BWS PS and SPS problem report J. Emery 21.07.2015.

Slides:



Advertisements
Similar presentations
Copyright, 2006: Invisible Service Technicians, LLC Invisible Service Technicians, LLC Invisible Service Technician Monitor Activation Process: IST MaintSelectionV3.php.
Advertisements

FOTO 24/11/2011 PS FWS RELIABILITY 1 IMPROVING THE PS FWS RELIABILITY.
Mountain Lion Security Mac OS X Strong Passwords Every Mac needs a login name and password Every user on every Mac should have their own account.
Week 6: Chapter 6 Agenda Automation of SQL Server tasks using: SQL Server Agent Scheduling Scripting Technologies.
Module 20 Troubleshooting Common SQL Server 2008 R2 Administrative Issues.
Ramrod III Micro mouse. The Team  Andrew Igarashi – software  Kevin Li – hardware  Stephen Nakamura – hardware  Quang Ngu – software.
Chapter Apache Installation in Linux- Mandrake. Acknowledgment The following information has been obtained directly from
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Copyright © 2013 FingerTec Worldwide Sdn.Bhd. All rights reserved.
Module 8 Implementing Backup and Recovery. Module Overview Planning Backup and Recovery Backing Up Exchange Server 2010 Restoring Exchange Server 2010.
Supervisor: Jonathan Emery Labview control BWS Calibration Bench.
Ch. 5 – Access Points. Overview Access Point Connection.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Mapping Internet Addresses to Physical Addresses (ARP)
CH 6 Configuring Server Hardware and power options.
7.09 Features Detroit, Sept Department
Creating Multimedia Interaction with Windows Media Technologies 7.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
Home Guard Security System. Introduction & Basic Ideas Home Guard Security System.
Module 15 Monitoring SQL Server 2008 R2 with Alerts and Notifications.
Voting with SOSA/OVRD SOSA/OVRD. Login and Information Screens After login, the SOSA Voting Information screen displays The Database drop-down allows.
Scanning Computer Viruses with Reduced Virus Definition File s Daisuke Anzai Supervised by Prof. H Toyoizumi.
CCNA 2 Week 9 Router Troubleshooting. Copyright © 2005 University of Bolton Topics Routing Table Overview Network Testing Troubleshooting Router Issues.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
8/12/2000Guy Crockford BI days New application software for SPS wire scanner controls G.Crockford SL/OP.
C HAPTER 5 T HE PROCESSOR : D ATAPATH AND C ONTROL M ULTICYCLE D ESIGN.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
How to use WS_FTP A Step by Step Guide to File Transfer.
Service Section Technical Training December 2005.
World Leaders in Combustion Management Solutions End User Guide Lockout Codes Pressure Sensors Error Codes Flame Safeguard UV.
LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM)
Karlstad University Computer Science Design Contracts and Error Management External and internal errors and their contracts.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Wire Scanners Observations In SPS & LHC G. TRAD Emittance working group 26/08/2015.
NEMO Basic Support update IETF 61. Status IANA assignments done Very close to AUTH48 call Some issues raised recently We need to figure out if we want.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 6 Report Wednesday 6 th August 2008 Jack Hickish.
BWS E. Piselli – J. Emery On behalf of the BWS working group people.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Daar is geen woord Chinees bij. Follows the push model, messages are not initiated by the software 2.
Texas Skyward User Group Conference Helpful Hints Jennifer Speulda.
windows
Test Weight Apparatus 7/24/08. Test Weight For New Test Select FGIS-927 Test Weight Check Test from Dropdown next to Create New Test To finish an Open.
Chapter 14.  Upon completion of this chapter, you should be able to:  Identify different types of Intrusion Detection Systems and Prevention Systems.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
7/8/2016 OAF Jean-Jacques Gras Stephen Jackson Blazej Kolad 1.
WEB TESTING
Epson XP-640 Tech Support USA & CA
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Injectors BLM system: PS Ring installation at EYETS
ATLAS-AFP interlock validation
PS wire scanner failures
LHC wire scanners status
Configuring EtherChannels and Switch Troubleshooting
OMNIXX to OPENFOX CONVERSION LESSONS LEARNED
swingo XP Firmware, Service Tool & Error Codes
Local Government Corporation
Star Math PreTest Instructions For iPad users with the STAR app
Network monitoring tool.
Saturday 2/4/ :00-09:00 Problems with SPS:
Therac-25.
How to Fix Brother Printer Offline Status with Free Brother Printer Support? VISIT WEBSITE.
IBEX Client Migration to Eclipse 4
Network hardening Chapter 14.
The Troubleshooting theory
How to install and manage exchange server 2010 OP Saklani.
Presentation transcript:

BWS PS and SPS problem report J. Emery

JIRA PS 54H found in wire-reset home with Motor power supply problemhttps://issues/browse/BIWS-539 Problem: 11/07/ :08 LDB shows only part of IN scan (pts overflow), no Out scan Status: FGen busy FGen not at max Wire-rst home Scan on-going Scan check: 11/07/ :02 and 19:04 LDB shows no profiles, but status are coming back to normal. Check all this month scans showed no errors Suspicion on the PowerAmplifier Amplifier changed at 14h30 Multiple scans on all the scanners shown good movements All data reduction disabled to be able to see all the movement in case of problems. Extensive testing in the lab shown that the PowerAmplifier is functional……

JIRA PS 85.V stayed in wrong position in the beamhttps://issues/browse/BIWS-541 Problem: 19/07/ :00 ? Scanner stayed in the middle of the stroke around [bit of potentiometer] All beam stopped at 18:22 Ana went in the PS to move back the mechanism out of the beam Last LDB data at 18:00:22 shows only IN scan, no OUT scan Server last scan is on MD4 user shows raw movement OUT is OK| => SW treatment issue?

JIRA PS 85.V stayed in wrong position in the beamhttps://issues/browse/BIWS-541 From Ana’s mail: 1) The first scan we did on this user left the scanner IN. => No record in LDB or in Server, Why? 2) Large losses, beams stopped, pot at (IN position). 3) INIT HW, since FGEN at max (correctly at IN position) 4) ERROR, wire still in? in the middle, position at bits. 5) No clue why last scan and InitHW has no LDB? 6) Bit 10 raised of the mcStatus (large difference in voltage potentiometer-requested position). => Could indicate an issue with PowerAmplifier 7) Data reduction was enabled in purpose => Missing movement information 8) No power supply error detected. Hardware next steps options: Remove power supply and check in the lab => Next week technician is back to test it. If PowerSupply if broken => Install new one in the machine. If PowerSupply is fine => Install new (or old one) and check in the machine during TS. Software next steps: 1)Check why we have RAW positions, by not out position 2)Check why the server is then missing Logging entries after that (when we have a problem

SPS 416.H WARNING: “Problem resetting position” Called by SPS OP 416 can’t be moved Warning message shows: "Problem resetting position“ Potread: (Home position) Last scan: 19/07/ :29:25 Nothing special seen from the LDB extraction. Positions are OK Status are OK

SPS 519.H Message: “Delay problem” from OP GUI Called by SPS OP 519 can be moved Warning message at the OP GUI: “Delay Problem“ The server don’t show this error This must be coming from OP GUI Nothing special seen from the LDB extraction. Positions are OK Status are OK