2014-2015 Annual Report of the Department of Rural Development and Land Reform Presentation to the Portfolio Committee on Development and Land Reform 14.

Slides:



Advertisements
Similar presentations
MerSETA Strategic Plan Derrick Peo General Manager : Innovation, Research & Development.
Advertisements

Implementation of the Government Immovable Asset Management Act, 2007 (GIAMA) National Department of Public Works Presentation to the Select Committee.
HDA’s revised strategic direction and Annual Performance Plan 2013/14 March 2013.
PRESENTATION TO THE PORTFOLIO COMMITTEE OF AGRICULTURE, FORESTRY AND FISHERIES AGRIBEE CHARTER COUNCIL STRATEGIC PLAN AND BUDGET FOR 3 YEARS 2015/16 –
Promoting Employment Equity in the Public Service Presentation to the Portfolio Committee, Parliament Briefing by the Department of Public Service and.
Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all Presentation to the Portfolio Committee on Rural Development.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
Department of Rural Development and Land Reform : 2013/14 Annual Performance Plan Presentation to Portfolio Committee on Rural Development and Land Reform.
VACANCIES AND IMPLEMENTATION STRATEGY FOR THE FINANCIAL YEAR Presentation to the Portfolio Committee on Rural Development and Land Reform 30.
11 1 CHIEF OPERATING OFFICER DEA Strat Plan workshop with PCWEA 6-7 March 2012 Parliament, Cape Town 1.
DEPARTMENT OF LAND AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE ON 25 MARCH 2003 Dr Gilingwe Mayende, Director General.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
Programme 4: Housing Development Finance Purpose: Fund national housing and human settlement development programmes in terms of the Housing Act (1997),
DEPARTMENT OF AGRICULTURE, FORESTRY AND FISHERIES COMPREHENSIVE AGRICULTURAL SUPPORT PROGRAMME IMPACT EVALUATION 20 OCTOBER 2015.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
RECAPITALIZATION AND DEVELOPMENT PROGRAMME (RADP): PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL AFFAIRS 22 MAY 2013.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT & LAND REFORM DATE: 13 APRIL THIRD QUARTER EXPENDITURE REPORT FOR THE FINANCIAL.
Hearings on the LandCare Conditional Grant: 2010/2011 & 2011/2012 First Quarter Ms Nandi Mayathula-Khoza, MEC GAUTENG DEPARTMENT OF AGRICULTURE AND RURAL.
PERFORMANCE REPORT 2010/11 11  1220 tenure rights applications  449 Board approved  211 signed - R revenue generated.
DEPARTMENT OF LAND AFFAIRS Presentation of the Strategic Plan Select Committee: Land & Environmental Affairs Mr Mdu Shabane DDG: Land Affairs 22 May 2007.
Briefing to the Portfolio Committee on Rural Development and Land Reform (DRDLR) Audit outcomes of the DRDLR portfolio 2 February 2016.
DRDLR Strategic Plan and 2014/15 Annual Performance Plan presentation to Portfolio Committee 2 July 2014.
Human Resource Development Strategy Presentation to the Portfolio Committee on Rural Development and Land Reform 23 April 2013.
STRATEGIC PLAN OF THE COMMISSION ON RESTITUTION OF LAND RIGHTS, PRESENTATION TO THE SELECT COMMITTEE ON LAND AND MINERAL RESOURCES 11 JULY 2014.
DRDLR Strategic Plan and 2014/15 Annual Performance Plan presentation to Select Committee on Land and Mineral Resources 11 July 2014.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
RESTITUTION OF LAND RIGHTS AMENDMENT BILL, 2013 PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 9 OCTOBER
Briefing to the Portfolio Committee on the Department of Rural Development and Land Reform on the audit outcomes for the 2013/2014 financial year Presenters:
DEPARTMENT OF LAND AFFAIRS Presentation of the Strategic Plan Portfolio Committee on Agriculture & Land Affairs Mr Glen S Thomas Director-General 14 March.
STRATEGIC PLAN OF THE COMMISSION ON RESTITUTION OF LAND RIGHTS, Presentation to the Portfolio Commission on Rural Development and Land Reform 02.
PROGRESS REPORT ON LAND RESTITUTION CLAIMS PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 07 FEBRUARY 2012 MR T. A MAPHOTO.
2014/15 Budget Allocation: Presentation to the Select Committee on Land and Mineral Resources 11 July 2014.
DEPARTMENT OF RURAL DEVELOPMENT AND LAND REFORM Annual Performance Plan 2016/17 Presentation to the Portfolio Committee on Rural Development and Land Reform.
DEPARTMENT: LAND AFFAIRS Department of Rural Development and Land Reform Draft Annual Performance Plan: Presentation to the Portfolio Committee.
Department of Rural Development and Land Reform’s Annual Report Presentation to the Select Committee on Land and Mineral Resources 17 May 2016.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 16 APRIL
Department of Rural Development and Land Reform STRATEGIC PLAN AND BUDGET STRATEGIC PLAN AND BUDGET PRESENTATION TO THE SELECT COMMITTEE.
Portfolio Committee on Rural Development and Land Reform 6 April 2016 Ms N Ntloko-Gobodo – Chief Land Claims Commissioner.
"Building a caring society. together"1 DSD Annual Report 2007/08 Presented to Portfolio Committee on Social Development 22 January 2009.
Support Services 1. International Cooperation Unit Strategic objective: Promote a global sustainable development agenda Key Performance Areas: - –Effectively.
ANNUAL PERFORMANCE PLAN
PRESENTATION OUTLINE Part A: Strategic overview
RIPARIAN RIGHTS OF FARMERS
NATIONAL YOUTH DEVELOPMENT AGENCY Presentation to Portfolio Committee
DRDLR 2017/18 APP PRESENTATION WITH BREAKDOWN PER PROVINCE
DEPARTMENT OF RURAL DEVELOPMENT AND LAND REFORM
UIF ANNUAL REPORT 2005/06 PRESENTATION TO THE PORTFOLIO COMMITTEE
BRANCH: CORPORATE SERVICES Deputy Director-General
Department of Rural Development and Land Reform Annual Performance Plan: Presentation to the Select Committee on Land and Environmental Affairs.
OFFICE OF THE PUBLIC SERVICE COMMISSION
Commission on Restitution of Land Rights Briefing session on Annual Reports to the Portfolio Committee on Rural Development and Land Reform 12.
ANNUAL PERFORMANCE PLAN PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 18 APRIL 2018.
Presentation of the 2009/10 Annual Report
11/18/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY PORTFOLIO COMMITTEE – 02 MAY 2018.
  FRAMEWORK FOR THE IDENTIFICATION & ACQUISITION OF LAND FOR HUMAN SETTLEMENTS DEVELOPMENT 4 AUGUST 2015.
12/5/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY Select COMMITTEE – 19 June 2018.
INGONYAMA TRUST BOARD STRATEGIC PLAN :
Briefing session on Annual Reports 2016/17 to the Portfolio Committee on Rural Development and Land Reform 04 OTOBER 2017.
Department of Rural Development and Land Reform
ANNUAL PERFORMANCE PLAN 2017/2018 PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 02 MAY 2017.
Annual Report of the Department of Rural Development and Land Reform
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
PRESENTATION TO THE SELECT COMMITTEE ON LAND AND MINERAL RESOURCES
Presentation to the Portfolio Committee - Labour
DRDLR Strategic Plan and 2014/15 Annual Performance Plan presentation to Select Committee on Land and Mineral Resources 11 July 2014.
4th QUARTER PRELIMINARY PERFORMANCE REPORT: FINANCIAL YEAR PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM DATE.
Department of Rural Development and Land Reform
Department of Land Affairs
Annual Report PRESENTATION Portfolio Committee on Rural Development and Land Reform 10 OCTOBER 2018.
Presented by DG: Mdu Shabane 22 May 2012
Presentation transcript:

Annual Report of the Department of Rural Development and Land Reform Presentation to the Portfolio Committee on Development and Land Reform 14 October 2015

Presentation Outline: Non-Financial Performance 2014/15 Financial Year Introduction and Mandate The role of the department in assisting the Ingonyama Trust Board Organisational concerns and options Performance of the department – Departmental performance in years 2009/10 – 2014/15 – Programme 1 : Administration – Programme 2 : Geospatial and Cadastral Services – Programme 3 : Rural Development – Programme 4 : Restitution – Programme 5 : Land Reform Employment equity Capital projects implemented in 2014/15 and costs 2

INTRODUCTION Manifesto 2009NDPMTSF Rural DevelopmentImproved land adminImproved admin Land ReformImprove food securityImproved food security, Sustainable land reform Agrarian changeSmall holder farmer development Small holder producers development Descent work and sustainable livelihoods Access to quality basic services Increased access to basic services Education, Crime, HealthGrowth of sustainable rural enterprises Growth of sustainable rural enterprise 3

MANDATE OF THE DEPARTMENT  Rural Development:-  Improving both economic and Social infrastructure in rural South Africa.  Land Reform:-  Restitution, Redistribution and Land tenure.  Agrarian Change:-  Driving social transformation and Increasing agricultural production in rural areas. 4

LEGISLATION, POLICIES AND INSTITUTIONS  LEGISLATIONS The department has thusfar developed/amended and/or proposed key pieces of legislation.  SECTIONAL TITLES AMENDMENT ACT, 2010 (Act 11 of 2010)  RURAL DEVELOPMENT AND LAND REFORM GENERAL AMENDEMENT ACT, 2011 (Act 4 of 2011)  GEOMTATICS PROFESSIONS ACT, 2013 (Act 19 of 2013)  SPATIAL PLANNING AND LAND USE MANAGEMENT ACT, 2013 (Act 16 OF 2013)  PROPERTY VALUATION ACT, 2014 ( Act 17 of 2014)  RESTITUTION OF LAND RIGHTS AMENDMENT ACT, (Act 15 of 2014)  EXTENSION OF SECURITY OF TENURE AMENDMENT BILL, 2013  DEEDS REGISTRIES AMENDMENT ACT, 2013 (Act 34 of 2013) POLICIES Various policies were developed and approved internally by Minister:  Rural Development Framework Policy, 2013  Land Tenure Security Policy for Commercial Farming Areas, 2013  Recapitalization and Development Programme Policy, 2013  State Land Lease and Disposal Policy, 2013  Agricultural Landholding Policy Framework, 2013  The Green Paper on Land Reform, 2012 INSTITUTIONS  Land Commission, Land Rights Management Board and Office of the Valuer-General. 5

Entity reporting to the Minister Ingonyama Trust Board [ITB] The relationship with the ITB is governed through legislation and this is complimented in various by assisting the Trust in the following areas:  Policy development.  The development and compilation of Strategic Plans, Annual Performance Plans, Operational Plans and Annual Reports.  Funding to augment it’s budget to assist it to achieve its strategic objectives, with an emphasis on land administration. 6

Non-Financial Performance of the Department 7

8

Programme 01 : Administration Provides strategic and logistical support in the form of;  Executive support services;  Corporate support services;  Financial services; and  Corporate governance; 9

Programme 1: Administration Strategic Objective : Ensure 100% compliance with government regulations and legal prescripts by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) % of allocated budget spent 99.9%100%99.9% The variance is due to; -vacant positions not filled timeously; -some projects which did not progress as envisaged; % of valid invoices paid within 30 days upon receipt by supply chain management 91%100%92%The variance is due to; -invoice discrepancies; -Tax Clearance Certificates that have expired; -ex-post facto invoices; 10

Programme 1: Administration Strategic objective : Obtain an unqualified regularity opinion on financial and non-financial performance by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Unqualified financial statements New Indicator Unqualified audit without findings on financial statements Partially Achieved. The Department achieved an unqualified audit opinion with findings. The variance is due to some of the systems, controls and policies taking longer to finalise due to development processes and consultations. % of external audit findings resolved 92%100%92% The process to approve policies in some branches took longer than anticipated. There were also delays in the process of sourcing service providers. 11

Programme 1: Administration Strategic Objective : Improve employees’ and prospective employees skills to enhance service delivery by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) DRDLR Human Resource Development Strategy approved New Indicator DRDLR Human Resource Development Strategy developed Partially Achieved. Draft strategy was finalised pending approval Consultation process took longer than anticipated. Number of people trained in Geomatics The project has been a significant contributor in addressing the shortage of skilled black professionals in this field. 12

Programme 02 : Geospatial and Cadastral Services The purpose of Geospatial and Cadastral Services programme is to provide geospatial information, cadastral surveys, deeds registration, spatial planning and information as well as technical services in support of sustainable land development. 13

Programme 2 : Geospatial and Cadastral Services Strategic Objective : Facilitate integrated spatial planning and land use management in all provinces through the application of relevant legislation by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) National Spatial Development Framework (NSDF) developed and Implemented New Indicator Approved research report and consultation on NSDF Partially Achieved. Draft Research report available and consultation on NSDF Research Report conducted in various provinces The partial achievement was due to the consultation process which took longer than anticipated % of municipalities supported to implement the Spatial Planning and Land Use Management Act (SPLUMA) New Indicator 60%: SDFs 61% (170 municipalities supported) The over-achievement was due to Municipalities that were eager to have compliant SDFs as it’s a requirement in terms of the Integrated Development Plan (IDP) and the SPLUMA, which came into effect on 01 July

Programme 2 : Geospatial and Cadastral Services Strategic Objective: Strategic Objective : Facilitate integrated spatial planning and land use management in all provinces through the application of relevant legislation by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) % of municipalities supported to implement the Spatial Planning and Land Use Management Act (SPLUMA) New Indicator 20% Land Use Schemes 31% (86 Municipalities supported) The over-achievement was due to Municipalities that were eager to be compliant with the requirements in terms of SPLUMA, which came into effect on 01 July New Indicator 80%: Functional Land Use Regulator 0% (0 municipalities supported). The achievement was dependent on the finalisation of the land use regulations. The regulations were published on 23 March 2015 and Provincial Offices are now facilitating the establishment of Land Use Regulators in all municipalities. Number of provinces supported to develop Provincial SDFs New Indicator4 4 provinces (NC, FS, NW, LIM) None 15

Programme 2 : Geospatial and Cadastral Services Strategic Objective :Ensure an integrated and comprehensive land administration system Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of State Domestic Facilities (SDFs) surveyed New Indicator The over-achievement was due to the implementation of a turn-around strategy to catch up with the backlog in the surveying of SDF’s. Number of deeds and documents registered New indicator The over-achievement was due a higher number of documents received than anticipated. Number of maps of the national map series produced New Indicator The achievement of the indicator is dependent the amount of detail in the area being mapped. The lesser the detail, e.g. the Karoo, the quicker the production and thus more maps can be produced in a short space of time. 16

Programme 03: Rural Development Purpose of this Programme is to initiate, facilitate, coordinate and act as a catalyst for the implementation of the Comprehensive Rural Development Programme(CRDP) that leads to sustainable and vibrant communities. The programme covers rural infrastructure and enterprise development, skills and youth development 17

Programme 3: Rural Development Strategic Objective : Provide support to rural communities in all districts to improve their livelihoods Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Rural Livelihoods Strategy approved New Indicator Rural Livelihoods Strategy approved Partially achieved.A draft concept document and draft strategy was done The draft Enterprise and Industrial Development policy was adopted by Senior Manangement with the proviso that it be further consulted with DAFF after which a final draft be presented by both departments for consideration in order to avoid duplication and overlapping. Norms and standards for access to rural services developed New Indicator Norms and standards for access to rural services developed Partially achieved. Draft norms and standards have been finalised. The partial-achievement was due to the consultation process which took longer than anticipated Rural Development Strategy and Systems developed and implemented New Indicator Rural Development Strategy and systems developed and approved Not achieved The target was not achieved due to the consultation process taking longer than anticipated 18

Programme 3: Rural Development Strategic Objective : Improve access to services in rural areas by coordinating and providing integrated infrastructure by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Number of socio- economic infrastructure Projects coordinated and facilitated The achievement was slightly higher due to some ICT projects that were scheduled for completion in 2015/16 being finalised in 2014/15. Number of Households supported with basic services infrastructure In collaboration with the Independent Development Trust more projects could be completed. Number of projects implemented in support of the River Valley Catalystic Programme New Indicator1431 The over-achievement was due tomore irrigation schems being commisioned in KZN and EC. A number of goverments 27 Priority Districts also fall within these two province. 19

Programme 3: Rural Development Strategic Objective : Improve access to services in rural areas by coordinating and providing integrated infrastructure by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of Animal and Veld Management Programme projects implemented A few more projects than planned were commissioned in KZN. Strategic Objective : Facilitate the development of rural enterprises in areas with economic development potential and opportunities by 2019 Rural Enterprises and Industrial Development Strategy Implemented New Indicator Rural Enterprises and Industrial Development Strategy developed Not achieved The non-achievement was due to prolonged consultation with other stakeholders Number of enterprises supported in rural development initiatives(agriculture and other sectors) by government stakeholders The over-achievement was due to: -The registration of more co-operatives than planned; -ASNAPP SLA projects delivered on large scale 20

Programme 3: Rural Development Strategic Objective : Increase job opportunities and ensure skills development through CRDP and land reform initiatives by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Number of skills development opportunities provided to support rural initiatives The over-achievement was due to; -increased demand for more community members to be trained in Fire Fighting Skills; -training provided raising awareness and interest in communities; Number of youth skilled in rural development initiatives The target was under-achieved due to problems linked to the SETA registration and uploading process which resulted in 2000 certificates not being issued to confirm completion of the training by the youth during the year under review. Number of jobs created in rural development initiatives The target was over achieved due to more budget allocated to employment opportunities for community members 21

Programme 3: Rural Development Strategic Objective : Increase job opportunities and ensure skills development through CRDP and land reform initiatives by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Mega cooperative established to facilitate support to NARYSEC Youth New Indicator Mega cooperative established to facilitate support Not achieved The Mega cooperative was not achieved due to the requirements of the amended Cooperatives Act(Act 6 of 2013). The new requirement stipulates a minimum of two operational secondary cooperatives before a tertiary cooperative can be considered. Number of youth skilled through the National Rural Youth Service Corps programme The variance is attributed to the fact that multiple skills training opportunities provided to individual youth were regarded as one achievement. Number of rural enterprises supported New Indicator90433 The initial target was based on projects with monetary value (budget). During implementation this year, it became clear that enterprise support goes beyond monetary value and many cooperatives were assisted with registration, and other facilitation functions. 22

Programme 04 : Restitution The Restitution Programme exists to facilitate the settlement of claims, and provide restitution or equitable forms of redress to victims of racially motivated land dispossession, in line with the provisions of the Restitution of Land Rights Act, 1994( Act No.22 of 1994), as amended. 23

Programme 4: Restitution Strategic Objective : Facilitate the restoration of land rights and alternative forms of equitable redress by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Number of land claims settled The target was exceeded because the focus was on settling financial compensation claims with a claim count which could contribute towards the settled claims target e.g. Kraaibosch (WC) settled 30 claims; District Six (WC) settled 15 claims; New Pietersburg (LP) settled 10 claims; Ramputas Individual Claimants (LP) settled 8 claims; St Francis Xavier Community (KZN) settled 6 claims. Number of claims finalised The target was exceeded because of the regional teams that were put in place to clean up the backlog on Commitments. Systems were also put in place to ensure alignment where claims are settled and finalised in the same financial year, e.g. 53 of the finalised claims were settled in the 2014/15 financial year. 24

Programme 4: Restitution Strategic Objective : Facilitate the restoration of land rights and alternative forms of equitable redress by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of phased projects approved New Indicator Additional funding was made available during the third and fourth quarter which allowed for ; -claims which were in the pipeline to be processed for the 2015/16 financial year to be moved forward for settlement and payment; An increasein the number of sittings of the Quality Control Committee. Number of claims lodged by 1998 to be researched New Indicator The achievement was due to: -An intervention plan implemented in February 2015 to make-up the shortfall of 639 researched claims in terms of the annual target; -The operational staff from the regional offices being tasked to prioritise the claims for research which assisted with the cleaning out of the annual backlog. 25

Programme 4: Restitution Strategic Objective : Facilitate the reopening and finalisation of the lodgement of restitution land claims people who did not meet the 1998 deadline Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of lodgement offices Functional New Indicator 14 Lodgement offices opened and functional 14 Lodgement offices opened and functional None 26

Programme 05 Land Reform The purpose of this programme is to promote equitable land redistribution and provide support to small holder farmers. It also ensures the establishment of institutional arrangements for tenure security and land administration 27

Programme 5: Land Reform Strategic Objective : Promote equitable land redistribution and agricultural development by acquiring hectares of strategically located land by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of hectares acquired and allocated ha ha ha The under-achievement was due to farms being withdrawn by the sellers and no longer being available for purchase. Office of the Valuer- General (OVG) established New indicator 50%87% The target was exceeded due to interventions put in place to expedite the process to establish the office. 28

Programme 5: Land Reform Strategic Objective : Provide comprehensive farm development support to smallholder farmers and land reform beneficiaries for agrarian transformation by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15)Actual (2014/15) Number of land reform farms recapitalised and developed Non-achievement of this target was due to the complexities and control mechansms put in place during the application approval processwhich resulted in these taking longer than planned. Number of jobs created in land reform projects (RADP) The over-achievement was due to seasonal work (specifically for harvesting) resulting in a number of employees being appointed to assist during this season. Number of farm personnel trained through the RADP programme Poor performance on this indicator was due to most of the employment opportunities experienced in the year which did not necessitate training since it was general work; planting, harvesting, etc. 29

Programme 5: Land Reform Strategic Objective : Functional systems and institutional arrangements for tenure and land administration to enable agrarian reform in all provinces by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Number of Communal Property Associations compliant with legislation New indicator 1800 The non-achievement was due to; -lack of capacity dedicated specifically to CPAs both at National and Provincial level; -Some CPAs not owning land or having lost land; -New policy developments within the department; Number of labour tenants applications settled The non-achievement was due to; -new policy developments within the department viz:. Circular 1 of There being no dedicated budget to deal with Labour Tenants applications. Number of land parcels transferred under TRANCRAA (Transformation of Certain Rural Areas Act) New indicator 406 Non-achievement was due to the following reasons: -Community dynamics & disputes; -Complex verification of beneficiaries and land rights enquires; -Some communities demanding development before transfer. 30

Programme 5: Land Reform Strategic Objective : Functional systems and institutional arrangements for tenure and land administration to enable agrarian reform in all provinces by 2019 Performance indicator Baseline (Actual output) 2013/14 Actual performance against target Reasons for variance Target (2014/15) Actual (2014/15) Number of State Land parcels confirmed as vested The under-achievement was due to technical uncertainty affecting a holiday resort, registered as Die Bron Vakansiedorp which was regarded as one parcel of land by the DEEDS office whilst the unit regarded it as more than one. % Complete Immovable Asset Register New Indicator 100% None 31

Employment Equity 32

Workforce Profile (Persons with disabilities included) RACE GENDER FMTotal%Target VARIANCE African %+6% Coloured %-4% Indian %-1% White %-1% Total

Persons with disabilities RACE GENDER FMTotal%Target VARIANCE African %75%-19% Coloured4599%11%-2% Indian1344%3%+1% White %11%+20% Total

Persons with disabilities as a percentage of total workforce RACE TotalGrand Total%Target VARIANCE African % Coloured738122%0 Indian412232%+1 White %+3 Total % THE MINIMUM TARGET OF 2% REACHED 35

Employment Equity (EE) Way forward A new five year EE plan ( ) has been developed and consulted with all relevant stakeholders with the aim of ensuring equitable representation of all race groups within the Department. Human Resources has been tasked to develop specific interventions to attract and retain PWD’s and Woman; Branches have been directed to comply with the 50/50 gender split in Senior Management; 36

Organizational concerns and options 37

Organizational concerns and future Plans CAPACITY CONSTRAINTS The ability to attract and retain employees with the requisite skills and competencies is negatively influenced by the push and pull effects of the labour market, as the country develops. As such the Department has embarked on a number of projects to mitigate this;  An analysis of the organisational structure to determine alignment to the Department’s strategic and service delivery mandates;  Improved diversity management project make employees voices heard and to ascertain how they are experiencing diversity issues;  Skills Audit in order to develop a talent pipeline to ensure the department has the right people, with the right skills executing its mandate;  Consistent efforts to reduce the vacancy rate ; SOCIAL TRANSFORMATION CONCERNS  The implementation of a single system for spatial planning and land use management to replace the complex, disjointed and discriminatory spatial planning and land use management system. As a response various milestones set for spatial transformation including the 70% of municipalities supported to implement the SPLUMA 38

Organizational concerns and future plans cont…. REVITALISATION OF THE RURAL ECONOMY In making land reform work – land reform is necessary to unlock the potential for a dynamic, growing and employment-creating-agricultural sector. Enable a more rapid transfer of agricultural land to black beneficiaries without distorting land markets or business confidence in the agri-business sector is required. To assit in this process a number of initiaitves are being initiated and/or explored;  Establishment of the Office of the Valuer-General (OVG)  50/50  Stregthening the Realtive Rights Policy Framework  AVMP  RVCP  District Land Reform Committees  Agri-Parks 39

Capital projects 40

The following is a list of capital projects implemented by the Department in the year 2014/15 with costs ProvinceNumber of projects 2014/15 Total cost of projects Eastern Cape107R Free State28R Gauteng62R Kwa-Zulu Natal151R Limpopo83R Mpumalanga111R Northern Cape08R North West43R Western Cape86R Total679R

Thank you 42