S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Preshower Front-End Boards News LHCb group / LPC Clermont  News  TRIG-PGA Bit Flip Behaviour  Bit Flip Simulations  Conclusion.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PreShower Characterisations
LKr status R. Fantechi.
2009: restart the system: few observations. Hw maintenance week:
Mini-drawers, FE-ASIC , Integrator
VELO readout On detector electronics Off detector electronics to DAQ
UK CMS Oversight Committee Mtg
Presentation transcript:

S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES AND VFE 3)AVAILABILITIES FOR MARCH TESTS COMMISSIONING MEETING – FEBRUARY 2007

S.MonteilCOMMISSIONING2 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Pre-production of 14 boards launched after extensive tests of 2 example boards (mostly scrutiny of the trigger part) -> December 2006 Seven boards received so far (07/02/2006). They were measured OK by the manufacturer. The measurements of the 7 boards lasted one day. Conclusions / bottomline : 4 boards are perfectly OK. 1 board ( 007 ) shows two dead ADC channel (no clock distribution/cured). 2 boards are off ( 006 & 009 ): TRIG device cannot be (re-)programmed with JTAG (unreachable or programmation failed at the end). Under investigation. In addition, one component of delay chips on one of these 2 boards ( 006 ) has to be replaced.

S.MonteilCOMMISSIONING3 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Measurements : I2C communication Connectivity Phasers Data Processing Trigger algorithms DAQ path Most of the answers are binary (error rate compared to a threshold).

S.MonteilCOMMISSIONING4 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Measurements : Quick status Expanded status Popup link to detailed log

S.MonteilCOMMISSIONING5 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Synthesis of the measurements.

S.MonteilCOMMISSIONING6 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Synthesis of the measurements.

S.MonteilCOMMISSIONING7 1) STATUS OF PS/SPD FE BOARDS PRODUCTION AND TESTS Schedule for the reception of the boards and their qualification: Preserie : 7 boards received and tested (07/02/07) 7 boards expected for the end of the week Check them extensively and give the green light for production of the serie end of february. Serie : Start of production expected beginning of April. 6 weeks duration. Delivery each week of a batch of 16 boards. Qualification of a board is estimated to be half a day.

S.MonteilCOMMISSIONING8 2) COMMISSIONING OF PS/SPD AND MARCH TEST There shall be three phases : 1) LED+DETECTOR (photographs fibre ends at the PMT) 2) SPD and PS VFE +Tubes (Dedicated systems operated simultaneously to installation). Could start the second week of march. 3) March test: Will only have PS cabled.

S.MonteilCOMMISSIONING9 2) COMMISSIONING OF PS/SPD AND MARCH TEST 1) DETECTOR: We do already have a measurement w/ cosmics of all the modules giving the mip photostatistics. We would like to have a measurement of the channels response to LED excitation in the pit. Evgueni demonstrated photographs can be taken at the end of the 64-channels bundle. Allows to check all LEDs / channels / fibres after transportation and installation in the pit. SPD schedule : possible now. PS schedule : seems only possible simultaneously with the VFE electronics installation. See Evgueni’s talk

S.MonteilCOMMISSIONING10 2) COMMISSIONING OF PS/SPD 2) TUBES AND VFE : SPD Barcelona team set up a moveable standalone bench to check VFE and tubes (see Xavier’s talk). Able to trig autonomously the LED drivers. Able to supply the HV for the tubes. Able to supply the LV VFE Fully checked at lab. Install VFE and check it beginning of march.

S.MonteilCOMMISSIONING11 2) COMMISSIONING OF PS/SPD 2) TUBES AND VFE : PS A dedicated system has been set up for testing the PS VFE cabling (See Pascal’s talk). As a by-product, commission tubes, VFE (and FE chain). The setup is currently tested at home and consists in DC flashing for a short period with a LED matrix the 64-channels in a known order. Required services : HV from CW LV patch panel for VFE boards. Cooling system not necessary since duration of the test is short.

S.MonteilCOMMISSIONING12 2) COMMISSIONING OF PS/SPD 2) TUBES AND VFE : PS The readout is performed with one PS/SPD FE Board. Output : store channel response in an electronics logbook. Schedule : simultaneous to VFE installation and cabling. Start of the operation for the beginning of March.

S.MonteilCOMMISSIONING13 2) COMMISSIONING OF PS/SPD 3) MARCH TESTS: Availability of the electronics : SPD VFE : installed and checked but not cabled PS VFE : in principle OK w/ the installation schedule. PS/SPD FE Boards : the target is to fill a crate. Consistent with the production planning. SPD Control Board : 4 protoypes already available.

S.MonteilCOMMISSIONING14 3) MARCH TESTS: AIM I At first, use PS/SPD FE Rams to inject signals. Common test last november was very useful. Software ECAL/PS is ready for that purpose. Generate random patterns and check the response. The minor issues reported from the common test on the PS/SPD TRIG device are solved (neighbours phase, BCIDreset convention(s) …). 2) COMMISSIONING OF PS/SPD

S.MonteilCOMMISSIONING15 3) MARCH TESTS: Automated processes under CAT exist to deal with : Tests of connectivity Setting the phasers ECAL and PS/SPD neighbours inputs. Check internally algorithms Define the pipelines for ECAL and PSFE neighbours inputs Common software to check the correctness of the whole response at the TVB level. AIM I Reproduce the common test and extend it to a crate. 2) COMMISSIONING OF PS/SPD

S.MonteilCOMMISSIONING16 2) CONCLUSION 3) MARCH TESTS: AIM II Use PS LEDs. Simultaneous light on 64-channels of a tube. One important goal would be to set up procedures to align in time the boards by tuning the start of the VFE charge integration, dealing with the different lengthes of fibre bundles. INTENTIONS (open questions) Define how to dispose the (hopefully) available 14 FE boards. Reads one supermodule ? Reads a crate ? Check full board / half board configurations ….