MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

Slides:



Advertisements
Similar presentations
SEM08-14 Specialist Task Forces (STFs) Who they are ? What can they do for you ? How we manage ? ETSI Seminar June 2010 Specialist Task Forces (STFs) Who.
Advertisements

SEM08-14 SPECIALIST TASK FORCES (STFS) ETSI Seminar SEM08-14.
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
Restricted © Siemens AG All rights reserved Siemens Corporate Technology | Month 20XX Proposed topics for TDL phase 3.
Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox.
1 MOTOROLA and the Stylized M Logo are registered in the US Patent & Trademark Office. All other product or service names are the property of their respective.
2nd Quarterly Resource Management and Performance Report Financial Highlights From January 1 to June GS/OAS/SAF/DFAMS – August 21, 2014.
State Home Construction Grant Program 2013 Grant FundingGrant Program Timeline Grant Program Update ARRA Update.
Missouri Budget Update FANG Meeting June 21, 2012.
SGR & Capital Working Group Initial Overview 8/31/2015 Draft for Discussion & Policy Purposes Only1.
1 NTHMP FY08 Funding Jenifer Rhoades Date: June 17, 2008.
The life-cycle of a 3GPP Spec Abridged for family viewing.
Budget Status Update (58% of year completed) May 7, 2012.
Special Rating Areas Financial Roles and Responsibilities January 2014.
Override Decision 2015 Sunnyside Community Responds.
1 FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - FUTURE STESEG WORK - CURRENT AND NEW PROJECTS - SHORT-TERM ECONOMIC STATISTICS EXPERT GROUP (STESEG)
AR WMO Information System (WIS) UPDATE REPORT TO ADC FEB.2008.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Contra Costa County Office of Education May 2015 Local Control Funding Formula: Supporting Continuous Improvement.
Georgia Association of MPOs November 29, 2012 North Augusta Park and Ride Project.
Protocol Testing GSM /GPRS Protocols: MM, CC, RR,Physical Layer, RF & NAS UMTS Protocols: NAS, RRC,RLC,MAC,BMC,PDCP, Physical Layer, RF,QoS Core specs.
U.S. Department of Agriculture eGovernment Program October 14, 2003 USDA Presidential Initiatives Working Group Meeting Chris Niedermayer, Associate CIO.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Preparing for 2017 RA Update March Tampa Bay Reasonable Assurance Update Annual assessment of water quality and attainment status of chl-a.
Finance Tasha Robinson Director of Finance (803)
1 SEM08-14 rev. Mar 2001 Specialist Task Forces (STFs) Alberto BERRINI CPM department Specialist Task Forces - Project Manager.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Louisiana Library Connection Network Update November 2004.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
1 NTHMP FY08 Funding Jenifer Rhoades Date: June 17, 2008.
ATRIP Status Update Edward Austin, P.E. Innovative Programs Bureau Alabama Department of Transportation 2015 Legislative Conference December 3, 2015.
Hazardous Materials Emergency Preparedness Grant Multi – Year Award Process Matthew R. Jones Sr. Grants Management Specialist Grants and Registration Branch.
Graduate Assistant Differential Update & Changes Summer Session, 2008.
FY09 NTHMP Grants Process and Budget Jenifer Rhoades November 19, 2008.
FY14-FY22 IT Roadmap – Update Budget and Investment Committee October 8, 2013.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
ATRIP Status Update Edward N. Austin, P.E. Alabama Department of Transportation 2016 ACEA Conference May 11, 2016.
Children’s Services Telephone: Fax: th Floor Overseas House Quay Street Manchester.
TST TTCN-3_development_plan TTCN-3 development plan Group Name: TST WG Source: Easy Global Market (EGM) Meeting Date:
Maintenance Task Group Closing Report
© ETSI All rights reserved
Financial Status and proposed Budget for 2018
Cost of Service Analysis & Rate Design
SCOPE of the Technical Committee
Implementing the Transportation/Land Use Connection Program
Budget & Planning Calendar.
3GPP Status.
Expert Group on New and Renewable Energy Technologies (EGNRET)
UMTS Call Set UP UE Node B System Information:
STF 478: TTCN-3 Evolution 2014 Progress Report #3
Planning and Budget Committee
RFID Networks workshop 2nd RFID workshop Meeting Follow-up
FY 19/20 SAC RAR Process Diagram (Operating year- FY18/19)
STF430 Final Report Summary
2015 Budget Update and DRAFT 2016 Credit
RNE Technical meeting February 2018, PCS UG.
STF393 Status TTCN-3 Language Maintenance
STF 478: TTCN-3 Evolution 2014 Progress Report #3
FY 19/20 SAC RAR Process Diagram (Operating year- FY18/19)
STF 491: TTCN-3 Evolution 2015 Final Report summary
Specialist Task Forces (STFs)
STF393 Final Report Summary TTCN-3 Language Maintenance
Shareholders Rights Directive II SMPG Task Force Progress Status
Presentation transcript:

MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP

Task 160 (TTCN) - Funding Task 160 (TTCN) - Funding Completion of all contracts for the received 3GPP 2001 funding (26 mm) for the 1 half of this year. PCG acknowledged the needs from TSG-T for the funding shift from FY 2002 to FY 2001 and approved the request. A call for the TTCN voluntary contributions has been circulated within the SDOs (ref. ETSI CL 2083). –Answer deadline set to end of May, –6 mm of the voluntary funding from Motorola received, –The remaining need for the 2 nd half of 2001 will be funded by the shifted funding. For the further spending request for TTCN project during FY2002 and 2003, requested budget (58mm with 50% extra allowance) will be discussed in October.

Progress & Measures Progress & Measures Progress in TTCN draft –400 TTCN test cases available in v.102, –60 new GMM test cases drafted, –TTCN for SS control largely updated in accordance with ASP update v.102 (RAB reconfiguration, security & DL channel power control). During Feb. – May, 3 TTCN experts were available. Considering high CR volume in the core spec, two experts allocated for the TTCN maintenance. Warning: the goal for 460 TTCN test cases in June will NOT reached. (estimated 410). In order to maintain the Sept. goal to approve , additional 3-4 experts will be started soon. Their result is expected in August. –L2 (MAC, PDCP & BMC) tests, –Multi-cell TTCN tests (RRC measurement and idle mode), –SMS over PS.

TTCN plan