18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Analogue BPM data analysis Calibration & resolution results.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
The ATF Damping Ring BPM Upgrade - Overview and Status - Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration N. Terunuma, J. Urakawa (KEK)
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Status of the ILC Main Linac BPM R&D Thibaut Lefevre CERN Claire Simon CEA Sacley Sebastien Vilalte LAPP Manfred Wendt Fermilab 11/19/20081ILC08 Main Linac.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration.
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
The ATF Damping Ring Beam Position Monitor System Manfred Wendt Fermilab for the ATF Damping Ring BPM Team.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
ATF/ATF2 Control System
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
CLIC Workshop 2016: Main Beam Cavity BPM
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
ATF2 Mover Software 15 December 2008
Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration
Manfred Wendt Fermilab for the ATF DR BPM Upgrade Collaboration
8-Pack LLRF Status & Schedule
LLRF and Beam-based Longitudinal Feedback Readiness
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Breakout Session SC3 – Undulator
Presentation transcript:

18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel, Nathan Eddy, Dennis Nicklaus, Peter Prieto, Ron Rechenmacher, Duane Voy, Manfred Wendt (FNAL)

18 December Overview Motivation Current Status Preliminary results from this spring Future Plans Motivation – Goal: generation and extraction of a low emittance beam (  y < 2 pm) with the nominal ILC bunch charge – A major tool for low emittance corrections: a high resolution BPM system a broadband turn-by-turn mode (< 10 µm resolution) a narrowband mode with high resolution (~ 100 nm resolution)

Current Status BPMs Feb07 12x BPMs May07 CAL signal May07 54 Mini VME CAL prototype test Dec07 (extra VME crate)

Present Status of the ATF DR BPMs 96 4-button BPM pick-up stations 76 connected to ATF-style read-out systems –Intensity dependent position reading –Resolution > 10 µm –No turn-by-turn (multi-turn) capability (but single turn flash measurement) 20 with Echotek-based read-out systems –High resolution measurements in narrow-band mode ( nm) –Turn-by-turn (4096 turns) and single turn (flash) measurements (resolution ~2-3 µm) –Analog downconverters v1.0, located in the tunnel –Digital signal processing located in 2 VME crates (1x MV5500 CPU, 1x TGF timing, 5x Echotek) (Cont’d)

Status of the ATF DR BPMs (cont’d) 1 Echotek-based read-out system with automatic calibration and remote control functions –integrated calibration system can automatically correct for component aging effects (gain), to stabilize the BPM offset –remote controlled gain/attenuator settings to accommodate multibunch and high current operating modes –remote monitoring of engineering data (supply voltage and current, LO-level, temperature) in the analog downconverter section through the CAN-bus. –Requires an updated downconverter section (SLAC), and a new CAN-bus based calibration and remote control interface (Fermilab), proposed to be installed for the final BPM upgrade at all BPM locations.

18 December Calibration tones produced locally from LO tone, one tone per button, coupled into BPM from Downmix electronics module. BPM Buttons Analog Downmix Electronics VME Echotek Module VME Crate Controller (IOC) Control System Database via EPICS TBT data available via EPICS/MATLAB SLAC FNAL ATF Calibration/contr ol module DAQ mode control moved to ATF control system add diagnostic displays

BPM #54: Downconverter & CAL Proto Mini VME crate accommodating: –Motorola 5500 CPU –PMC CAN bus interface ECAN-2 –Timing module TGF –Echotek digital receiver module BPM #54 prototype installation (temporary): –CAN bus remote control & CAL signal PLL unit (Fermilab) –4 ch. Downconverter unit (SLAC)

18 December Scrubbing Mode, Intensities Normalized Intensities

18 December Scrubbing Mode, Positions um um um

Minimum coverage: 63 BPMs (10 BPMs) (15 BPMs) One BPM per FOBO cell closest to sextupoles every BPM in straight sections Full 96 BPM installation would provide one additional monitor per FOBO cell, and a consistent system

63 or 96 BPMs (10 BPMs) (15 BPMs) VME crates LO distributed from each crate DC fused distribution from each hut

Complete installation Four VME crates, one in each RF hut – 1 IOC, 1 timing module in each 12 Echoteks each for full 96 BPMs, 8 for 63 BPMs ADC, DIO, serial communication in one crate LO and DC distribution –each VME crate (4) to provide an LO source high-power amplifier in each RF hut, split in tunnel between two 8-way splitters (straight and arc) DC source with fused distribution panel in each RF hut, individual supply to each BPM New enclosures –calibration/control module isolated from analog receiver –two 2-channel boards (one full BPM) per enclosure adequate isolation has been demonstrated with boards back-to-back 215 analog receivers, 110 cal/control boards to be produced.

13 Schedule Electronics production, assembly, and testing to be completed by April ’08 –Delivered to ATF for installation in MAY ’08 (concurrent with majority of SLAC’s ATF2 installation efforts) –Beam commissioning of full system before shut down in June ‘08 13

14 Original Schedule

15 More likely schedule...