Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
S-Curves & the Zero Bug Bounce:
Project Scheduling Using OpenProj.
Test Execution and Defect management. 2 Module Objectives Introduction to Test Execution Checklist of Test Execution Defect management Defect Classification.
[PROJECT NAME] Project Gating Presentation Presented to: [Audience Name] Presenter: [Your Name] Date: YYYY-MM.
Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
A A A N C N U I N F O R M A T I O N T E C H N O L O G Y : IT OPERATIONS 1 Problem Management Jim Heronime, Manager, ITSM Program Tanya Friehauf-Dungca,
Evaluation and Reporting ENTC 4060 Project Scheduling.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Root Cause Analysis Procedure (IMSP525) Training
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
PROCESS AND PRODUCT QUALITY ASSURANCE
Effective Meetings in CCPE A Prescription for Success CCPE Lunch Time Learning by Paul Tumolo 10/4/2011 HARVARD SCHOOL OF PUBLIC HEALTH C ENTER FOR C ONTINUING.
Project Work and Administration
Validating and Improving Test-Case Effectiveness Author: Yuri Chernak Presenter: Lam, Man Tat.
By Saurabh Sardesai October 2014.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Quality Consulting Overview of Reports Module. Quality Consulting Dashboard Reports Dashboard Reports module provides project highlights for users of.
Quality Consulting Adaptive Processes Consulting Pvt. Ltd. An ISO 9001:2008 Certified Company This document is the property of.
TECH Project Design and Manufacturing Control Process for Formula SAE Analyze Phase Date: 11/19/2014 Team members: Chris Lawrence.
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
Test Reporting Best Practices By Gabriel Rodriguez.
Office of Project Management Metrics Report Presentation
COMPGZ07 Project Management Presentations Graham Collins, UCL
Software Development Life Cycle Decisions Project Management Disciplines Stacey Shearn September 8, 2005.
RUP Fundamentals - Instructor Notes
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Software Project Management Lecture # 7. Outline Project Scheduling.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
Presenter Date Page Project manager The PROGRAM The Company Name 03/21/01 STOPLIGHT METRICS Stoplight Charts provide a means of communicating the status.
Computing and SE II Chapter 15: Software Process Management Er-Yu Ding Software Institute, NJU.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
Risk Management How To Develop a Risk Response Plan alphaPM Inc.
Introducing Project Management Update December 2011.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Hussein Alhashimi. “If you can’t measure it, you can’t manage it” Tom DeMarco,
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
MGT 461 Lecture #27 Project Execution and Control Ghazala Amin.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Where Module 04 : Knowing Where the Project Is 1.
Z26 Project Management Presentations Lecture 5b 9 th February 2006 Graham Collins, UCL.
M ANAGKEMENT COMPONENTS OF SOFTWARE QUALITY. S OFTWARE QUALITY METRICS Chapter 21.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Project Management (x470)
Project life span.
Presenter Name Presentation Date
Overview – Guide to Developing Safety Improvement Plan
Presenter Name Presentation Date
Executive Summary Project Name: Period :.
Overview – Guide to Developing Safety Improvement Plan
STEP 7 - EXECUTION PHASE: MONITORING & CONTROLING
Project Implementation
The 9 steps to successful project implementation
Presenter Name Presentation Date
Project Management Metrics
Presenter Name Presentation Date
Project Progress Summary - Week 18
Presenter Name Presentation Date
Schedule (Major Deliverables and Milestones)
Presentation transcript:

Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis( milestone analysis is used to give visibility of progress in terms of predefined milestone goal. Failure to meet a milestone indicates that a project is not proceeding to plan and needs a management corrective action) From this report we prepare future actionable items according to the priorities and make the list of next weeks actionable. This is part of the project Communication plan. The Report shows quantitative information about the project The purpose of a Test Status Report is to provide an ongoing history of the project, which becomes very useful in terms of tracking progress, evaluation and review.

1. Project Name – The project name that you are reporting metrics on. 2. Duration – The reporting period 3. Report by – Owner / Author of the Report. 4. Report to – Target Audience( like Team lead or Managers) 5. Previous weeks Accomplishment – Activities performed after last reporting date. 6. Missed Accomplishment – Not able to work on any planned activity of the previous report. 7. Plans for next week – Future planning for the tasks to be performed during the current reporting period or if there any pending deliverables to take care first. Brief description of the different attributes of test status report

8. Issues: Issues holding the QA team from delivering on schedule: we can mark these issues in red color. These are the issues that requires managements help in resolving them. Issues that management should be aware: These are the issues that not hold the QA team from delivering on time but management should be aware of them. Mark these issues in Yellow color. 9. Cumulative Issues– Issues from previous report, if not addressed should be listed here. 10. Test execution Details for previous week – Test details for the reporting period Total effort spent on test execution Total number of functionality tested during the reporting period. 11. Defect status: Active defects: List all active defects here with Module, Severity, priority, assigned to. Closed Defects: List all closed defects with Module, Severity, priority, assigned to. 12. Test Summary Total number of test cycles, number of defects found, and defect tracking details should be listed in this section. Test Coverage details in terms of functionalities tested and test cases executed should be detailed in this section. 13. Project Milestone – Important project schedule from a testing point of view should be listed here.

The Test Status report should also represent the status through charts and graphs for easy and better understanding. Functionality Coverage vs. Duration Functionalities tested during different releases or during different reporting period can be shown in a graph to give an indication about the progress of test coverage.

Defects reported vs. closed This graph report shows the find and fixes counts for bugs reported against the reporting period. This gives Management an idea of the defect trends.

Defect Location This graph displays the defect occurrence in different modules. This helps the management in assessing the most problematic area in the project.

Defect Classification These details help in conducting a root cause analysis and taking corrective measures to improve product quality. RCA (Root cause analysis) is a mechanism of analyzing the defects, to identify its cause. We brainstorm, read and dig the defect to identify whether the defect was due to “testing miss”, “development miss” or was a “requirement or designs miss”. This helps to prevent defects in the later releases or phases.

Test Case Progression Chart This gives a clear indication of test progress against the test plan over a time.

Severity wise Defect Distribution This gives a indication about the severity wise defect distribution.

Finaly, Test status report involves analyzing the information and metrics available to support conclusions, recommendations, and decisions about how to guide the project forward.