AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.

Slides:



Advertisements
Similar presentations
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Advertisements

ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Performance of SPIROC chips in SKIROC mode
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
EUDET FEE status C. de LA TAILLE. EUDET annual meeting 6 oct 08 cdlt : FEE statrus 2 EUDET module FEE : main issues 2 nd generation ASICs –Self triggering.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Organization for Micro-Electronics desiGn and Applications HARDROC 3 for SDHCAL OMEGA microelectronics group Ecole Polytechnique CNRS/IN2P3, Palaiseau.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
Trip-t testing progress report
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Scintillator HCAL read-out and calibration Felix Sefkow TILC08 at Sendai, Japan March 4, 2008.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
Organization for Micro-Electronics desiGn and Applications Ludovic Raux OMEGA microelectronics group Ecole Polytechnique & CNRS IN2P3
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
LED notched fibre distributing system Calibration system for SiPM
STATUS OF SPIROC measurement
LED notched fibre system short HBU0 party with QMB6
ASIC PMm2 Pierre BARRILLON, Sylvie BLIN, Selma CONFORTI,
CTA-LST meeting February 2015
AHCAL Beam Interface (BIF)
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
Testbeam Timing Issues.
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
02 / 02 / HGCAL - Calice Workshop
STATUS OF SKIROC and ECAL FE PCB
SPIROC Status : Last developments for SPIROC
CALICE meeting 2007 – Prague
Testbeam analysis on module #1
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
AIDA KICK OFF MEETING WP9
Scintillator HCal Prototype
Presentation transcript:

AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 2 Outline > Setup Electronics for Charge Injection > SPIROC2 measurement results  Compensation capacitors  HOLD Scans, Dynamic Range  Autotrigger / Testbeam / MIP Efficiency  Rate Dependency > Results from LED system > Outlook > Conclusions

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 3 Charge Injection Setup I – HBU_I in laboratory Looks like an easy setup, but ….

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 4 Charge Injection Setup II HBU has not been designed for charge-injection tests! Initial idea: Analogue SPIROC tests => LAL testboards, HBU => tests of digital part / readout chain / DAQ / system (SiPMs) Due to new effects: HBU is used for analogue tests as well… SiPM SPIROC2 input

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 5 SP2 PA compensation capacitors Problem: Cell dependent amplitude Amplitude decay in first LG memory cells HG histogram ‘bleeds out’ to the left correct position Effect cannot be eliminated as at LAL by a high blocking-cap on VDDD2 (R. Honda) Effect = f(amplitude, input signal shape, PA comp. caps) Effect != f(trigger rate, HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. hold-time=95ns (LG), 130ns (HG) Charge Injection with 5ns risetime. No PA compCs

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 6 SP2 PA compensation capacitors Holdscan w/o compensation capacitors (CompC) compensation caps change input signal shape…. HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. Charge Injection with 2ns risetime.

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 7 SP2 PA compensation capacitors Dynamic Range HG and LG HG LG, no compC LG, with compC HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. Charge Injection with 2ns risetime. CompCs improve severely cell uniformity, CompCs increase HG dynamic range, CompC=3pF still not large enough for very fast signals => Input signal shape changes amplitude.

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 8 SP2 Holdscans Problem: Position of Hold-Maximum depends on signal amplitude. Position is different for HG and LG By Mark Terwort, Mathias Reinecke Compensation capacitors do not improve this behaviour. HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. Charge Injection with 2ns risetime. No PA compCs

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 9 SP2 Holdscans Problem: Position of Hold-Maximum depends on preamp. setting (left) and varies from ASIC to ASIC (right) By Jeremy Rouene Charge Injection with 5ns risetime. 50ns shaping, ext. Hold/Trig No PA compCs ASIC1 ASIC2

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 10 SP2 Rate dependency Injected Charge: 10.47pC (LG) Good behaviour at small signals: -no discharge of analogue memory -no rate dependency Fairly good behaviour at large signals: -no discharge of analogue memory -low rate dependency in last mem.-cells -amplitude decay in first mem.-cells HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. hold-time=95ns (LG), Charge Injection with 5ns risetime. No PA compCs

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 11 DESY Testbeam – ext. Trig vs. Autotrigger black curve: ASIC triggers itself (autotrigger) threshold Results by Jeremy Rouene MIP peak Set threshold to: -minimize noise hits -maximize MIP detection efficiency

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 12 Autotrigger MIP efficiency A MIP efficiency of ~95% can be achieved for a threshold- pedestal- cut at 10^(-4) for most channels (autotrigger mode). See more results in the report: ‘Analysis of the autotrigger of the read out chip of the front- end electronics for the HCAL of the ILC.’ (Hamburg, Aug. 2010) by Jeremy ROUENE

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 13 SP2 autotrigger threshold definition ~172 DACtics / pC (ASIC1) ~182 DACtics / pC (ASIC2) pedestal 2.5 MIP (1.602pC) by charge injection… by testbeam… (8pixels and 350ADCcounts per MIP, SiPM gain of 5*10^5) ~191 DACtics / pC (chn 8) ~120 DACtics / pC (chn 33) Spread: Channel-wise threshold adjustment necessary! Results by Jeremy Rouene ~ok!

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 14 LED Calibration Systems II – DESY + Uni Wuppertal > LED uniformity under investigation > Wuppertal recommended new LED driving circuit and new LED type with lower spread in output. > HBU2 will contain solder parameter field in order to adjust LED power per channel. > Problems: LED light output spread, dynamic range (saturation) LED 1 Cent

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 15 LED Calibration System – Current Activities green: good single-pixel spectrum red: SiPM does not show single-pixels blue: LED or SIPM dead (to be analyzed …) SPIROC2_2 SPIROC2_1 HBU-wide charact. of SiPM single-pixel spectra Development of: Automatic FIT and gain extraction routines (here: for testbeam MIP signals) Results by Julian Sauer

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 16 Next important steps (the last two big points): SPIROC2 TDC characterization SPIROC2 power pulsing first results already there…. DIF firmware needs update… autotrigger! HG PA=100fF, LG PA=200fF 50 ns shaping, ext. Hold/Trig. hold-time=130ns (HG/TDC), Charge Injection with 5ns risetime. No PA compCs

Mathias Reinecke | CALICE meeting Casablanca | Sept. 23rd, 2010 | Page 17 Conclusions and Outlook > Ongoing system tests are important, but delay redesigns as well. > Current effects should be visualized by SPIROC2 simulations (LAL). > Studies from R. Honda at LAL show very similar effects => origin SPIROC2 ? > Not much activity on DIF/DAQ development at DESY currently.