for CNGS:4.4  ppp 7  ppp  PS intensity for CNGS:3  ppp 4  ppp * by M. Benedikt & S. Baird

COMPASS meeting 2/07/2004 R.G. for the HIP WG 10 Analysis: SPS supercycles “Best” compromise based on basic operational requirements* 1. LHC filling supercycle 1 LHC filling (flat porch for 4 PS injections) Nominal length  21.6 s 2. LHC pilot supercycle 1 LHC pilot + 2 CNGS Nominal length: 22.8 s 3. CNGS & FT supercycle 3 CNGS + 1 FT + 1 MD Nominal length: 34.8 s * Assumes capability of quickly changing the SPS supercycle and the presence of a solid-state switch for powering magnets in TT41

COMPASS meeting 2/07/2004 R.G. for the HIP WG 11 Standard operation CNGS double batch Linac 4Basic user’s request CNGS flux [  pot/year] 4.7 (4.5)7.0 (4.5)7.5 (4.5)4.5 FT spills [  10 5 /year] 3.2 (3.4)3.0 (5.1)3.3 (5.6)7.2 East Hall spills [  10 6 /year] NTOF flux [  pot/year] ISOLDE flux [μA] [nb. of pulses/hour] bunch train for LHC at PS exit [  ppb] (2*) Performance in 2010 with (i) a PSB repetition period of 0.9 s, (ii) ppp in the SPS and (iii) Linac4 injecting in the PSB (i)(i)+(ii)(i)+(ii)+(iii) * ultimate Analysis: Medium term performance

COMPASS meeting 2/07/2004 R.G. for the HIP WG 12 Analysis: Brightness for LHC LHC nominal1.05 × × LHC ultimate1.7 × PS nominal (estimate)1.05 × × PS ultimate (estimate)1.7 × × PS max. (experimental)1.4 × Problem of the present scheme: Bunch intensities within the same emittances Including transmission loss to 450 GeV Solutions PS batch compression Linac 4Linac 4 + batch compression Bunch intensity (PS max.)2.65 × × × Nb. of bunches / PS pulse42 (48)7248 PS repetition period3 BP2 BP

COMPASS meeting 2/07/2004 R.G. for the HIP WG 13 Analysis: Potential of future accelerators INTEREST FOR LHC upgradeNeutrino physics beyond CNGS Radio-active ion beams (EURISOL) Others Low energy 50 Hz RCS (~ 400 MeV / 2.5 GeV) Valuable Very interesting for super-beam No? 50 Hz SPL (> 2 GeV ) Valuable Very interesting for super-beam + beta- beam Ideal Spare flux  possibility to serve more users High energy 8 Hz RCS (30 GeV) Valuable Very interesting for neutrino factory NoValuable New PS (30 GeV) ValuableNo Valuable 1 TeV LHC injector Very interesting for doubling the LHC energy No Valuable for kaon physics

COMPASS meeting 2/07/2004 R.G. for the HIP WG 14 Analysis: Comments Irradiation caused by beam loss at high intensity is a major concern (Report by M. Benedikt). 0.6 s basic period is much more expensive than 0.9 s and would severely limit the flexibility of the PSB. Increasing the intensity per pulse in the SPS is the only means to increase the flux for CNGS. Many issues need investigation [machine impedance (kickers, RF…), injection energy, need for bunching in the PS…]. CNGS and FT (COMPASS) share the available SPS cycles. In the analysis, priority has been given to CNGS.  too few FT spills (factor of ~ 4). Any compensation to FT will be detrimental to CNGS.

COMPASS meeting 2/07/2004 R.G. for the HIP WG 15 Recommendations: Short term & high priority (1) “…we strongly support:  the on-going efforts to modify the control system for increasing the flexibility in the change of operating modes. We underline that, to achieve that goal in 2006, the accelerators’ equipment must imperatively be adapted before that date.  the decision to install immediately a solid state device to switch to the current between TI8 and TT41 magnets and to have it available for the start-up in 2007.”

COMPASS meeting 2/07/2004 R.G. for the HIP WG 16 Recommendations: Short term & high priority (2) “… we consider of the utmost importance to give a high priority to the minimization of beam loss and irradiation:  by developing rapidly the proposed new multi-turn ejection scheme from the PS and implementing it as soon as possible,  by improving the flexibility and ease of control of the machine parameters (independent control of the current in the 5 PFWs circuits in the PS, beam instrumentation and feedbacks,…),  by practicing with high intensity beams before the shutdown in 2005, to train staff and precisely determine the actual capabilities and weaknesses in the accelerators’ complex,  by encouraging preventive maintenance (systematic PS realignment during shutdowns, …).”

COMPASS meeting 2/07/2004 R.G. for the HIP WG 17 Recommendations: Short term & Medium priority “…we consider as highly justified to implement a reduction of the basic period down to 0.9 s. “ “ …we recommend to increase the intensity of the CNGS type of beam in the SPS. This entails:  to analyze the needs in all machines (RF, beam feedbacks, impedance reduction, …) and to define a precise improvement programme, preferably by the end of In particular the longitudinal impedance of the SPS ejection kickers is an identified limitation that we urge to improve as soon as possible.  to start implementing it as soon as possible, profiting from the 2005 shutdown.”

COMPASS meeting 2/07/2004 R.G. for the HIP WG 18 Recommendations: Medium term “…we recommend to replace the 50 MeV proton linac 2 by a 160 MeV H- linac (linac 4). This requires:  to actively pursue R. & D. on components and beam dynamics, to prepare a technical design report for the year 2006,  to start its construction as soon as the necessary resources can be made available, if possible by the end of 2006 so that linac 2 could be replaced by the end of 2010.”

COMPASS meeting 2/07/2004 R.G. for the HIP WG 19 Recommendations: Long term “… The selection of the optimum accelerator to build after linac 4 depends upon decisions which are not yet taken, about the future favored physics programmes at CERN. It is therefore impossible to specify it today.” “… for the time-being, the SPL has the largest potential, which justifies pursuing the on-going study, especially of the low energy front end (linac 4) which is useful in all scenarios.”

COMPASS meeting 2/07/2004 R.G. for the HIP WG 20 Summary of recommendations At short term, to define in 2004 and start in 2005 the 3 following projects:  new multi-turn ejection  increased intensity in the SPS for CNGS (implications in all machines)  0.9 s basic period At medium term, to work on the design of Linac 4, to prepare for a decision of construction at the end of At long term, to prepare for a decision concerning the optimum future accelerator by pursuing the study of a Superconducting Proton Linac. Availability: start-up 2008 Cost (P+M): < 6.8 MCHF Availability: start-up 2007 ? Cost (P+M): ? Availability: start-up 2006 Cost (P+M): ~ 1 MCHF Covered with the budget already requested

COMPASS meeting 2/07/2004 R.G. for the HIP WG 21 ANNEXES

COMPASS meeting 2/07/2004 R.G. for the HIP WG 22 Beam loss (1)

COMPASS meeting 2/07/2004 R.G. for the HIP WG 23 Beam loss (2)

COMPASS meeting 2/07/2004 R.G. for the HIP WG 24 FACTS:  The total amount of beam lost every year will be nearly twice the 1998 figure.  40 % will occur at PS ejection. CONSEQUENCES:  Fast aging of equipment (e.g.: septum cable and oil)  degradation of reliability  frequent interventions  personnel dose  Reduced access to more zones ?  Ring activation Beam loss (3)