I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on and ends on Coordinator and management team : GSI Scientific manager : A. Mueller (IN2P3) Project coordination committee (PCC) comprises one representative from each activity 1 st PCC meeting held at Funchal (Madeira) on 7./ General assembly (GA) comprises one representative from each institution 1 st GA planned for September 2005 Status report of the AGATA joint research activity EURONS : Integrated Infrastructure Initiative (I3) for Nuclear Structure 45 contractors and 33 other institutions from 27 countries 27 activities: 8 Trans-National Access (TNA) to research infrastructures, 9 Joint Research Activities (JRAs), e.g. AGATA, 8 Networking activities
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Presentation of all activities Activity information sheet (AIP) reporting every 6 months Monitoring the progress of the project (milestones & deliverables) Preparation of the (annual) reports (management & activity) Discussion of management organization, payments etc. Executive board of the PCC was elected (3x2 members + manager) Advance payment from GSI in early March : 2/3 of request for the first 18 months’ period Yearly payments after submission of each annual report Audit certificate needed from each contractor every 2 years check with your local administration Consortium agreement (CA) distributed to all institutions Comments by the end of February Signatures needed by March 31st, 2005 “Late comers” will accede to the contract Minutes of the first PCC meeting
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Objectives: Development, construction, commissioning and evaluation of the first modules for an advanced gamma ray tracking array (AGATA) including digital front-end electronics and a data acquisition system capable of handling the gamma-ray tracking procedure Description of work: Task T-J02-1: General Tasks Subtask T-J02-1.1: Conceptual design Subtask T-J02-1.2: Subsystem commissioning Subtask T-J02-1.3: Prototype commissioning Task T-J02-2: Detector module and infrastructure Subtask T-J02-2.1: Characterization Subtask T-J02-2.2: Assembly Subtask T-J02-2.3: Tests Task T-J02-3: Local Level Processing system Subtask T-J02-3.1: Electronics Subtask T-J02-3.2: Pulse-shape analysis Subtask T-J02-3.2: PSA evaluation Task-T_J02-4: Global Level Processing system Subtask T-J02-4.1: Trigger and system integration Subtask T-J02-4.2: Gamma-ray tracking Subtask T-J02-4.3: DAQ Task-T_J02-5: MC simulation and data analysis Subtask T-J02-5.1: Physics emulator Subtask T-J02-5.2: Data bases Subtask T-J02-5.3: Analysis routines AGATA JRA : Objectives and Tasks
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Task Nr Task nameGeneral TasksDetector module & Infrastructure Local Level Processing Global Level Processing MC Simulations & Data Analysis 1 st sub-taskConceptual design of the full AGATA array INFN Padua Characterisation of asymmetrically shaped 36- fold segmented Ge detectors Univ. Liverpool Prototype electronics for analogue and digital signal processing CCLRC Daresbury Global trigger, synchronisation and integration of ancillary detectors INFN Padua Conceptual array design and Monte- Carlo simulations incl. ancillary detectors INFN Legnaro 2 nd sub-taskCommissioning of all sub-systems Task leaders Cryostat and pre-amplifier developments, detector module assembly and acceptance test Univ. Köln Pulse-shape analysis (PSA) algorithms TU München Gamma-ray tracking (GRT) algorithms CSNSM Orsay Databases for event data storage IPN Lyon 3 rd sub-taskCommissioning of the full AGATA prototype system Project leader Test benches and infra structure for “in-beam” tests, incl. ancillary detectors IReS Strasbourg Simulation of detector signals and comparison with experimental data CEA Saclay Data acquisition, and storage, run control, graphical users interface IPN Orsay Generic data analysis routines Uppsala Univ. Tasks and Responsibilities
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Milestones : Short titleDate due Date accomp. Remarks/ lead participants M-J02-1.1Conceptual design of the full array finalised06/05INFN-Padua M-J02-1.2AGATA demonstrator sub-systems commissioned12/07Task leaders M-J02-1.3Final report delivered to managing institution12/08Project leader M-J02-2.1Asymmetric Ge detector prototype characterized06/06U-Liverpool M-J02-2.2AGATA prototype triple-cluster module assembled12/06U-Köln M-J02-2.3Infrastructure for in-beam tests commissioned12/07IN 2 P 3 -IReS M-J02-3.1Prototype local level processing electronics delivered12/05CCLRC M-J02-3.2Pulse-shape analysis algorithms optimised06/06TUM/IPNO M-J02-3.3Pulse-shape analysis performance evaluated06/07CEA-DSM M-J02-4.1Prototypes for data acquisition hardware delivered12/05INFN-Padua M-J02-4.2Gamma-ray tracking algorithms optimised06/06IN 2 P 3 -CSNSM M-J02-4.3Data acquisition system commissioned06/07IN 2 P 3 -IPNO M-J02-5.1Physics emulator integrated in MC simulations12/05INFN-Legnaro M-J02-5.2Event data base storage commissioned12/06IN 2 P 3 -IPNL M-J02-5.3Analysis routines for event data commissioned12/07U-Uppsala [i] [i] For every subtask there must be one milestone (there might be more than one if necessary) [ii] [ii] Month at the end of which the deliverable will be available. Month 1 = January All delivery dates are relative to this start of the project. Milestones
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Deliverables:Short titleLead contractor Date due 5 Date deliver ed Type [ii] [ii] Disseminat ion level [iii] [iii] Remarks : D-J08-1.1Delivery of the full AGATA prototype system CCLRC12/07R/PUProject leader D-J08-1.2Final evaluation report on the full prototype system commissioning CEA-DSM12/08R/PUJRA coordinator D-J08-2.1Delivery of prototype triple-cluster module U-Köln12/06P/PU D-J08-2.2Report on the characterisation of the detector module U-Liverpool12/08R/PU D-J08-3.1Delivery of prototypes of digital signal processing electronics IN2P306/06P/PU D-J08-3.2Report on local level processing system and pulse shape analysis IN2P3/TUM12/08R/PU D-J08-4.1Delivery of prototypes of specific data acquisition hardware INFN06/06P/PU D-J08-4.2Report on global level processing system and gamma-ray tracking IN2P3/INFN12/08R/PU D-J08-5.1Report on MC simulations and data analysis routines U-Uppsala12/08R/PU Deliverables and lead contractors
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 AGATA JRA participant (Nr. & short name) PersonnelNetworkingOverheadsTotal EU First 18 months 28. CEA Saclay GSI Darmstadt GANIL Caen Univ. Jyväskylä INFN Legnaro INFN Milano INFN Padova Univ. Sofia Univ. zu Köln TU München NBI Copenhagen CNRS/IN2P Istanbul University Univ. Warsaw NIPNE Bucharest KTH Stockholm Uppsala Univ CCLRC Daresbury Univ. Liverpool Univ. York Project Coordination (CEA-Saclay) TOTAL Finances and first payment
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Participant No. 28 (Coord.) Participant short name CEA/ DSM Saclay GSI GANIL JYU INFN U-Sofia U-Köln TUM UKBH Personnel/PM EUPIEUPIEUPIEUPI EUEU EUPIEUPIEUPIEUPI 48 months presently spent next 18 months Personnel / k€ 48 months presently spent next 18 months Other / k€ 48 months presently spent next 18 months Sum / k€ 48 months Presently spent next 18 months Activity information sheet
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Participant No Participant short name IN2P3 U-Istanbul U-Warsaw NIPNE KTH U-Uppsala CCLRC U- Liverpool U-York Personnel/PM EUPIEUPIEUPIEUPIEUPIEUPIEUPI EU PI EUPI 48 months presently spent next 18 months Personnel / k€ 48 months presently spent next 18 months Other / k€ 48 months presently spent next 18 months Sum / k€ 48 months presently spent next 18 months Activity information sheet (cont.)
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Proposed Lines of Action (major role for RI) Continue and improve the current line of action on RI Reinforce RI action adding new line for development of new ‘unique’ RI Vision. Roadmap for RI in Europe in the next years. The Roadmap can have periodic updates and revisions. Criteria for priority projects in Roadmap : Pan-European interest; potential impact on ERA; Size (>50M€); maturity of the project and timeliness; Existence of multi-annual and long-term budgetary planning, Quality of management. AGATA has good chances to become a priority RI project Research Infrastructures in FP7 (as seen by the EC)
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Nuclear Physics community should submit one I3, instead of I3HP and I3EURONS; but NuPECC is open for suggestions. A committee should be formed soon to look into the various issues and ‘new’ criteria connected with I3 applications in FP7. New design studies and new construction projects should be inventorised. Current priorities for construction: FAIR and SPIRAL-2 Other installations such as a “High-intensity stable beam facility” and other initiatives will be discussed later (according to M. Harakeh) The AGATA collaboration must start defending its interests Research Infrastructures in FP7 (as seen by NuPECC)