API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Section 305 Technical Subcommittee Chicago IL June 22 nd 2011.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
1 United States Patent and Trademark Office Revised PCT International Search and Preliminary Examination Guidelines Biotech/ChemPharm Customer Partnership.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
System Planning- Preliminary investigation
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
Communications support for the Vodafone EMF community Pre-read for EMF Leader Workshop, 8 April 2008 Dianne Sullivan & Ros Young.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
HOW TO ASSESS SUPPLIER RESPONSIBILITY (TECHNICALLY & FINANCIALLY) Mariel D’Eustachio Dave Avera 3/28/00.
UK Wide Core Skills & Training Framework Findings of 2 nd Stage Consultation and Implications for Development of the Framework.
Don Wells Hess Corporation
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
What A written document that describes all the steps necessary for opening and operating a successful business. You plan should provide the following:
Mid-Course Adjustment Overview. Flood Map Modernization The Question “The committee understands that the 5-year, $1,000,000,000 program will not update.
United Nations Statistics Division Registry of national Classifications.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
1© 2010 by Nelson Education Ltd. Chapter Five Training Design.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Revised AQTF Standards for Registered Training Organisations Strengthening our commitment to quality - COAG February August 2006.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
© BLR ® —Business & Legal Resources 1501 Effective Meetings How to for Supervisors.
19th January 2012 Don Wells (Hess)
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Introduction : WEF Capital Project Complexity AA Packages Bulk materials BB SPAR Power- generation module Turbine generator package CC Valves, line pipe.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Task Force on Electro-magnetic Compatibility (TF EMC) Status report of TF to GRE-75 Friday, 8 April 2016 Informal document GRE (75 th GRE, 5-8 April.
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
Principal Investigator ESTCP Selection Meeting
API SC19 HPHT Template (Proposed as SC19TR1)
LAS Diagnostic Timetable April May June July August
Principal Investigator ESTCP Selection Meeting
It’s not all about the tool!
API 17Q Proposed Technical Changes to Rev 0
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
Specification on float equipment
CFI Requirements – Research or Technology Development
First 8 slides are what was presented in San Fransisco…
Improving assessment of GES Draft conclusions and Way forward
4. 2. Revision of the Regulation
Don Wells Hess Corporation
API 14H Task Group Status Proper Classification of Document
Principal Investigator ESTCP Selection Meeting
Specification on float equipment
5.b3 Monitoring & Reporting 2019
ISO and TR Update for FDA Regulated Industries
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management

History See Last Summer Minutes

Status Before Winter Meeting the committee Worked the 17N / 17Q relationship – Agreed to Combine the “existing Q” with 17N – Agreed a “New Q” was required – Plan at that time was that: API 17N would introduce the TQ Process A Technical Report would be written that would later be incorporated into 17N

Status At Winter meeting it was agreed that rather that a Technical Report, a proper and separate API 17Q would be written. – Plan was to have 17N introduce the subject, and – The new 17Q would cover Qualification, etc. in detail It was agreed that Committee would request funds to support a survey of the Industry view to define the Scope and Scale of the new 17Q It was agreed that based on the survey and the planned path forward, Task Group 17N would request any additional funds deemed necessary to complete the work.

Progress Ballot was issued April 22, 2015 – Closing Date – June 3, 2015 API 17Q Survey is underway – Progress Details – John Strutt Results received June 4th

Progress Results – Ballot passed with: 17 Affirmative 2 Negative 4 Abstain 5 Did not Vote 184 Total Comments 8 Complex Fixes 53 Discussion Required 123 Simple Fixes

Plan Path Forward – Meeting Planned for June 24 th to Plan Path Forward – Comments will be distributed to Working Committees – Target Completion – 4Q 2015 Negative Votes – Too Prescriptive in places – Simplification Requested – Too Repetitive Committee’s Original Intent was to have Sections Self Sustaining

Committee 17 Feedback No more Funded Work – All work to be completed by Volunteers Pull Annex F – “New Technology Qualification” out of 17N altogether Deliver Stand Alone “Subsea” 17Q ASAP – With all work completed by Committee Volunteers.

Post Meeting 17N Progress Continue to progress addressing ballot comments Have waited some on feedback from BP and Shell

Post Meeting 17N Progress Negative Votes Met with BP – Received Feedback – We are confident that we understand concerns – They are Positive and want to help – Confident that changes made will address concerns Have not met with Shell – We are Working this…………. – Holding off our work until this is done – Trying to avoid rework

Post Meeting 17Q Progress API / Committee 17 agreed to fund Scoping Survey Survey complete and report delivered to API July 6, 2015 – Written Survey – Follow up Conference Calls / Meetings Dave Wilkerson XoM has provided support & feedback Feedback – Overall Purpose – Level of Detail – Alignment with “Other” documents – Alignment with 17N

General Comments Received No negative comments so far – Industry recognises need for API 17Q. – No push back from industry on any of the listed topics in the flyer. Need to find optimal level of detail for 17Q – Simple enough to gain traction within the industry – Not overly complex. Readable by all engineers, not just reliability experts. – Generic enough to cover multiple different technologies – Detailed enough to be practical and support qualification. A safety case type approach suggested – Operators define and demonstrate achievement of their own goals and requirements. – This is the intent of Qualification Assurance Documentation Support to 17N or a fully stand-alone document? – Some operators looking for this to be stand-alone. – Annex on Qualification in 17N to be removed.

Themes to be Addressed 1.SQP & TQP – Using TRC to determine effort 2.TRL Ladder – Adaptation for different applications – Determination of initial TRL 3.Assessing advancement degree of difficulty – “Slope” 4.Guidance on definition of goals and requirements 5.Using Q–FMECAs to develop analysis & test plans 6.Understanding and quantifying residual risks and uncertainties 7.Qualification Assurance Documentation

Benefits to the Industry 1.More confidence from the industry in adopting new technologies 2.Minimising the need for unique and heavily detailed qualification requirements from each operator – One operator suggested that 80% of their requirements could be covered by 17Q. 3.Consistent, best practice approach across subsea suppliers 4.Potential to increase regulators confidence that equipment does not pose harm for people or the environment

Outline Scope Document Scope Document currently being developed comprising: – Preliminary Table of Contents for API 17Q – Brief notes under each heading – Summary of comments from industry inputs as an appendix API 17Q Preliminary contents (headings 1-4 standard sections not shown)

Issues / Questions Energy / Capacity to complete 17N revisions Can we fund support of 17Q? If not we will definitely leave Annex F in 17N

API 18 We are in conversation with API 18 LCM – Commented on implications to Industry – Comments on how it Affects and Interrelates to 17N – We are not working in a cave

Thanks and Questions