Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Florida Water Forum Everglades Restoration June 3, 2011.
The South Florida Watershed
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Barr Hammock Levy Prairie Loop Trail Alachua County Board of County Commissioners, October 28, 2014.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Cornville Community Park Conceptual Design Recreation Area and Facility Design Class April 9, 2008.
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee.
Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Growth Management Legislative Discussion March 20, 2012.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
Greenlee County June 2008 County Engineers – Mormon Lake Philip Ronnerud, Engineer.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Growth Management Legislative Discussion June 19, 2012 Growth Management Legislative Discussion June 19, 2012.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
US Army Corps of Engineers Comprehensive Everglades Restoration Plan Master Recreation Plan.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Evaluation and Appraisal Comprehensive Plan Amendments Adoption Public Hearing City Council March 3, 2015.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
STA-1E Structures, Flow, & Long Term Enhancements*
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
California Water Commission
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water Management District Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water Management District

Overview Long-Term Plan submitted in December 2003 as part of application to modify the ECP and non-ECP permits, consistent with the Everglades Forever Act Plan acknowledged there would be revisions based on new science or other information – strength is adaptive management Plan proposed public process to make revisions – quarterly communication meetings and GB presentations; also WRAC Long-Term Plan submitted in December 2003 as part of application to modify the ECP and non-ECP permits, consistent with the Everglades Forever Act Plan acknowledged there would be revisions based on new science or other information – strength is adaptive management Plan proposed public process to make revisions – quarterly communication meetings and GB presentations; also WRAC

Proposed Revisions 1. Opportunities to integrate with CERP projects by contributing State funds 2. Additional land available for expanded treatment areas 3. Updated STA information 1. Opportunities to integrate with CERP projects by contributing State funds 2. Additional land available for expanded treatment areas 3. Updated STA information

Opportunities to integrate with CERP projects by contributing State funds Inter-basin transfer to balance loads among the STAs EAA Canal improvements – recognized as CERP projects Bolles, Cross, Miami and North New River Accelerate survey work in FY04 Accelerate work in FY05 and FY06 Does not increase federal funding Inter-basin transfer to balance loads among the STAs EAA Canal improvements – recognized as CERP projects Bolles, Cross, Miami and North New River Accelerate survey work in FY04 Accelerate work in FY05 and FY06 Does not increase federal funding

Additional land available for expanded treatment areas Storage requirements of EAA Reservoir can be met using just Compartment A Recommending treatment areas on Compartments B and C Regional Feasibility Study Ensure optimal inter-basin transfer of water to balance flows and loads among the STAs Other regional alternatives Storage requirements of EAA Reservoir can be met using just Compartment A Recommending treatment areas on Compartments B and C Regional Feasibility Study Ensure optimal inter-basin transfer of water to balance flows and loads among the STAs Other regional alternatives

Conceptual Schematic for Compartment B Treatment Areas 2,015-acre expansion of STA-2 by 12/31/06 if possible Additional 7,575 acres as treatment area, ASAP

Conceptual Schematic for Compartment C Treatment Areas 2,560 acre expansion of STA-5 by 12/31/06 if possible Additional 6,240 acres as treatment area, ASAP

Additional STA information STA-1 East PSTA demonstration project moved to Cell 2 STA-1 West Revisions to number and type of structures to improve operations STA-2 Construction of the new interior levees/water control structures and vegetation conversion after flow-through of new Cell 4 STA-1 East PSTA demonstration project moved to Cell 2 STA-1 West Revisions to number and type of structures to improve operations STA-2 Construction of the new interior levees/water control structures and vegetation conversion after flow-through of new Cell 4

Additional STA information STA-3/4 No revisions proposed STA-5 Delete one seepage pump station for consistency with new flow-way Remove obstructions to flow STA-6 Construction of the new interior levees/water control structures and vegetation conversion after flow-through of new Cell 4 Evaluating necessity of features considering full build-out of Compartment C STA-3/4 No revisions proposed STA-5 Delete one seepage pump station for consistency with new flow-way Remove obstructions to flow STA-6 Construction of the new interior levees/water control structures and vegetation conversion after flow-through of new Cell 4 Evaluating necessity of features considering full build-out of Compartment C

Public recreational access and use Addition of facilities to STAs consistent with the recently-adopted District policy Parking, boat ramps, signage, fencing, public education, maintenance, etc. Addition of facilities to STAs consistent with the recently-adopted District policy Parking, boat ramps, signage, fencing, public education, maintenance, etc.

Summary Strength of Plan is adaptive management Revisions being proposed: 1. Opportunities to integrate with CERP projects by contributing State funds 2. Additional land for expanded treatment areas 3. Updated STA information Will continue to communicate and coordinate with other agencies and stakeholders Will present these to the September Governing Board Strength of Plan is adaptive management Revisions being proposed: 1. Opportunities to integrate with CERP projects by contributing State funds 2. Additional land for expanded treatment areas 3. Updated STA information Will continue to communicate and coordinate with other agencies and stakeholders Will present these to the September Governing Board