2008/7/281 ILCDR08 Report - Electron Cloud Session - 2008.07.08 – Univ. Y. Suetsugu, KEK.

Slides:



Advertisements
Similar presentations
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Advertisements

Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Review of Electron Cloud R&D at KEKB 1.Diagnostics 1.Beam Size Blow-up 2.Beam Instabilities 3.Electron Density 4.SEY (Secondary Electron Yield) 2.Mitigation.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
ECLOUD Simulations for CESR Witness Bunch Tune Shift Measurements Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences and Education.
49th ICFA Advanced Beam Dynamics Workshop October 8 –12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
1 Ecloud Simulations Group: Summary Miguel A. Furman Lawrence Berkeley National Laboratory Berkeley, CA , U.S.A. ILCDR08 Workshop Cornell University,
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
Updates of Electron Cloud Studies at KEKB Topics in 2008 Measurement of electron density in solenoid and Q field Mitigation using clearing electrode in.
EC R&D at SLAC, KEK, INFN, CERN –Details from KEK, INFN and CERN EC R&D CesrTA –Examples of RFA and SPU studies –Survey of results on mitigations –Buildup.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Results October 19, 2010 Mark Palmer for the C ESR TA Collaboration.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
CesrTA Electron cloud simulation update ILC 10 Workshop G. Dugan, Cornell 3/28/09 2/24/2016ILC 10 Workshop.
Electron Cloud Studies Theo Demma INFN-LNF Frascati.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Electron cloud beam dynamics G. Dugan, Cornell University CesrTA Advisory Committee 9/11/12.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2nd International Particle Accelerator Conference September 4–9, 2011, San Sebastián, Spain LEPP, the Cornell University Laboratory for Elementary-Particle.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Groove Mitigation and Plans
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
CesrTA Experimental Schedule and Priorities
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK

2008/7/282 Electron Cloud Group Charge (M. Palmer) The charge to the Electron Cloud working group is to review the status of electron cloud simulations, both for electron cloud growth and for electron cloud induced beam dynamics, the benchmarking of the major codes against each other, and benchmarking of the codes against experiment. The group should also review the status of electron cloud measurement and mitigation techniques. Finally, the group should look at the world-wide experimental program and inputs that are required for the ILC and CLIC damping ring designs, paying particular attention to identifying tests that are needed as part of the CesrTA program. __________________________________________________ This charge is quite ambitious; we made headway, but continuing discussions and real work will be required to fulfill the charge

2008/7/283 Four Working Groups Measurements – Electron cloud build up, effect on beam Simulations – Benchmarking, build up, effect on beam Mitigation techniques – Coating, groove, clearing electrode Experimental plans – Each Lab., CESR TA

2008/7/284 Talks in Measurement WG Cloud Build up – K. Kanazawa (KEK), R. Zwaska (Fermi Lab.) and S. Greenwald (Cornell): RFA [Retarding Field Analyzer] monitors – S. De Santis (LBNL): Microwave transmission Effects on Beam – K. Ohmi (KEK): Incoherent emittance growth – J. Flanagan (KEK): Coherent instability – R. Holtszpple (Alfred Univ.): Tune shift using witness bunch

2008/7/285 Measurement (Kanazawa) RFA type electron detectors with Faraday cup or MCP or multi-strip anode are installed to KEKB LER.

2008/7/286 Measurement (Greenwald) Comparison between Cornell-type thin RFA and APS-type – Almost consistent each other Newly developed RFA for CESR-TA – Dipole Chamber RFA

2008/7/287 Measurement (Santis) Electron density can be estimated by measuring the phase shift of transmitting microwave Instruments were set up for CESR-TA, following PEP-II

2008/7/288 Head-tail instability: Synchro-Betatron sidebands –The behavior is consistent with simulation J. Flanagan, ECLOUD07 Effects on Beam (Flanagan)

2008/7/289 Effects on Beam (Holtzappie) Tune shift measurement using witness bunch Use long trains e+/e- bunches to generate a electron cloud density. Place witness bunches at varying times after the generating train and measure the coherent tune shift of the witness bunch.

2008/7/2810 Summary Build up – Thin RFA is prepared for wiggler section (B-magnet) – Microwave transmitting method with better hardware – Measurement in Q-magnet or in solenoid field: Future issues Effect on beam – Measurement of coherent instabilities, incoherent emittance growth – Tune shift – Beam size: Development of X-ray beam size monitor Provide valuable data for verification of simulation codes.

2008/7/2811 Talks in Simulation WG – G. Dugan: “Simulations at Cornell for CesrTA” – J. Calvey: “Simulations for RFA studies at CesrTA” – J. Crittenden: “Simulations for witness bunch studies at CesrTA” – T. Demma: “Build-up of electron cloud in DA  NE in the presence of a solenoid field” – C. Celata: “Electron cloud cyclotron resonances for short bunches in magnetic fields” – K. Ohmi: “Study of electron cloud instabilities in CesrTA and KEKB” All but the last talk are about “build-up ecloud physics” (M. Furman)

2008/7/2812 What is to be done… (1) – Understand e-cloud build-up, decay, and spatial/energy distribution – Benchmarking of build-up codes Bring the codes (ECLOUD, CLOUDLAND, POSINST) into agreement “Rediffused electrons” likely to be the source of the discrepancy – Simulate a few beam fill patterns Obtain electron flux J e and dN/dE at RFAs Obtain transverse distribution of e-cloud at dipoles Fit basic SEY parameters to the above so as to agree with data Predict J e, dN/dE, tune shift along train and transverse electron distribution for other fill patterns – This subprogram will Characterize the e-cloud distribution around the machine Increase the confidence in build-up codes (M. Furman)

2008/7/2813 What is to be done… (2) – Understand effects of the e-cloud on the beam – Available codes: HEADTAIL, WARP, PEHTS, CMAD,… – CesrTA e-cloud R&D is driven by the necessity to preserve a very low beam emittance. This will bring intense scrutiny of e-cloud codes that compute effects on the beam – To a large degree, this subprogram can proceed in parallel with the build-up subprogram Just assume a value for the e-cloud density near the beam and proceed Look at single bunch (coherent and incoherent) effects Multi-bunch coherent effects – As the build-up subprogram provides more information on the e-cloud around the ring, refine the understanding of the e-cloud effects on the beam (M. Furman)

2008/7/2814 Talks in Mitigation WG – F. Caspers (CERN) : Microwave transmission recent measurements in the SPS and LHC  Measurements? – M. Pivi (SLAC): Mitigations experiments at SLAC – R. Zwaska (Fermilab): Plans for a resistive electrode – Y. Suetsugu (KEK): Experiment on clearing electrode at KEKB positron ring – M. Palmer: Mitigation studies presently included in the CesrTA program

2008/7/2815 ECLOUD2 – Grooved Chambers Performance: M. Pivi M. Pivi et al, SLAC Electron cloud signal in two smooth (flat) TiN-chambers and two grooved TiN-chambers installed in PEP-II. Electron cloud signal in stainless steel chamber.

2008/7/2816 Conditioning surfaces in PEP-II: M. Pivi, SLAC (M. Pivi) – Stability of TiN coating

2008/7/2817 Clearing Electrodes in KEKB: Y. Suetsugu, KEK (M. Pivi)

2008/7/2818 Mitigation tests in Cesr TA: M. Palmer, Cornell (M. Pivi)

2008/7/2819 Preliminary table to be completed as input for Technical Design Phase. Goal is to turn all Red colors to Green in the next two years. Other mitigations under development! (ex: Carbon coating CERN) Recommendation for mitigation as input for DR design: Discussion All DR element% ringAntechamberCoatingAdditional Mitigation Remarks DRIFT in STRAIGHT 33NoNEGSolenoidGroove if necessary DRIFT in ARC 56Downstream of BEND only NEGSolenoidGroove if necessary BEND7YesTiNGrooves and Electrodes WIGG3YesTiNElectrodes and Grooves QUAD1Downstream BEND / WIGG TiNGrooves and Electrodes (M. Pivi)

2008/7/2820 Summary Successful R&D program on electron cloud mitigations. TiN coating has been demonstrated to have an SEY below the instability threshold. Work continues to address a few remaining issues. Yet, requirements at future colliders (2 picometer emittance in the ILC DR, e.g.) are challenging. Hence, close collaboration between labs to develop complementary mitigation techniques is needed to further suppress the electron cloud effect. (M. Pivi)

2008/7/2821 Talks in Experimental Plan WG –G. Dugan (Cornell): Cesr-TA experimental plans –Y. Suetsugu (KEK): Experimental Plan at KEKB Positron Ring:Grooved Surface, and Clearing Electrode Ver.2 –K. Kanazawa (KEK): Plan of measuring cloud density in the solenoid field and in the quadrupole field –W. Fischer (BNL): EC plans in connection with eRHIC –General discussion on key experiments for experimental planning-focused on code validation and mitigation techniques-all (G. Dugan)

2008/7/2822 CESR EC experimental areas L3 Straight Experimental area – Instrument large bore quadrupoles and adjacent drifts – Install of PEP-II experimental hardware (including chicane) in early 2009 – Provide location for installation of test chambers Arc experimental areas –Instrument dipoles and adjacent drifts –Provide locations for installation of test chambers, in drifts where wigglers were removed. L0 Wiggler Experimental area –All wigglers in zero dispersion regions for low emittance –Instrumented wiggler straight and adjacent sections (G. Dugan)

2008/7/2823 Experimental Setup Use the same location Test chamber with antechambers Beam Gate Valve Wiggler magnets B = 0.75 T R47 Beam [Groove] [Monitor] Magnetic field Experimental Plan at KEKB Positron Ring Grooved Surface, and Clearing Electrode Ver.2 Y. Suetsugu, H. Fukuma, KEK M. Pivi and W. Lanfa, SLAC (G. Dugan)

2008/7/2824 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK) SOLENOID Given a solenoid field and the position of detection, the energy of measured electrons is automatically selected (=the volume is automatically defined). Electrons accelerated by a bunch along X-axis reach the detector. X-axis QUADRUPOLE (G. Dugan)

2008/7/2825 Key questions for experimental planning Cloud build up - What experiments will best pin down the SEY model parameters, particularly the number of rediffused electrons? The photoelectron generation model parameters? Fit of cloud saturation as measured by RFA to SEY peak and SEY yield at zero energy. Fit RFA energy-differential current and/or tune shift as a function of beam current and time to disentangle photoelectron parameters from SEY yield parameters. Transverse shape of RFA current measurement can be sensitive to SEY model parameters. RFA measurements in quadrupole can be important since they are at peak beta values. Improved RFA time resolution is important. TE wave transmission can measure growth and decay of average cloud density in a local area of the ring. (G. Dugan)

2008/7/2826 Key questions for experimental planning Effect on beam - How can we test that the effects of the “pinch” are being properly modeled? Head-tail instability threshold. Bunch length dependence of tune shift measurements - How can we best establish confidence in the instability predictions? The predictions for emittance growth? Scaling-Threshold of head-tail instability-dependence on beam size? Dependence is stronger on sync tune, avg beta, chromaticity. Should be roughly independent of emittance. Emittance growth-need transverse feedback, turn by turn beam size measurements. Difficult measurement. Codes that can be validated here: WARP, Ohmi’s PEHTS, HEADTAIL (G. Dugan)

2008/7/2827 Key questions for experimental planning Other bench measurements (e.g. SEY secondary spectrum) which could help establish code parameters? Measure (using Auger spectrometer) secondary spectrum of initial (and irradiated?) chamber samples. Measure <15 eV part of SEY curve-light sources? Try to think of other ways to do this. XPS to measure photoelectron spectrum (or with synchrotron light beam line from CHESS?) and photon reflectivity vs. energy, angle…data may exist for the latter. (G. Dugan)

2008/7/2828 Key questions for experimental planning Mitigation Techniques - What additional experiments are needed to establish high confidence in the proposed mitigation techniques to be used in the ILC damping ring? Repeat measurement of EC cloud suppression for TiN and NEG. Investigate chamber exposure to gases such as SF6, N2, O2. Try carbon coating proposed for SPS-durability under SR radiation Long term lifetime of TiN-PEP II and KEK can provide data. Clearing electrodes in wiggler and dipole, and grooves in dipole. Grooves for wiggler chamber should continue to be studied. Investigate feasibility of measuring transverse wake from single grooved chamber (and electrodes) using local field probes. (G. Dugan)

2008/7/2829 Summary – Cesr TA: A superb and ambitious e-cloud R&D program – Essential resources are in place Hardware Diagnostics and simulation tools Operational expertise Knowledge, flexibility and maturity of the machine – e + / e –, almost arbitrary fill pattern,… Knowledge of certain relevant e-cloud parameters Dedicated beam time – Close collaboration with outside experts is highly desirable to make rapid and sustained progress – I have a suspicion that 2 years will not be enough to achieve all the desired goals – Nevertheless, I am quite confident of a large degree of success, both for Cesr TA in particular, and for the e-cloud field in general. (M. Furman)

2008/7/2830 Comments from the CesrTA PM Working Group Summaries – Electron Cloud CesrTA offers a unique opportunity to benchmark simulation codes over a wide range of parameters and to study both EC growth and beam dynamics issues that are critical for damping ring performance Very promising recent results on mitigation techniques – Much remains to be done to ensure a viable (and economical) solution for the damping rings – Mitigation techniques and ring design must be integrated into an overall design Significant questions remain on surface physics issues – CesrTA offers a chance flexibly explore the “integrated effect” – Collaboration support for further surface science studies could be very beneficial CesrTA program will aggressively pursue a broad range of experiments to characterize the EC parameters that are necessary to provide confidence in the damping ring design