Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration.

Slides:



Advertisements
Similar presentations
HINS BPM Overview N. Eddy For Instrumentation Dept.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The ATF Damping Ring BPM Upgrade - Overview and Status - Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration N. Terunuma, J. Urakawa (KEK)
TRENDS IN BPM SYSTEM DESIGN The ATF Damping Ring BPM Upgrade Nathan Eddy Manfred Wendt Fermilab Low-ε-Ring Workshop 2011 Heraklion, Crete, Greece.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Collimator BPM electronics – Results from the lab, SPS and LHC
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
The ATF Damping Ring Beam Position Monitor System Manfred Wendt Fermilab for the ATF Damping Ring BPM Team.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
RF acceleration and transverse damper systems
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
CLIC Workshop 2016: Main Beam Cavity BPM
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Damping Ring EDR WP4: Instrumentation & Diagnostics
Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration
Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration

May 31, 2007 LCWS Hamburg Global Design Effort 2 ATF DR BPM Collaboration KEK –Nobuhiro Teranuma –Junji Urakawa SLAC –Doug McCormick –Justin May –Janice Nelson –Tonee Smith –Mark Woodley Fermilab –Charlie Briegel –Nathan Eddy –Bill Haynes –Peter Prieto –Dennis Nicklaus –Ron Rechenmacher –Duane Voy –Manfred Wendt

Outline Motivation Some background information on the ATF damping ring and it’s beam parameters Characteristic of the ATF button-style BPM pickup Overview and details of the new BPM hardware Project history Preliminary results Next steps… –This presentation certainly is incomplete, in particular it does not address the tremendous firm- and software efforts related to the project! May 31, 2007 LCWS Hamburg Global Design Effort 3

May 31, 2007 LCWS Hamburg Global Design Effort 4 Motivation ILC damping ring R&D at KEK’s Accelerator Test Facility (ATF): –Investigation of the beam damping process (damping wiggler, minimization of the damping time, etc.) –Goal: generation and extraction of a low emittance beam (ε vert < 2 pm) at the nominal ILC bunch charge A major tool for low emittance corrections: a high resolution BPM system –Optimization of the closed-orbit, beam-based alignment (BBA) studies to investigate BPM offsets and calibration. –Correction of non-linear field effects, i.e. coupling, chromaticity,… –Fast global orbit feedback(?) –Necessary: a state-or-the-art BPM system, utilizing a broadband turn-by-turn mode (< 10 µm resolution) a narrowband mode with high resolution (~ 100 nm range)

May 31, 2007 LCWS Hamburg Global Design Effort 5 The ATF Damping Ring Machine and Beam Parameters beam energy E=1.28 GeV beam intensity, single bunch≈~ 1.6 nC ≡ e - /bunch ≡ I bunch = 3.46 mA beam intensity, multibunch (20)≈~ 22.4 nC ≡ * 20 e - ≡ I bunch ≈ 48.5 mA accelerating frequency f RF =714 MHz revolution frequency f rev =f RF / 330 = MHz ≡ t rev = ns bunch spacing t bunch =t RF / 2 = ns batch spacing t batch =t rev / 3 = ns horizontal betatron tune≈ ≡ f h ≈ 506 kHz vertical betatron tune≈8.567 ≡ f v ≈ 1200 kHz synchrotron tune≈ ≡ f s ≈ 9.7 kHz repetition frequency f rep =1.56 Hz ≡ t rep = 640 ms beam time t beam = ms (≡ turn # ) t rev t bunch

May 31, 2007 LCWS Hamburg Global Design Effort 6 ATF Damping Ring BPMs BPMs total: 8x BPMs in Feb07 12x BPMs in May07 CAL signal in May07

May 31, 2007 LCWS Hamburg Global Design Effort 7 BPM Hardware Overview BPFLPF INJ CAL Down Mix Digital I/O Cal (~ 714) Timing LO (729) CLK (64.9) TRG Dig. Receiv. Echotek VME µP Motorola 5500 Q I beam Position (EPICS) 4 button BPM pickup IF (15) beam VME BUS CTRL PLL 4 4 VME

May 31, 2007 LCWS Hamburg Global Design Effort 8 Button-style BPM Pickup Button: transfer impedance

May 31, 2007 LCWS Hamburg Global Design Effort 9 Button-style Pickup Characteristic AB CD up down out in Normalized horizontal and vertical potentials: 1D polynomial fit (“on axis” calibration): 2D polynomial fit is prepared, but not yet implemented.

May 31, 2007 LCWS Hamburg Global Design Effort 10 Analog Signal Processing BPF CF: 714 MHz BW: 10 MHz LNA G: 14/-2 dB NF: 1 dB LPF BW: 145 MHz LNA G: 30 dB NF: 2.7 dB SSB Mixer IN 714 MHz OUT MHz LO MHz ch analog downconverter (located in the tunnel): Selective inputs (714 MHz BPF, ~ 100 ns ring-time) Gain switchable, low-noise, high IP3 input gain stage Image rejection (SSB) mixer 15.1 MHz high gain IF stage

May 31, 2007 LCWS Hamburg Global Design Effort 11 Digital Signal Processing Echotek digital receiver: 8-ch VME 64x module Analog Devices 14-bit 105 MS/s AD6645 Each channel: Texas Instruments 4-ch GC4016 “Graychip” digital downconverter 128 kWord FIFO

May 31, 2007 LCWS Hamburg Global Design Effort 12 Digital Signal Processing (cont.) Graychip digital downconverter: 4 independent channels per ADC NCO set to f IF = MHz (downconvert to DC baseband) ADC clock set to 32 samples per revolution: f CLK = 32*f rev = 69.2 MHz Decimation and filtering for the broad- and narrowband operation, using CIC and FIR digital filters Averaging & filtering: 5-stage CIC, dec 4… tab CFIR, dec 2 (or 1) 63-tab PFIR, dec 2 Wideband Mode (BW ~ 1 MHz): total decimation: 8 8-tab running ave. FIRs Narrowband Mode (BW ~ 1 kHz): total decimation: 10988, t dec : µs, 1280 pt (~ 200 ms) 11 & 32-tab RRC FIRs WB mode magnitude response WB CIC response WB FIR response

Other Hardware May 31, 2007 LCWS Hamburg Global Design Effort 13 VME Timing module: –f CLK = f RF *32/330 = MHz clock signals (4x) –t rev = ns turn marker signals (4x), 0…115 double-buckets (2.8 ns) delayable –To f RF phase-locked f LO = MHz –Auxiliary f rev and f IF signals Motorola 5500 VME CPU: –Data collection and normalization –Box-car post-processing filter (20 ms) –Local diagnostic and control software –EPICS control interface Calibration unit (prototype): –To f RF phase-locked f CAL ≈ 714 MHz (Analog Devices ADF4153) –In-passband, through button-BPM calibration –2 nd Graychip channel for downconversion

Project History February 2006 visit: KEK/SLAC : –Proof of principle installation & commissioning –Read-out hardware for 8x button-style BPMs: 4x temporary Echotek boards (older style, no Graychip DDC). 8x downmix modules, plus spares. LO signal generator, cabling, crates, PS, auxiliary systems. February 2007 visit: KEK/SLAC(3)/Fermilab(6) –New installation & commissioning (again 8x BPMs). –6 dedicated, plus parasitic machine shifts (focus on system installation and commissioning). May 2007 visit: KEK/SLAC(3)/Fermilab(6) –Upgrade to 20x BPMs (limited by downmix module availability) in 2x VME crates. –7 dedicated, plus parasitic machine shifts (focus on commissioning and some systematic beam studies). May 31, 2007 LCWS Hamburg Global Design Effort 14

First Results (February 2006) May 31, 2007 LCWS Hamburg Global Design Effort 15 Echoteks Accomplishments: Improved observed resolution (~10 -> ~1 µm) Reduced intensity dependence

(Very) Preliminary Results 2007 May 31, 2007 LCWS Hamburg Global Design Effort 16 Plot range: ±15 µm Plot range: ± 25 µm Plot range: +600/-800 µm Plot range: +800/-600 µm Normalized intensities Scrubbed mode studies: Intensity dependence

Results 2007: BBA (070227, ) May 31, 2007 LCWS Hamburg Global Design Effort 17 Y BBA (um) ET+/-ATF+/- QF2R QF2R QF2R QF2R dETdATF

Results 2007: Broadband TBT Turn-by-Turn data BPM #36 (pinger: On) Identifying hor. and vert. tune lines (387 kHz, Mhz) as well as sync. tune lines (n x 9.7 kHz). Observed short time, broadband TBT resolution: few µm! May 31, 2007 LCWS Hamburg Global Design Effort 18

Results 2007: Narrowband Mode Optimized Narrowband Mode to remove 50Hz –Lengthened the Echotek collection time (160ms shown) –Apply 126 tap box and decimate filter to further average and remove 50Hz –Very strong 50Hz signal in horizontal but also apparent in vertical After filtering see 0.4 µm RMS vert. and 1.7 µm RMS hor. for single shot –Expect electronics to provide same resolution on horizontal and vertical –Suggests orbit motion is contributing to RMS Data being further analyzed using SVD technique –Find correlations which can be related to electronics problems or orbit motion –Need to understand sources of correlations May 31, 2007 LCWS Hamburg Global Design Effort 19

Results 2007: NB Shot-to-Shot Shown is Raw Narrowband Data for 10 shots –Raw data is 160ms from 500k turn for each shot –Each shot was taken 1 minute apart over 10 minutes Observe BPM position change –Need to understand whether the effect is electronics or orbit May 31, 2007 LCWS Hamburg Global Design Effort 20

Results 2007: Single Shot SVD Data filtered by 126 tap box to average and remove 50Hz Observe strong orbit motion in the horizontal plane! Remove the motion to find “real” BPM resolution –400 to 200 nm range (preliminary!) May 31, 2007 LCWS Hamburg Global Design Effort 21

Results 2007: SVD Mode Examples SVD Mode 1 –Clearly shows horizontal orbit motion –Not “BPM physical” May 31, 2007 LCWS Hamburg Global Design Effort 22 SVD Mode 5 –Shows single period in vert. BPM and 3 periods in hor. BPM –Seems to be “real”!

Results 2007: Resolution Limit Theoretical: ADC SNR: 75 dB Process gain: 40.4 dB NF 1 st gain stage: ~ 1 dB CAL tone level: -10 dBm Splitter attenuation: 6 dB Effective gain: ~ 100 dB BPM sensitivity: 240 µm/dB Calculated equivalent resolution: ~ 20 nm May 31, 2007 LCWS Hamburg Global Design Effort 23 CAL tone resolution measurement on BPM #56: ~ 30 nm(!) Single bunch raw ADC data (not a CW signal)

Next Steps… Summer/Fall 2007: –Development on an improved analog front-end downmix&calibration section (production prototype), SLAC/Fermilab collaboration effort Switchable input gain/attenuation IF lowpass/bandpass matched to DDC Nyquist cut-off 4 stage PLL CAL signal generator Fully remote control (I 2 C, etc.) Improved RF enclosure –Various firm- and software improvements, e.g. diagnostic layer via EPICS. –Reliability improvements on hard- and software. –10 (12) channel timing boards May 31, 2007 LCWS Hamburg Global Design Effort 24

Next Steps… (cont.) Fall/Winter 2007: –Testing of the new downmix&cal prototype at ATF –Testing of the new timing generator modules at ATF –Implementation and tests of software improvements Additional EPICS features Time and frequency data Calibration with DDC frequency hopping –Systematic beam studies and analysis. –Test of a turn-by-turn based coupling correction method (?) –Series production of downmix&cal modules Winter/Spring 2008: –Full system upgrade, using Fermilab Echotek spares (loan basis) and the new cownmix&cal modules. –Installation, commissioning and testing. –Expansion of the system to extraction-line BPMs? May 31, 2007 LCWS Hamburg Global Design Effort 25