Plans for HV R&D at LANL Vacuum chamber Supply cryostat Josh Long, Indiana U. Tests in progress Control purity, contaminants, attempt T < 1.8 K Near Future.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Chapter 25. Capacitance What is Physics? Capacitance
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
High Voltage Studies, 10/06 – 02/07 J. Long, Indiana University System Modifications Conditioning tests Amplification, leakage current (preliminary) Future.
Patricia Aguar Bartolomé Institut für Kernphysik, Universität Mainz PSTP 2013 Workshop, Charlottesville 11th September 2013.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
High voltage test system update Summary of 2005 results Results from March, May 2006 Possible remaining R&D projects Polished electrodes, clean(er) LHe.
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
LIQUIDS AS INSULATORS Liquid dielectrics are used mainly as impregnants in high voltage cables and capacitors, and for filling up of transformers, circuit.
Vacuum Technology Part II of the “What exactly do we have down there?” series.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
FCI1 CHAPTER OUTLINE 1. Definition of Capacitance 2. Calculating Capacitance 3. Combinations of Capacitors 4. Energy Stored in a Charged Capacitor.
Solar Cell conductive grid and back contact
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Studies of Voltage Breakdown in Superfluid 4 He May 20, 2008 Maciej Karcz, Craig Huffer, Young Jin Kim, Chen-Yu Liu, Josh Long May 20, 2008 Maciej Karcz,
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
What is plasma? Plasma is an ionized gas comprising molecules,atoms, ions ( in their ground or excited states) electrons and photons. It is electrically.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Results from the HV Test System Review of current design and assembly J. Long, P. Barnes, J. Boissevain, J. Gomez, S. Lamoreaux, D. Mischke, S. Penttila.
Preliminary HV Results in Superfluid Helium Review of HV system design J. Long, J. Boissevain, J. Gomez, S. Lamoreaux, S. Penttila LANL Amplification and.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
EDM Collaboration Meeting, February 14-15, 2007 Valve Bucket-Dewar Tests Steve Williamson UIUC.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
Preliminary Design for the Coupling Coil Cryostat in MICE
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1.3GHz Input Coupler for ILC
High Voltage Test System Results, 03-04/07 J. Long, Indiana University System Overview and Modifications Readout system Breakdown tests of acrylic System.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Dielectric Strength of Superfluid Helium Under Pressure Small Pressure-Controlled Cryostat Overview Measurement Cycle Possible Breakdown Mechanisms Dielectric.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
Transport of 3 He by heat flush measurement of 3 He concentration tests of heat flush George Seidel Brown University.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
R&D Plan on Light Collection Takeyasu Ito Los Alamos National Laboratory.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
HV Feedthrough Tests for the LBNE Meeting Status of R&D 6/26/2016HV Feed for BNL Meeting1 Hans Jostlein.
CLAS12 Longitudinally Polarized Target R&D Update CLAS Collaboration, October 20, 2015 Chris Keith.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Specifications for the Integrated Tests II Paul Huffman.
Vacuum Systems for Electron Microscopy Constraints on Specimens Specimens placed in the electron microscope must be able to withstand very high vacuum.
Final Design Cryogenic and mechanical configurations
Installation of the T600 at Fermilab
T5.2: Harmonization - Material and Component Reference
Nathaniel Garceau, Wei Guo, Thomas Dodamead
Capacitance and Dielectrics
First tests on the roll-formed field cage.
LARP Vertical Test Facility
CRYOGENICS OPERATIONS 2008 Organized by CERN
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
General Physics (PHY 2140) Lecture 6 Electrostatics
Presentation transcript:

Plans for HV R&D at LANL Vacuum chamber Supply cryostat Josh Long, Indiana U. Tests in progress Control purity, contaminants, attempt T < 1.8 K Near Future Breakdown studies of test cell materials 2007 Large-volume HV studies at DR temperatures, high pressure

Previous results from prototype system Maximum leakage currents under these conditions (95% C. L.) : SF (2.07 K): 733 pA Normal State (3.98 K): 169 pA Short-duration breakdown not affected by neutron radiation (10 6 /s, ~MeV) Small commercial HV feedthrough exceeded maximum rating in air (40 kV) by 25% when immersed in SF Maximum potentials sustained: 11.8 liters Normal State (4.38 K), 7.2 cm gap: (96 ± 7) kV/cm 12.8 liters SF at 2.14 K, 7.8 cm gap: (31 ± 3) kV/cm Pressure effects common in literature, e.g.: LHe breakdown at 2 K (at 100  m gap) : 500 kV/cm (25 torr), 800 kV/ cm (700 torr) [Suehiro, et al., 12 th Intl. Conf. Conduction and Breakdown in Dielectric Liq., Rome, 1996, 320.] Possible further degradation below 1.9 K Bubble formation (common breakdown culprit) observed when charging above 10 kV, likely coincident with noise

Better performance (wide T, P range) without pressurizing? Reduced surface roughness (64  -inch to 16  -inch) Expect ~2x improvement in breakdown [Gerhold, IEEE Trans. on Dielec. and Elec. Insul., 1 (1994) ] No observed improvement at 1.9 K or 4 K Results uncertain due to excessive contamination (oil, air backstreaming from pump) Attempt to improve purity of LHe and reduce surface contaminants Principal concerns (from literature): Hydrocarbons LHe contaminated with oil “useless” as insulator [Gerhold, Cryogenics (October 1972) 370] Conducting contaminants Oxygen Existing (“accidental”) observations 4 K breakdown strength unchanged after many hours pumping with oil pump Small gap breakdown at 2 K and 4 K unchanged after backstreaming event Unchanged after frozen contaminants left to evaporate and system replenished with LHe passed through 10 mm pore filter

Current tests in progress Control purity and surface contaminants systematically Complete solvent cleaning of interior RF Plasma discharge cleaner (for Hydrocarbons) Dry pumps only for all applications No LN2 pre-cooling: attempt using cold, filtered He gas from LHe supply dewar (can filter LN2 if not practical) LN2 trap on LHe bath pumping line LHe (and gas) filter on transfer line outlet Charcoal + low porosity materials, Quantum Technologies RGA monitoring Further reduced surface roughness Electrodes polished to ~ 8  -inch finish

Current tests in progress Attempt operation below 1.8K Colder LHe transfers New transfer line operates with HV system below lambda point Heat load reductions (also important for eventual operation with DR): Tie central volume lateral support posts to 77 K Tie supply cryostat upper neck to 77 K shield Remove all unnecessary (conducting) instrumentation from supply cryostat upper neck Cover open viewport holes in 77 K shield with quartz windows Tie actuator rods to 77 K shield Previous heat load2 W 1 W 0.5 W 0.1 W 0.02 W Other Video monitoring of gap Improved level sensing

R&D questions (initial test) Breakdown study of test cell materials Assess if low breakdown strength Modify system as little as possible to compare to established baseline (initial test) Acrylic: breakdown strength = 200 kV/cm in air at 300 K Note: G-10 standoffs = 400 kV/cm Assess if high leakage current (especially across straight, smooth surface) Use existing HV test system Later phase: refine test cells to reflect final geometry, coatings (or as necessary to attain higher breakdown if problems) Plan/ technical assumptions

~65% of field in maximum HV- Ground gap Good uniformity Single 14 x 9 x 2 cm piece (rounded edges) Equidistant between standoffs (back view): Breakdown study of test cell materials (ignoring G10 standoffs [  ~ 5]) Possible phase II: add 5 more at different angular positions to match edge length of actual cell (120 cm) electrode standoff

Breakdown study of test cell materials Complications: Acrylic thermal expansion ~.02 from K (?) Cell shrinks 2 mm relative to 14 cm G-10 standoffs -> Spring-loaded base to attach to isolation plate (?) Cell shrinks 0.5 mm relative to adjacent points on electrode -> Issues for mounting in recesses: electrode cell

Breakdown study of test cell materials

R&D questions HV tests in upper cryostat prototype What happens to breakdown strength and leakage currents in large LHe volumes/electrode gaps at 500 mK? System should be dis-mountable within ~ 1 week to run w/o DR if necessary Couple existing HV test system to DR via dedicated insert in upper cryostat prototype Plan/ technical assumptions No interference with injection/relaxation insert (though separate experiments will have to run in series) Heat loads in existing test system can be controlled How much improvement can be attained with pressurized LHe (~1 atm) at these temperatures? Incorporate best candidate materials for electrodes and cell prototypes Address remaining questions about purity by condensing LHe from filtered gas (if time)

Pump and flush HV volume Backfill with P > 1atm He gas Pre-cool with LN2 through coiled line Flush coiled line Pre-cool to 4.2 K with cold He/ LHe through coiled line Evacuate and seal coiled line Open LHe valve to fill HV volume from LHe supply Close LHe valve OPTION: Pressurize LHe volume with He gas to P ~ 1.4 atm Push down plastic heat stopper Engage thermal link(s) to DR Cool to 1.5 K (0.5 K) Design from D. Haase, 8/06

Significant design work remaining Operation contingent on reducing heat loads in HV volume DR ~ mK (?) Current HV system heat load: 2W Target: < 1 W Additional coiled pre-cooling line around copper shield possible (10 K?) Heat load through SI: ~ 0.5 W

~20”Revised Spool Modified Adapter Proposed location for HV 1K frig Location for future purifier Procurement begun for adaptor parts

HV tests with DR (guesses; independent of cell tests) Subsequent tests (pressurization, new electrodes, etc: 3-4 weeks each with dedicated use of DR ~ 2x as long to assemble (Summer 2007) if no work in parallel with cell tests ?

R&D questions Other HV issues Possible in principle via Kerr effect (accuracy? Effect of acrylic?) Either can be incorporated whether or not system coupled to DR Plan/ technical assumptions Can we assess field uniformity in test system? Will need additional windows for scanning large regions of gap or scanning behind HV electrode (Kerr) Can we bring 350 kV directly into system?

Figure: Karamath, Lepton Moments conference (2006) Can already bring 50 kV into present LANL test system at 1.9 K (1.5 < gap < 8) cm

Electrical breakdown in a full cell an extensive literature deriving from interest in insulating high power superconducting apparatus suggested possibilities 1) impurities 2) motion of individual electrons – localized or delocalized 3) field emission field emission from the cathode is the most likely possibility based on what is known about helium highly localized dissipation of energy by electrons creates hot spot liquid vaporizes, creates macroscopic bubble; avalanche and breakdown ensues FROM G. SEIDEL, LANL, 9/27/06 (NOT PRESENTED)

stainless can aluminum plate wire seal flange G-10 standoff HV plunger control rod Indium seal ceramic standoff HV electrodeground electrode ground control rod Vacuum-LHe HV feedthrough bearings bellows 0.53 m quartz window High voltage system prototype at LANL Vacuum chamber Supply cryostat HV feedthrough Actuator Test proposed amplification method Measure breakdown properties of large volumes of LHe Existing data: 150 kV/cm at 4 K, 1cm gap LHe bath pumping line