Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.

Slides:



Advertisements
Similar presentations
Linked Thermostat Alan Diamond Ravi Patil. Objectives  Temperature sensing device  Multizone capabilities (two)  Heating and Cooling operation  Personal.
Advertisements

PROJECT MEMBERS: COLIN PAYNE-ROGERS JACOB LENNOX Change of Resistance Test Stand PROJECT GUIDE/MENTOR: DR. BENJAMIN VARELA PRIMARY CUSTOMER: JOE MANAHAN.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
MSD Detailed Design Review Agenda P11212 : LVE Controls, RF Module Meeting Purpose 1. Present an overview of the project. 2. Review Detailed Design. 3.
Electrical and Computer Engineering iLights Nick Wittemen, EE Chris Merola, EE José Figueroa, EE Matt Ryder, EE Comprehensive Design Review.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Molly, Gwyn, Sam, and Eric.  We’ll need 2 PCBs  The main board will have all the converters, current and temperature monitors, and MUXs  The second.
P09311: Interface for Multi-Purpose Driver/Data Acquisition System Adam Van FleetProject Leader, EE DAQ Hardware Development David HoweElectrical Engineer.
CAD/CAM Design Process and the role of CAD. Design Process Engineering and manufacturing together form largest single economic activity of western civilization.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
New Human Computer Interfaces Amnon Dekel HUJI – CSE, Spring 2007 Class 3 March
Electrical and Computer Engineering Irregular Object Dimensioning System Advisor: Professor Neal Anderson Michael Baccari Peter Bian Michael Coughlin Avi.
PIC Evaluation & Development Board Project Team Chad Berg – CprE Luke Bishop – CprE Tyson Stichka – EE Nick Veys - CprE Financial Budget Abstract/Background.
Actively Stabilized Hand Held Laser Pointer May 8, 2014 Kaitlin Peranski Spencer Wasilewski Kyle Lasher Kyle Jensen Chris Caporale Jeremy Berke.
Watt Watch Hassan Alabudib Yirui Huang Peng Chen Kamal Sabi Marisol Lozano Roman.
Digital Microfluidics Control System II P15610 Complete Detailed Design.
Power Generation for the Better Water Maker: Subsystems Design Review October 29, 2013.
 Four Components of a circuit  Power supply  Conductor  Load device  Controlling device  Power Supply  Generator  Line source (wall outlet)  Transformer.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Resistance. Challenge Try and increase the temperature of 200 ml of tap water as much as possible in five minutes using the equipment provided.
To come up with a practicum project that full filled the 411 requirements Create a fun project that would get kids interested in science and engineering.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Home Area Networking for the Smart Grid Erik Cates David Green Daniel Han Justin Michela ECE 4007 Koblasz/Maxwell Fall 2010 In Conjunction With: Unmesh.
Digital Microfluidics Control System II P Previous state - The previous control system is not self contained and uses a class AB amplifier which.
Traumatic Brain Injury Eyewear “TB-Eye” Todd Biesiadecki, Matthew Campbell, Matthew Vildzius ECE4007 L03 EM1 Advisor: Erick Maxwell October 31, 2011.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
UNIVERSAL HORIZONTAL ANALYZER (HA2500) TRAINING. HA2500 Universal Horizontal Analyzer.
Microcontroller Hands-on Workshop #2 Ahmad Manshad New Mexico State University Institute of Electrical and Electronics Engineers October 31, 2009.
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Preliminary Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
LOOP TESTER CALIBRATION Using the 3200 Electrical Test Calibrator.
Electronics for Physical Computing Materials: capacitor, diode, LED, transistor, switch,resistor, relay, proto board, multimeter.
Motor Assisted Wheelchair Design Review 10/01/15.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors:
Bdps 2 Lecture 2. Circuits and Ohm's Law For resistive circuits.
P15342 Linear RF Measurement System Kate Gunderson Matt Chauncey Will Tourtillotte.
Self-Sustainable Electric Golf Bag Final Presentation Group 19 Jon Kinney, Cory Edwards, Harrison Kantner 30 April 2013.
Incheon National University Lee C.H Han D.J.
Team Kevin Thompson EE – Responsible for circuit design Sam Foster EE – Responsible for code which manages power distribution on the heated surface Craig.
How to Build a Digital Physical System - Lab Lecture 2.
Background Customer Requirements Final Test Fixture Subsystems P16203: Smart Power Supply Test Bench CUSTOMER: Bear Power Supplies, Phelps, NY PROBLEM:
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
MEATEOR 3/4/2015 Troy Kremer – speaker 1 Chris McClure – speaker 2 Thomas Johnson Justin Lord Andrew Rains.
ARDUINO BASED UNDERGROUND CABLE FAULT DETECTION
Michael Rahaim, PhD Candidate Multimedia Communications Lab
Prototyping with Microcontrollers and Sensors
Chapter 21 Zener Diodes.
Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka,
RF Range detection and alert system team 26
P17452 Dresser-Rand System Health Monitor System Level Design Review
CTY SAR FCPS Shawn Lupoli, Elliot Tan
Resistance in Series and Parallel
Critical Design Review
Arduino 7 Segment Display Lab
Solar Generation System
Detailed Design Review Solar Thermal Water Heater
Detailed Design Review: P18001
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Preliminary Detailed Design Review: P18001
Presentation transcript:

Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka

Recap of Last Review Functional Decomposition Morphological Chart and Concept Generation Concept Selection Engineering Analysis System Architecture Feasibility Analysis Risk Assessment Test Plan Next 3 Weeks…

Agenda  System Architecture  Requirements Flow Down  Subsystem Interaction  Constant Current and Constant Voltage Loads  Thermal Analysis of Enclosure  Stress Analysis  UML Diagrams  RS-232 Proof of Concept  Stress Analysis for Enclosure  Design of Enclosure and Safety Shield  Air Flow Analysis  Preliminary BOM  Updated Test Plan  Next 7 Weeks…

Subsystem Interaction

Subsystem Engineering Requirements Sub-System ER Physical Enclosure Transparent Safety Enclosure AC disengaged when lid is open AC voltage not accessible Able to withstand UUT failure 1.5’ x 1.5’ x 1’ Quick (dis)connect wires Difficulty to set up / lock in Time to set up < 1 minute Loads Length of test < 5 minutes Output 1 – Active Load Output 2 – Resistive Load Data Storage Store Test Data Feedback AC disengaged when lid is open AC voltage accessibility Pass/fail indication Reason for failure UUT on indication Test Bench on indication Number of test steps under 5 Cooling Internal Temperature < 50 ˚C Processing Length of test < 5 minutes Successfully calibrate UUT AC disengaged when lid is open Tx and Rx data to/from UUT AC voltage accessibility Establish communication with UUT Safety Internal Temperature < 50 ˚C AC disengaged when lid is open Transparent safety enclosure Able to withstand UUT failure AC voltage accessibility

Constant Voltage Load

Constant Current Load

Stress Analysis for Enclosure Metal

Thermal Analysis

UML Diagrams

UML Diagram Cont’d

RS-232 Proof of Concept

Autotransformer Mathematical Proof of Concept

AC Inputs  Two autotransformers were needed to satisfy AC input specifications  The outputs of the transformer will be controlled by a relay  The relay will be controlled by the Arduino Microcontroller  The Hammond Manufacturing Hard Wired 170 Series autotransformer will step down 115 V to 85 V  E100E SOLA HD autotransformer will step from 120 V to 264 V with the added 24 V winding

Feasibility Analysis of Design

Enclosure Material Selection

Enclosure and Safety Shield

Circuitry and Resistor Layout

Airflow Analysis

Airflow Analysis Cont’d

Preliminary Bill of Materials Line ItemPartVendorManufacturerQuantityPrice 16 ", 200 W Tubular ResistorFarnellVishay4~40 2Arduino MegaSparkFunArduino/ATMEL1~$ x 4 (characters) LCDSparkFunN/A1$18 4E075E - Autotransformer (High Line)NewarkSola-HD1$ C - Autotransformer (Low Line)MouserHammond1$ Ohm Tubular ResistorNewarkMulticomp2$5.66

Test Plan  Are the physical measurements ≤ the required dimension?  Measure the physical dimensions of the enclosure  Is the length of the test ≤ 5 min?  Time the entire test starting from power supply board set up finishing with the verification of entire unit test.  Is the Internal Temperature ≤ 50 Celsius?  Use a thermometer to measure  Are there indications of passing/failure of the test fixture?  Verify that the GUI lists pass/fail after a test in complete  Does the AC disengage when lid is open?  Verify power turns off when Safety Shield is opened  Is the AC voltage accessible?  Verify that the AC voltage is not accessible and is within the enclosure.  Is the safety enclosure transparent?  Verify that the Safety Shield is transparent and that the UUT is visible  Is the enclosure able to withstand a failure of the UUT?  Run stress tests and force tests on the base and the safety shield to see how much heat and force each can withstand  Has communication with the UUT been established?  Verify GUI indicates communication has been made  Has data been transmitted and received to/from the UUT?  Verify from GUI that data is being shared and received through the proper completion of the test  Has the UUT been successfully calibrated?  Verify there is an LED indicator that the UUT  Is there reason for failure feedback?  Verify that the GUI states a failure and where in the test it fails  Is there an indication that the UUT is on?  Verify that there is an LED indicator that the UUT is powered on, and a label saying ‘UUT Power On’  Is there an indication that the Test Bench is on?  Verify there is an LED indicator and a label saying ‘Test Bench Power On,’ and verify that the LED is on

Test Plan Cont’d  Are the number of test steps less than 5?  Complete set up and verify that the number of steps is less than five per each test (PS Board test, Controller Board Test, and Entire Unit Test)  Is there a quick (dis)connect?  Verify the connect and disconnect time is less than 5 seconds for each.  Is the time to set up less than 1 minute?  Time the setup of the enclosure  Is the set up difficult?  Based on time to set up and the number of steps, verify that those requirements are met, which will indicate ease of setup.  Is the test data being stored?  Connect SD card and USB to computer to see if test data is being stored  Is the budget under $1500?  Yes/No

Next 7 Weeks… Detailed Design Activities Updated Test Plan Finalize detailed CAD Active Loads PCB Layout Final schematics Bill of Materials Code Algorithms Prototyping Activities Active Load – Constant Current Active Load – Constant Voltage RS232 Communications CNC of Enclosure Materials Risk Assessment

Questions/Concerns?