Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
Booster Cogging Teststand Progress Update Kiyomi Seiya, Alex Waller, Craig Drennan August 22, 2012.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
HFT face-2-face F.Videbaek Brookhaven National Lab.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Tevatron BPM Upgrade Stephen Wolbers CD Briefing February 4, 2004.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
February Testing Campaign Summary. Disclaimer This presentation is based on the reports of the testing campaign and focuses on the problems arisen during.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Tevatron BPM Upgrade Stephen Wolbers DOE Review February 25, 2004.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
TBPM Front-End Software Design Review L.Piccoli April
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Planning/Budget Stephen Wolbers CD All Hands Meeting May 7, 2004.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Tevatron BPM Upgrade Project Review Summary Stephen Wolbers December 19, 2003 Tevatron Department Meeting.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
CLAS12 DAQ & Trigger Status
The ELENA BPM System. Status and Plans.
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004

Stephen Wolbers CD Briefing: Tev BPM Upgrade 2 Outline of this talk Introduction Current milestones/changes in schedule Accomplishments and Status Prospects and Plans –Shutdown work –Commissioning –End of Project/MOU’s Issues and concerns Summary

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 3 Introduction: What is to be delivered by the TeV BPM Upgrade project? All new electronics. Front-end software. Data to the online/controls system. Applications to use the new data. The pickups in the accelerator will not be modified! Pickups Controls/Offline Electronics/VME 240 pickups960 channels

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 4 S. Wolbers – Project Manager B. Webber – Deputy Project Manager J. Steimel – Technical Coordinator B. Banerjee – Project Assistant J. Nicholls – Project Assistant Electronics Vince Pavlicek Front-End/ DAQ Software Margaret Votava Online Software Brian Hendricks Offline Software Rob Kutschke Requirements Mike Martens Tev BPM Upgrade Project Organization (no big changes)

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 5 Changes to Project since the last briefing BLM portion was removed. Implications: –The BLM will build their own interface to the controls system. –We can remove most of the old BPM system but must leave the BLM portion functional. No AIP was required to fund the project. –This saved us work. Deliveries are later than scheduled. New effort brought in for service building work (Tim Kasza’s people) and for EchoTek understanding (Eric James, Gustavo Cancelo) New Task Structure from AD Project –One task was split into two (fabrication->H/W &S/W) –The rest are just re-numbered.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 6 Project Planning – Schedule DOE Milestones (1) = Finished 9/22/03Tev BPM Requirements Review 12/19/03Tev BPM Technology Review 2/13/04Core Electronics PO placed –3/11/04EckoTek order placed 4/1/04 First modified board delivered –6/15/04Updated First modified board –8/9/04 Current date of 1 st Mod. Board 4/28/04Electronics system design review –5/14/04Design Review –7/19/04Final design complete

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 7 Project Planning – Schedule DOE Milestones (2) 6/1/04First Production Board delivered –10/7/04First Production Board delivered 6/15/04First crate in Tevatron –8/23/04Begin installation in service bldg 9/10/04All Echotek boards delivered –No longer a milestone 9/29/04System complete and cabled –12/6/04Begin commissioning (not a DOE milestone) 12/21/04Commissioning complete –1/12/05Commissioning complete 3/31/05Project Complete

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 8 Project Planning - Cost The wbs is effort loaded and contains all M&S and SWF. Totals (not including overhead and contingency) –M&S: $1.76 Million (Same as December 2003 estimate) This is all in the AD budget. We will spend almost exactly $1.76Million so this looks fine for now. –SWF: $1.3 Million <- Rising as the project time stretches Combination of CD and AD effort, costed to their respective organizations.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 9 First complete wbs effort estimate Effort Report: Not synchronized with The commissioning plan (Updated) NOT UPDATED!

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 10 Key Accomplishments Measurements/proof of concept –Resolutions –Pbar measurements Designsand specifications –Front-end, online, offline software –Analog front-end system –Timing System –Filters –Cables

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 11 Key Accomplishments Prototypes/test stands Service Building survey and preparation Purchases –Crates, MVME Processors, analog filters, cables, timing and filter boards, etc. It isn’t easy spending $1.76M Old New

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 12 Key Accomplishments Documents –Minutes of all meetings –Written documents in the AD Doc DB 122 documents uploaded as of 7/28/04 A document is a container and often has many documents, so 122 is a lower bound. –Specifications, designs, schematics, implementation plans. –MOU’s Hardware (In AD and CD for review) Software (Still inside TeV BPM Project) Web pages

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 13 Key Accomplishments The best of all – so far. –Position measurements on the teststand using new H/W and S/W.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 14 Hardware modules Timing Board prototypes Filter Board prototypes EchoTek boards –Modified with VME interface, memory and FPGA changes –Still waiting for second version

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 15 Timing Card

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 16 Timing Card

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 17 Filter Board

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 18 Filter Board

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 19 EchoTek Board

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 20 Final Crate Configuration – Front Panel

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 21 Old Test Stand (From February)

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 22 Test Stand in July, 2004 – FCC3

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 23 Dawn VME Crate

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 24 Status Integrating H/W and S/W on the FCC3 teststand. Installing second teststand in the accelerator (A3) this week. Will make measurements (closed orbit first) with the beam. Test of end-to-end system (pickups – filter – EchoTek – FE – online – controls) This will be a major accomplishment!

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 25 Prospects and Plans Shutdown –Plan to install most of the 27 crates during the shutdown. –There is space in the racks. –We will have the VME crates and MVME processors. –Some concern about the remaining items.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 26 Prospects and Plans Commissioning –The system will be commissioned house by house after the beam returns in December, –Can’t commission during the shutdown- the accelerator needs the old BPM system to bring up the beam. –Can do some installation in parallel with the commissioning.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 27 Prospects and Plans End of Project: –Need to commission the whole system –Diagnostics and calibrations need to be developed and documented. –The system needs to be documented and handed over to operations. –MOU’s Hardware Software

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 28 Issues Most Issues and concerns mentioned in February have been dealt with or have gone away by magic. Some expertise needed in the project, but we are making progress on many fronts. Much work to do! Integration and commissioning will bring many surprises.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 29 Issues MI BPM –MI BPM is another large BPM system. –Discussions of CD contributions have occurred off and on during the past 6-12 months. –No commitments at this time that I know of. –I am sure we will all hear more in the near future.

August 3, 2004Stephen Wolbers CD Briefing: Tev BPM Upgrade 30 Summary The Tevatron BPM Upgrade is moving forward thanks to the hard and dedicated work of many people in CD and AD. We are reaching an exciting part of the project where we integrate and commission the system. The plan is to finish in early 2005.