Silicon Track Trigger Status report 7 Oct. 1999 (Horst D Wahl) l funding l ongoing activities l what next? l schedule l Webpage of STT group: –http://www-d0.fnal.gov/~wahl/vtxt.htm.

Slides:



Advertisements
Similar presentations
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
The Silicon Track Trigger (STT) at DØ Beauty 2005 in Assisi, June 2005 Sascha Caron for the DØ collaboration Tag beauty fast …
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
L2 Silicon Track Trigger All D0 Meeting 11 January 2002 Ulrich Heintz Boston University.
Feb 26, 2004 Mike Hildreth – DØ Collaboration Meeting Run IIb Trigger Simulation Report Mike Hildreth & Ela Barberis for the Run IIb Trigger Simulation.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
1 DØ trigger system 3 levels L1 deadtimeless L1 deadtimeless L2 100  s L2 100  s L3 farm, 50 Hz L3 farm, 50 Hz Brown involvement L2 STT L2 STT L1CTT.
Presentation to DØ STT Stony Brook by Reginald J. Perry, Ph.D. Professor and Chairman Department of Electrical and Computer Engineering (ECE)
G. Steinbrück 7-November The DØ Silicon Track Trigger Georg Steinbrück Columbia University, New York On behalf of the DØ collaboration Vertex 2002.
ALICE HLT High Speed Tracking and Vertexing Real-Time 2010 Conference Lisboa, May 25, 2010 Sergey Gorbunov 1,2 1 Frankfurt Institute for Advanced Studies,
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Framework for track reconstruction and it’s implementation for the CMS tracker A.Khanov,T.Todorov,P.Vanlaer.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
Trigger design engineering tools. Data flow analysis Data flow analysis through the entire Trigger Processor allow us to refine the optimal architecture.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Experience with analysis of TPC data Marian Ivanov.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
VHDL design and FPLD implementation for Silicon Track Card Presentation by Shweta Lolage In partial fulfillment of the requirements for the degree of Masters.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
9 February 2000CHEP2000 Paper 3681 CDF Data Handling: Resource Management and Tests E.Buckley-Geer, S.Lammel, F.Ratnikov, T.Watts Hardware and Resources.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
E. Hazen – FNAL – 5 Apr 2004 L1CTT DFEA Motherboard / Daughterboard Design, Cost, Schedule 4.
Svtsim status Bill Ashmanskas, CDF simulation meeting, Main authors: Ashmanskas, Belforte, Cerri, Nakaya, Punzi Design goals/features: –main.
22 June 2000 D  NIU Workshop S. Doulas From Detector to Ntuples: Muons Steven Doulas Northeastern University Boston, MA D0 Muon Upgrade Group.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The DØ Silicon Track Trigger Bill Lee Florida State University 27 October 2003  Introduction + Motivation  Design  Status
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
G. Steinbrück 11-October The DØ Silicon Track Trigger Georg Steinbrück Columbia University, New York Collaboration Meeting 10/11/2002  Introduction.
L3 Filtering: - short- and medium term plans - how you can help out All-D  Meeting: 14 th March 2003 Terry Wyatt (FNAL-CD/Manchester) on behalf of the.
STT simulations (Horst Wahl, 25 February 2000) l trigger simulation  (Silvia Tentindo-Repond, Sailesh Chopra, John Hobbs with help from Brian Connolly,
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
System-On-a-Programmable-Chip (SOPC) Implementation of the Silicon Track Card (STC) Thesis Defense By Arvindh-kumar Lalam Department of Electrical and.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
FNAL PMG Feb 5, DØ RunIIb Trigger Upgrade WBS 1.2 Paul Padley, Rice University for the DØ Trigger Upgrade Group.
Sept. 7, 2004Silicon VTX Workshop - Brookhaven National Laboratory, Long Island, New York Prototype Design of the Front End Module (FEM) for the Silicon.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
The DØ Silicon Track Trigger Wendy Taylor IEEE NSS 2000 Lyon, France October 17, 2000  Introduction  Overview of STT  STT Hardware Design u Motherboard.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
L2 Silicon Track Trigger D0 Trigger Workshop 22 April 2002 Ulrich Heintz Boston University.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
20 April 2002Bill Lee APS 1 The D0 Silicon Track Trigger Bill Lee Florida State University.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
FTK: update on progress, problems, need
CLAS12 DAQ & Trigger Status
STT Detector risk’s assessment
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Trigger, DAQ, & Online: Perspectives on Electronics
The Silicon Track Trigger (STT) at DØ
ATLAS: Level-1 Calorimeter Trigger
L1FW: towers, tracks, correlations
STT Simulator Status and To Do List
Linear Collider Simulation Tools
Linear Collider Simulation Tools
Data Collection Module (DCM) (review, fabrication plan & chain test)
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

Silicon Track Trigger Status report 7 Oct (Horst D Wahl) l funding l ongoing activities l what next? l schedule l Webpage of STT group: – --- has links to other relevant pages at Boston U., Stony Brook, Columbia Outline:

STT Funding History (chapter 1999) l 15 October 1998: PAC at Fermilab: Committee sympathetic, but want more information l 5 January: submit addendum to proposal to PAC l 15 January 1999: PAC at Fermilab: PAC grants stage I approval l 15 February 1999: submit MRI proposal to NSF (consortium of four universities: Boston U., Columbia U., Stony Brook, FSU) l March 1999: submit STT proposal to DOE (same consortium of four universities: Boston U., Columbia U., Stony Brook, FSU) l June 1999: NSF funds project at 1.1 M$ (requested 1.3M$, with ~0.5M$ matching from universities (BU, CU, SB, FSU) and foreign collaborators (Nijmwegen, IN2P3)) DOE promises to make up for missing money (~250k$) l October 1999: money becomes available, subcontracts being issued

Recent and ongoing activities l examined alternate designs –L1 DFE board option: use standard L1 digital front-end boards for STT implementation -- conclusion: cannot use DFE board as is (board too small -- only 6U), but adopt some features; in particular adopt concept of same motherboard for all parts of the STT l studies of track fitting: –optimize tracking algorithm for time and efficiency –strategy for picking hits in CFT roads (have to go through all hit combinations?) –timing studies in different implementations (integer DSP, floating point DSP, Alpha, Altera 10k..) –have finished implementation in Altera 10k100; too slow -- now investigate possibility of using integer algorithm to gain speed

Ongoing activities, cont’d l queueing studies: –now use Ptolemy, since RESQ not supported; –first studies confirm results previously obtained with RESQ –detailed timing specifications formulated -- will allow further refinement of model for more realistic simulation –questions to be answered: iidentify potential bottlenecks in data flow through the trigger iadditional buffering needed, and where? l link with L1CTT: –influence of truncation (limit on number of tracks reported) on efficiency –how to minimize number of duplicate tracks in broadcasting –develop code for FPGA on L1CTT-to-L2STT broadcasting board

Ongoing activities, cont’d l Trigger simulation: –main package, input, output, clusterfinding done and implemented –hit filtering and track fitting exist as stand- alone packages, to be implemented into package –vertex finding package to be designed –presently only one clustering algorithm implemented -- other possible algorithms to be included to allow comparative performance studies

Engineering design l real engineering design work started few months ago l decisions taken recently: –use standard 9U VIPA crates –common motherboard for all of STT –daughter cards provide functionality for data receiving, transmitting and processing –use point-to-point links (LVDS) for fast data flow within STT –input from SMT and L1CTT over G-link via VTM (D0-CDF standard) –Cypress hotlink for output to L2CTT –propose to use PCI bus for data transfer on motherboard l detailed specifications of STT data links, data flow, protocol in progress l have conceptual design of clusterfinding logic, studies of clustering algorithms underway l VHDL coding of clusterfinder and hitfilter for STC in progress

Trigger simulation l components designed, implemented and released: –tsim_L2STT (main package), –getSMT_FE ( read out for the input chunk from the SMT front end –getFT_L1 ( read out for the input chunk of CTT L1) –doClustering ( calculate clusters from SMT hits by using one possible clustering algorithm) –fillNtuples ( fills local STT Ntuples that can be directly integrated into the Ntuple Maker) –fill_L2STT ( creates the L2STT output chunk ) l testing of implemented code: –used MC events (t tbar with superimposed min. bias events) to test package, and in particular cluster algorithm performance

Trigger simulation, cont’d l components designed and developed as standalone programs (to be implemented in package): –doRoads ( associates SMT clusters into 'roads' defined from CTT tracks ) –doTrackFitting ( reconstruct STT tracks from the SMT clusters in roads) l components to be designed and implemented: – doVertexing (reconstructs Z vertex from Z clusters ) l other things to be done: –implement other cluster algorithms –do performance studies

Monitoring l Levels of monitoring: – STT internal monitoring: this monitoring capability must be foreseen in the design of the STT hardware; try to use/copy/modify existing monitoring plans (e.g. for central tracker read-out system) –Level 2 global on DEC Alpha in L2 global crate: adapt standard L2 tools, but in hardware design must foresee relevant information to be available to L2 global –Level 3 under Windows NT: code to be developed, adapting standard L3 tools –Online monitoring using EXAMINE: code to be developed –Offline batch monitoring: code to be developed

D0 STT project l Present participants : –Boston University: Ulrich Heintz (f), Meenakshi Narain (f), Bill Earle (e), Eric Hazen (e), John Yook (s) –Columbia University: Hal Evans (f), Bill Sippach (e), Georg Steinbrueck (p), Maurice Leutenegger (s) –Florida State University: Stephan Linn (f), Harrison Prosper (f), Horst Wahl (f), Sailesh Chopra (p), Silvia Tentindo-Repond (p), Brian Connolly (s), Roberto Brown (s), (Simon Foo (f)) –Stony Brook: John Hobbs (f), Wendy Taylor (p), Chuck Pancake (e) l Tentative schedule: –Nov specification complete –March 2000: first prototype –Oct 2000: 2nd prototype –March 2001: production begins –June 2001: production complete

What next l For next engineering meeting (19 Nov): –Finalize and sign off on motherboard design –finish cluster finder and hit filter –optimize + finalize track finding algorithms, decide on processor –sign off on data transmission protocols –make sure that tools for testing, monitoring, in situ diagnostic are foreseen in design –make sure we understand all quantities (e.g. alignment info, beam position,…) that need to be available to trigger, provide for their downloading and storage l need more MC events for more physics studies (need disk space!) –study influence of misalignment –get good understanding of efficiencies –influence of algorithm choice l specify other tasks (e.g. beam position monitoring, alignment,..), and identify manpower for them l bimonthly engineering workshops, last 24 Sept, next 19 Nov.