A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Status and plan for X-band high field experiments at KEK US High Gradient Collaboration Workshop University of Maryland Jan , 2008 KEK T. Higo.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
High gradient features from Nextef on recent CLIC prototype structures US-HG workshop, SLAC 9 February 2011 T. Higo representing X-band group of KEK.
Experimental breakdown studies – breakdown diagnostics Linking simulation and experiment Jan W. Kovermann, CERN, RWTH Aachen SLAC workshop July 2009.
Dark current measurement at KEK M. Gerbaux, S. Döbert, T. Higo, S. Matsumoto, K. Yokoyama.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Design of Standing-Wave Accelerator Structure
RF BD statistics in the TD26CC accelerating structure J. Giner-Navarro 18/11/2014 CLIC Breakdown meeting 118/11/2014J. Giner-Navarro.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
J. Haimson and B. Mecklenburg Haimson Research Corporation FG02-05ER84362 Work performed under the auspices of the U.S. Department of Energy SBIR Grant.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
High Power Test of Mizuno - Ohtsuka Dry Load S. Matsumoto and T. Higo Report made on
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
W. Wuensch CLIC project meeting High-power rf structure testing.
ON/OFF news. Reflected Transmitted Stroke 8.0 mm RF power, dB Piston position (gap width), mm ON OFF Compact design of the high RF power variable (mechanically)
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Comparison of breakdown behavior between klystron and beam driven structure W. Farabolini With the support of J. Kovermann, B. Woolley, J. Tagg 1HG2013.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Discussion on critical issues for testing: breakdown identification, preparation for test, processing protocol, etc. 4 th Annual X-band Structure Collaboration.
Some information from Nextef For poster session in IWLC T. Higo.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Test Accelerating Structures Designs, Objectives and Critical Issues
High power test results of X-band deflecting cavity
KEK Status and plans of structure production and testing
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Breakdown meeting Noora-Mari Pienimäki
Shuji Matsumoto Accelerator Lab., KEK
Recent high-gradient testing results from the CLIC XBoxes
High Gradient tests at the KEK Nextef Facility
A Study of RF breakdown of Narrow Wave Guide
Status of KEK X-band Test Facility and its future plans
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Presentation transcript:

A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009

2016/1/4SLAC Workshop 8-10 July Design of the Narrow Waveguide Type of Cu002 WR90 (the height and the width are reduced) a=22.86→14mm b=10.16→1mm VSWR 1.05 (HFSS)  Material Test Cu, SUS, Mo, Ti, Cr, etc. K.Yokoyama, T.Higo, N. Kudoh

~ 50MW PPM Klystron K.Yokoyama, T.Higo, N. Kudoh Modulator High Power Dummy Load 5mm thick Lead Shield Box Narrow Waveguide Test 50MW test station 2016/1/43SLAC Workshop 8-10 July 2009

BDR Measurement Keep both the power and the pulse width to be the specified values(“target”)for 24Hr. If a breakdown event happens, wait until the vacuum being normal and ramp up to the target. (power goes up and down while the pulse width monotonically increases. See below.) The ramping process may be suspended or cancelled if the vacuum becomes bad. Typical example of variations in pulse width and RF power. Pulse width: blue line Power : red line 2016/1/44SLAC Workshop 8-10 July 2009

BDR Every data point represents the result of the 24Hr run, under fixed power and pulse width (=target). In the experiment, we follow the way of ramping to get to the target. Collect the time spans from the target being set and the BD event takes place. BDR = # of BDs / summation of the time spans. 2016/1/45SLAC Workshop 8-10 July 2009

The high power test of Copper –Made NWG (CU005) has finished. Breakdown rate has been obtained for all data set. K. Yokoyama Copper (2009) Stainless Steel (2008) The gradient reached with stainless-steel waveguide was much higher than the copper one. Comparing the two materials at a BDR of level, the gradient of stainless-steel is much higher (more than 100 MV/m) than that of copper (only 60~80 MV/m). 2016/1/46SLAC Workshop 8-10 July 2009

Two things we are looking at. 1) BD location in time within RF pulse. How does it distribute? 2) Does BDR look as the random process? Let us see the distribution of the time spans of all BD events. 2016/1/47SLAC Workshop 8-10 July 2009

Breakdown timing within RF pulse Tek DPO Oscilloscope records all RF waveforms (forward and backward, ten pulses prior to the BD pulse). Measure the time of RF reflection begins. 2016/1/48SLAC Workshop 8-10 July 2009

The result comes out here. (Numbers are dumped in a file) S.Ushimoto Program to measure the timing: Compare the breakdown pulse and the previous pulse, set the cursor at the BD location (=reflection). 2016/1/49SLAC Workshop 8-10 July 2009

RUN01 : 86.9MV/m, R= 66/5.2Hr = 7.07e-5 RUN03 : 81.6MV/m, R= 132/4.0Hr = 13.9e-5 RUN06 : 74.8MV/m, R= 25/23.3Hr = 0.86e-5 Analysis of 400ns pulse width data, histogram of the BD locations 2016/1/410SLAC Workshop 8-10 July 2009

RUN16 : 78.9MV/m, R= 105/15.3Hr = 3.81e-5 RUN17 : 85.9MV/m, R= 167/4.7Hr = 19.9e-5 Other 400ns pulse width data also shows the same behavior. 2016/1/411SLAC Workshop 8-10 July 2009

88.4MV/m, BDR=3.55e MV/m, BDR=42.5e-6 Example of 200ns pulse width data Still we see the same behavior 2016/1/412SLAC Workshop 8-10 July 2009

Discussion NWG Breakdown does not occur uniformly in time within RF pulse. Breakdowns look “suppressed” at the beginning (should be confirmed.) Rise time of the RF power may have the influence, but it does not seem to explain this behavior (should be confirmed). 2016/1/413SLAC Workshop 8-10 July 2009

Time duration from the target on to BD 200ns, 80.9MV/m. 35events/ 24Hr. Each BD is numbered. Sorted 2016/1/414SLAC Workshop 8-10 July 2009

Compare to the simple decay curve Shorter Life Longer Life Population survived 2016/1/415SLAC Workshop 8-10 July 2009

Things to be done These analysis is ongoing. Continue them for all data available. Analysis of the signals of acoustic sensors. Analysis of X-ray detectors. 2016/1/416SLAC Workshop 8-10 July 2009