1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.

Slides:



Advertisements
Similar presentations
Interfacing BUFR to NMC Systems Jeff Ator NOAA National Weather Service United States of America WORLD METEOROLOGICAL ORGANIZATION RA.
Advertisements

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, December Lecture 9 Operational GTS management.
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
Status report on the implementation of GISC at CMA Li Xiang NMIC, CMA
STATUS AND UPGRADATION PLAN OF RTH NEW DELHI AND TELECOMMUNICATION NETWORK OF IMD N.K.Pangasa Director RTH New Delhi.
The GEONETCast Alert Channel and CAP over GTS
Lecture Note No.3 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS ( Current Operational procedures of data exchange on the GTS.
CMAs Satellite-based Data Services NMIC, CMA. Outline CMAs domestic communication networks CMAs data dissemination services – CMA PCVSAT broadcast – CMA.
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
November 2006 TECO-WIS, Seoul 1 Definition of the Internet Network of networks –millions of smaller domestic, academic, business, and government networks.
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
INTERNATIONAL SATELLITE COMMUNICATIONS SYSTEM (ISCS) SUCESSOR TCP/IP SYSTEM Background - Status – Backup RA IV/WG-PIW-04/Doc. 5.2(1) ISCS Status (13.X.2004)
WMO Migration Plan Principles of the WMO Migration Plan.
Aeronautical Meteorology Service of China
NOAA’s NWS Telecommunication Gateway RTH Washington
NMHS and Airline Responsibilities for AMDAR Programme Implementation & Operation Mexico AMDAR Regional Workshop, 8-10 November 2011 Dean Lockett Observing.
Chapter 4. After completion of this chapter, you should be able to: Explain “what is the Internet? And how we connect to the Internet using an ISP. Explain.
CMA’s new GTS system Submitted by YANG Genlu, China
Advances in the use of observations in the ALADIN/HU 3D-Var system Roger RANDRIAMAMPIANINA, Regina SZOTÁK and Gabriella Csima Hungarian Meteorological.
CMA’s Network and HPC environment Tian Hao NMC, CMA Aug. 27, 2003 Busan.
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
Practical Exchange of ATOVS Direct Broadcast Data in Asia Pacific Region Akihiko Nakazono Office of International Communications, Forecast Department,
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
THORPEX Interactive Grand Global Ensemble (TIGGE) China Meteorological Administration TIGGE-WG meeting, Boulder, June Progress on TIGGE Archive Center.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
Data Communications and Computer Networks Chapter 2 CS 3830 Lecture 8 Omar Meqdadi Department of Computer Science and Software Engineering University of.
TURKISH STATE METEOROLOGICAL SERVICE
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
STATUS OF RTH MOSCOW (Submitted by Expert (Russian Federation)) ________________________________________________________________ Summary and Purpose of.
Sep 20-22, 2006 APSDEU-7, Honolulu/Hawaii 1 Status of AP-RARS implementation at Tokyo Japan Meteorological Agency Prepared by A. Nakazono, T. Saito, H.
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Overview of the WWW monitoring.
Validation of model clouds using synthetic brightness temperature model and satellite images Zhian Sun 1, Lawrie Rikus 1, Charmaine Franklin 1, Luo San.
CAP Implementation Workshop WMO, Geneva December 2008 CAP over the GTS (WMO's Global Telecommunication System) Simon Elliott EUMETSAT
Progress of CMA TIGGE Archive Data center (updated) Bian Xiaofeng,Li Xiang,Sun Jing (National Meteorological Information Centre,CMA) Chen Jing Hu Jiangkai,
Current and Future Use of Satellite Data in NWP at Environment Canada Satellite Direct Readout Conference 2011 Miami, USA David Bradley, Gilles Verner,
JMA's Status Report related to WIS Tatsuya Noyori JMA ET-WISC 2-5 February 2010.
Jae-Myun Meteorological Satellite Division Korea Meteorological Administration Current Status of Data Exchange and Application.
RTH NEW DELHI INDIA METEOROLOGICAL DEPARTMENT NARENDRA NIGAM
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Organisation principles of the GTS.
Russian Federation CDMS1 Integrated Data Management System Alexander Besprozvannykh.
1 00/XXXX © Crown copyright North America-Europe Data Exchange Meeting Dorval, Canada May 2004.
Slide 1© ECMWF CONSTRAINTS TO INCREASED WEATHER RADAR DATA EXCHANGE Understanding the technical Information Systems constraints (R Giraud, ECMWF and Secretariat)
1 Collaboration for Beijing and Tokyo GISC prototypes Akira Nakamori JMA ET-WISC-III Jun.2008.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
1 Towards Full GISC Compliance for IMD in
NOAA Near Real-Time AIRS Processing and Distribution System Walter Wolf Mitch Goldberg Lihang Zhou NESDIS/ORA/CRAD.
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
Quality Monitoring in JMA
Status of GISC Tokyo GISC Tokyo / JMA.
Status and Plans of RMTN in RA V (For report to ICT-ISS Sep 2010)
Introduction to GISC Beijing Service
Status report of GISC Beijing
Automation of NMCs for GTS operation
Current Status of Implementation of MTN at RTH Toulouse
Status Report of GISC Beijing
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
Status Report of GISC Tokyo
RA VI Migration Plan. RA VI Migration Plan Specific features of RA VI Migration Plan.
Status of Implementation at RTH Tokyo
Status Report of RTH Tokyo
Telecommunication and Data Handling Systems at NMC, China
GISC New Delhi Status Dr. S. L. Singh
Background - Status – Backup
Presentation transcript:

1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA

2 Outline CMA ’ s GTS system Data received via GTS China ’ s meteorological data and products shared over GTS and CMA ’ s PCVSAT system Requirements on ATOVS data

3 CMA’s GTS system

4 Development of CMA’s GTS system The first generation CMA ’ s GTS system started operation in GTS circuits connected with Beijing Ulan Bator, Pyongyang, Moscow, Hanoi, Tokyo, Offenbach The second generation CMA ’ s GTS system put into operation in 1991 RTH Beijing designated by WMO in 1993 The number of GTS circuits grew to nine The new links to Seoul, Bangkok, and New Delhi established Circuit rate and protocol upgraded Migration to TCP/IP completed on the links to Offenbach, Tokyo, Moscow, Seoul, Ulan Bator The third generation CMA ’ s GTS system put into operation

5 Current Status of CMA’s GTS System —— GTS links connected with RTH Beijing GTS link toSPEED (Kbps) CIRCUIT TYPE PROTOCOL Offenbach48/48FRFTP Tokyo48/48FRTCP sockets Moscow8/8FRFTP Seoul32/32FRTCP sockets Bangkok9.6Leased LineX.25 PVC New Delhi9.6Leased LineX.25 PVC Ulan Bator14.4Leased LineFTP Pyongyang75BaudLeased LineASYNC Hanoi75BaudLeased LineASYNC

6 Current Status of CMA’s GTS System —— Detailed configuration of the GTS links

7 Current Status of CMA’s GTS System —— Detailed configuration of the GTS system

8 A firewall set up on the IP based connections X.25 circuits and asynchronous circuits connected to the system via a multiprotocol router Computer systems – The front end and the back end are two separate systems. – Each system is a duplicated system. – UNIX based Application Software – Front end collecting and disseminating data over GTS Supporting FTP, TCP sockets, X.25, ASYNC – Back end checking data packaging messages and files distributing data to the other internal operational systems, such as real-time database. – Operational monitor system monitoring and managing the application system C/S based software running on Linux based PCs Web Server – located in the DMZ of CMA’s Internet system – providing real-time observations and CMA’s products to national and international users – collecting meteorological data from other GTS centers by FTP, Web Ingest and via Internet Current Status of CMA’s GTS System —— Configurations and Functions of the GTS system

9 Data received via GTS

10 Global observations TAC code: SYNOP, TEMP, PILOT, SHIP, BATHY, BUOY, CLIMAT, CLIMAT TEMP, AIREP, AMDAR, TRACKOB, TESAC, WAVEOB, SATEM, SARAD, SATOB …… BUFR code: ATOVS(NOAA, EARS), AMDAR …… NWP products ECMWF, EDZW, EGRR, KWBC GRIB products Fax charts RJTD, RUMS fax charts

11 ATOVS data received from GTS (1) EARS products: received via Beijing-Offenbach GTS link Instrument Abbreviate Bulletin Header Allocation Typical Range of Bulletin Headers Originating centre AMSU-AINAXii_EUMSii = 01 to 08 Frascati (ESA/ESRIN) AMSU-BINBXii_EUMSii = 01 to 43 HIRSINHXii_EUMSii = 01 to 20

12 ATOVS data received from GTS (2) NOAA Satellites ATOVS Data: received via Beijing-Tokyo GTS link Instrume nt Abbreviate Bulletin Header Allocation Typical Range of Bulletin Headers Geographical areaOriginating centre AMSU-A AMSU-B HIRS IUXCii_KWBCii = 01 to ° - 90°E northern hemisphere 90°E - 0° northern hemisphere NCEP IUXDii_KWBCii = 01 to11

13 Traffic statistics on Beijing-Offenbach GTS link Symmetric bandwidth Data exchanged via ftp 1.1 Mbytes/day 177 Mbytes/day - including EARS products 100Mbytes CIR=48kbps Beijing FR Offenbach 48Kbps

14 Traffic statistics on Beijing-Tokyo GTS link Symmetric bandwidth Data exchanged via TCP sockets 1.8 Mbytes/day 38 Mbytes/day - including NOAA Satellites ATOVS products 2.5Mbytes CIR=48kbps Beijing FR Tokyo 48Kbps

15 China’s meteorological data and products shared over GTS and CMA’s PCVSAT system

16 China’s meteorological data and products shared over GTS China ’ s observations (in TAC code) SYNOP, TEMP, PILOT, CLIMAT, CLIMAT TEMP, AMDAR …… RSMC Beijing products (in GRIB code) Global model T213 Element: Po, H, T, Td, U, V Data times: 00 UTC, 12 UTC Forecast times: HH+00, …, H+168 Δt = 12 h Levels: Surface,1000, 925,850,700,500,400,300,250,200,150,100hPa Resolution: 1°* 1°

17 CMA’s PCVSAT system Total rate of broadcasting: 2Mbps Supporting 256 logical channels, the typical logical channel rate is 64kbps Authorization and management centralized at hub Over 2300 remotes installed in China and some NMHSs of neighboring countries Pyongyang, Ulan Bator, Hanoi

18 China’s meteorological data and products shared over CMA’s PCVSAT system China ’ s observations (in TAC code) SYNOP, TEMP, PILOT, CLIMAT, CLIMAT TEMP, AMDAR …… RSMC Beijing products (in GRIB code) Global model T213 (same as the data disseminated over GTS) Regional model HLAFS Element: Po, H, T, Td, U, V, divergence, vertical velocity, moisture flux, divergence of moisture flux, depression of dew point, pseudo-equivalent temperature Data times: 00 UTC, 12 UTC Forecast times: HH+00, 06, 12, 18, 24, 30, 36, 42, 48 Levels: Surface,1000, 925,850,700,500,400,300,250,200,150,100hPa Resolution: 0.25°* 0.25° FY-2C satellite images (files): visible, infrared and water vapor cloud images

19

20 Requirements on ATOVS data

21 Requirements on ATOVS data We hope that we could get NCEP ’ s ATOVS data on real time via GTS: NOAA 15,16,17 ‘ s 1B global data. 3*14 Orbits/day. 40channels/Orbit(include: HIRS, AMSU-A, AMSU-B).

22 Thank you!