South Fork improvements program – a mid-program report

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Anchorage Regional Landfill Landfill Gas-to-Energy Project
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Steve White Urban Water Council US Conference of Mayors
1 Collection System And Wastewater Treatment Plant Sewer Update
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
Wastewater Treatment & Collection System Improvements.
A Review of State-of-the-Practice Equipment at the Plum Creek WWTP By Tim Grotheer Plum Creek Wastewater Authority & Dave Oerke RTW Professional Engineers.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
NC AWWA-WEA 93rd Annual Conference November 12, 2013 Tim Woody Resource Recovery Division Director, City of Raleigh Jonathan Treadway P.E, BCEE, CDM Smith.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Project History Town of Newport Population: 550 Vermillion County Seat.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
NC Water Resources Congress Annual Meeting Raleigh, NC October 30, 2014 State Water Infrastructure Update: The State of NC and Water, Wastewater and Stormwater.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
November 17, 2015 NC AWWA-WEA Annual conference
Implementing an Adaptive Capital Improvement Program
NC AWWA-WEA 95th Annual Conference
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Update on RCR Permitting
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
OPERATIONAL OPTIMIZATION 2013 KY/TN WEA Management Conference M. Shannon Lambert, P.E. PRESENTED BY:
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Progress Briefing - Energy Initiative
CITY OF HALLANDALE BEACH
NC AWWA-WEA 97th Annual Conference
Recycled Water Project – Sharon Heights GCC
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
Water Department has Six Divisions
An Innovative Approach for Increasing Lift Station Pumping Capacity
Wastewater Facilities Upgrade Project
Facilities Plan Update
Brackish Water Desalination Project
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Richland Creek Water Supply Program Program Update
The Project Overview and Status Report
Presentation transcript:

South Fork improvements program – a mid-program report NC AWWA-WEA 95th Annual Conference Template Revised 13 January 2012 South Fork improvements program – a mid-program report Kent A. Lackey, P.E. – Black & Veatch Project Manager

AGENDA Background Program Overview Program status Early successes

Background – Wastewater system Winston-Salem/Forsyth County Utility Commission Approximately 122,000 customers (3rd largest in NC) 2 WWTPS Muddy Creek 21 mgd capacity Archie Elledge 30 mgd capacity Three Drainage Basins South Fork Elledge 49 WW Lift Stations 1,723 miles of sewer Archie Elledge WWTP Muddy Creek WWTP

Background – long term wastewater treatment analysis Archie Elledge WWTP Muddy Creek WWTP Muddy Creek Basin South Fork Basin Elledge Basin South Fork PS New MC Transfer PS Where is it being generated? Convey all flows to plants using existing infrastructure Transfer flows between plants Transfer flows between basins System Equalization Scalping within the collection system Future New Plant introductions Future Plant Option 1 Future Plant Option 1

South fork improvements program program partners Program Owner : CCUC Program Consultants: Utilities Administration Hazen and Sawyer: Interceptor Design/EA Wastewater Treatment Highfill Infrastructure: Kerner’s Mill Design Collection & Maintenance Finance Southeastern Electrical Consultants: Kerner’s Mill PS Design City Attorney Program Manager: Black & Veatch Carolina Ecosystems: Environmental Field Support Program Management Hydromax USA: Pipeline Inspection MCCIPS and Force Main Design Allied Associates: Surveying Optimization Study/Design Sanborn: Aerial Topography Funding Assistance S&ME: Geotechnical Regulatory Permitting Clemson Engineering Hydraulics: Physical Modeling

South fork improvements program overview 26 December 2012 South fork improvements program overview Kerner’s Mill PS and Force Main Design Lead: Highfill Linville Springs & Wexford PS Design Lead: CCUC MCCIPS and Force Main AEWWTP Equalization Facilities AEWWTP Aeration Upgrades(New) MCWWTP Power Generation Upgrades(New) Design Lead: Black & Veatch South Fork Interceptors Design Lead: Hazen and Sawyer SSES Projects Design Lead: Several PowerPoint Sample

General program status project update – Optimization Study 26 December 2012 General program status project update – Optimization Study Study Completed in 2013-2014 Aeration/DO Evaluation Gas Utilization Evaluation Sidestream Treatment Evaluation for N and P Chlorine Control Performance Management System Energy Management Via Ammonia Control Interplant Pumping Control System Result: AEWWTP Aeration Upgrade and Power Generation Projects Initiated PowerPoint Sample

South Fork Program projects Additional Program Projects Process and Energy Optimization Study for AEWWTP and MCWWTP Program Funding Program Funding Application and Administration for State Revolving Fund Loan Federal Funding Screening and Application for all 2014 CIP projects Other Projects Added to the Program AEWWTP Equalization Facilities AEWWTP Aeration Improvements MCWWTP Power Generation Upgrades MCWWTP Blower Upgrades Funding

Program financial update program budget - construction 26 December 2012 Program financial update program budget - construction Current Anticipated Program Construction Cost: $98,320,000 MCWWTP CIPI: $51,060,000 MCWWTP Transfer Force Main: $4,850,000 AEWWTP Day Tanks: $9,000,000 AEWWTP Aeration System: $4,700,000 South Fork Interceptor Contract 1: $12,550,000 South Fork Interceptor Contract 2: $5,360,000 (estimated) Kerner’s Mill Force Main: $3,200,000 (estimated) Kerner’s Mill Pump Station Upgrade: $1,600,000 (estimated) MCWWTP Power Generation: $6,000,000 (estimated) Program is currently approximately $8M under budget PowerPoint Sample

General financial update program funding 26 December 2012 General financial update program funding SRF CS370399-08 $70,500,000 Loan Granted (2% rate) Funds MCCIPS, Force Main, AEWWTP Equalization SRF CS370399-09 $9,399,200 Loan Granted (2% rate) Funds SSES Projects: Peters Creek, 21st Street, Ardmore Basin No. 1 SRF CS370399-10 $1,079,400 Loan Granted (0% rate) Funds AEWWTP Aeration System Upgrade SRF CS370399-11 $6,003,772 Loan Granted (0% rate) Funds MCWWTP Power Generation Facilities Future Application MCWWTP Blower Replacement South Fork Interceptors PowerPoint Sample

program schedule update 26 December 2012 program schedule update Project Design Completion Construction Start Final Completion MCCIPS Complete 1/28/15 5/31/17 MCCIPS Force Main 6/15/15 8/16/16 AEWWTP Equalization System 6/25/15 11/17/16 AEWWTP Aeration Upgrades 9/1/15 5/27/16 MCWWTP Power Generation 10/31/15 2/2016 2/2017 Kerner’s Mill Force Main 1/2016 8/2016 Kerner’s Mill Pump Station Upgrade 2/2018 South Fork Interceptor Contract 1 7/15/15 12/16/16 South Fork Interceptor Contract 2 11/2015 11/2016 Red text indicates projects currently in construction PowerPoint Sample

General program status project update - MCCIPS 26 December 2012 General program status project update - MCCIPS Muddy Creek WWTP Consolidated Influent Pumping Station 82 mgd Influent PS Expandable to 138 mgd Screening/Grit Removal 9.5 mgd Transfer PS & 30” Force Main Expandable to 30 mgd Odor Control 2 - 1 MG Day Tanks 2 – 3.9 MG Storm EQ Basins Electrical Switchgear Replacement NPW Pump Replacement Demolition of Exist Primary Treatment and Influent PS Ferric Chloride Storage/Feed PowerPoint Sample

General program status project update - MCCIPS 26 December 2012 General program status project update - MCCIPS PowerPoint Sample

General program status project update – AEWWTP 26 December 2012 General program status project update – AEWWTP Elledge WWTP Equalization Objective: Combine AEWWTP and MCWWTP Flows and Equalize Diurnal Variation 2 – 2.0 MG Day Tanks w/ Vertical Mixers Rate Control Structure Elledge Aeration Upgrades Segment Aeration Basins into 4 independent DO Control Zones Results: Reduce air requirements by 7,300 scfm Approximate Power Savings: $186,000/yr Approximate 3-4 yr payback PowerPoint Sample

General program status project update – MCWWTP Power Generation 26 December 2012 General program status project update – MCWWTP Power Generation MCWWTP Power Generation 1 - 1.1 MW Dual Fuel Engine Generator Self Enclosed Outdoor Unit 800kW Capacity on Digester Gas 1.1 MW Emergency Capacity on Natural Gas Power Supplied to Grid Digester Gas Cleaning: particulates, moisture, H2S Compressor via Blowers Waste Heat Hot Water for Digester Heating Approximately 8 yr payback PowerPoint Sample

General program status project update – Interceptors 26 December 2012 General program status project update – Interceptors Contract 1 23,900 LF of 54” pipe Pipe Material: FRP with DIP at road crossings Contract 2 8,860 LF of 15-42” pipe Pipe Material: FRP (42”), DIP (42”), Clay (15”/18”) PowerPoint Sample

South fork program early successes Pumping System Final Capacity Refined at 30% Design Reduced due to Muddy Creek Basin Master Plan and South Fork Basin Refinement Reduce PS Cost and Deferred Initial Equipment (Approx. $1M) No Impact to Aggressive Schedule for South Fork Basin Improvements Basin 5 yr Storm Peak Flow (mgd) Initial 2041 Flows Final 2041 Flows Muddy Creek Basin 110(Assume 3.4 PF) 92.9 South Fork Basin 40 35.6 Davidson County 1.5 10.0 Total 171 138.5

South fork program early successes Two significant Program Interceptor Projects were Deferred ($11M) South Fork Basin MP Re-calibration Efforts Completed and Assessed Before Detailed Design Commenced Reduced Program Construction and Engineering Cost No Impact to Aggressive Schedule for South Fork Basin Improvements Projects Deferred Program Manager was Able to Make Effective, Ongoing Decisions Based on Collective Information

Consolidated industrial allocation tracking Archie Elledge WWTP This figure provide a nice snapshot of how the overall system will be configured There is approx 4.6miles between plants with a elevation difference of less than 20 feet Three outfalls lead to the AEWWTP and are pumped into the plant by the IPS Two outfalls lead to the MCWWTP and are either pumped into the plant or transferred to the AEWWTP via a 30” force main They have the ability to measure flow from the various outfalls and will also have the ability to measure COD/TOD load into the plants. Muddy Creek WWTP Transfer Force Main 19

South fork program early successes The Program Team is Driving Effective and Open Collaboration Multiple Projects MCWWTP Clarifier Improvements Project Collection System Master Plan Project South Fork Program Multiple Engineering Firms Provide Collective Decision Making Winston-Salem Black & Veatch Hazen & Sawyer Highfill Infrastructure Engineering Winston-Salem is Benefiting from Collective Expertise and Effective Collaboration

South fork program early successes Benefiting from Effective Collaboration Exchanged Scope Between MCWWTP Clarifier Improvements Project and Program Project Deferred Sitework to Program; Moved Clarifier Splitter Structure to Clarifier Project Evaluating and Coordinating Project Sequencing Interceptor Designers Considered “Replace in-place” concept to avoid considerable rock removal along alignment Program Manager Evaluated Interceptor Sections and Impact on MCWWTP Flows Evaluated Early Milestones in PS Project to Incorporate Higher Influent Flows to Allow full “replace in-place” Without Delay to Program Completion

South fork program early successes Significant Benefits in Bidding and Construction Significant Contractor interest including in some cases 15 bidders for a project. Consolidated and coordinated construction administration efforts Consolidated database for construction documents and records to keep things organized for CCUC

conclusions Unique Program Management Approach Has Created Value for CCUC Allows for Expediting Relief of South Fork Basin While Concurrent Projects are Completed Allowed to Initiate Projects without “Final” design criteria in order to Expedite Completion Consolidated “like” Efforts Increasing Efficiency and Reducing Cost Greatly Reduced CCUC Staff Requirements for a Complex set of Projects Single Point of Responsibility with a High Level of Collaboration Between Team Members – Increasing Quality and Value.