Www.itcsoftware.com ITC Software ITC FUNCTIONAL TESTING SERVICES.

Slides:



Advertisements
Similar presentations
Baldrige National Quality Program 2003 Baldrige National Quality Program The Site Visit Process and Evaluating Site Visit Issue Worksheets.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
By Eva Freund, The IV&V Group, Inc.
GAI Proprietary Information
Stepan Potiyenko ISS Sr.SW Developer.
Project quality management Cody Ronning 3/23/2015.
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
Project Process Discussion Adam D. Martinez Mgr, Market Ops Divisional Projects Organization ERCOT RMS Meeting May 10, 2006.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Stoimen Stoimenov QA Engineer QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Network security policy: best practices
Security Assessments FITSP-M Module 5. Security control assessments are not about checklists, simple pass-fail results, or generating paperwork to pass.
SAIC-F QA Internal Process (DRAFT ) Sudha Chudamani QA Team, Frederick National Lab Jan 2, 2013.
Introduction to Computer Technology
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
Process: A Generic View
Degree and Graduation Seminar Project Management Processes
Web Development Process Description
Project Management Process Overview
S/W Project Management
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
PMP® Exam Preparation Course
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
UML - Development Process 1 Software Development Process Using UML (2)
Security Assessments FITSP-A Module 5
Software Testing Life Cycle
RUP Implementation and Testing
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
L/O/G/O คลินิก ไอเอ ครั้งที่ 6/2011 The New Auditor Toolkit ตลาดหลักทรัพย์แห่งประเทศไทย ห้องประชุม 1101 ชั้น มิถุนายน 2554.
Workshop on Implementing Audit Quality Practices March 2006 Building Quality into the Financial Audit Process The NAO’s experience Gareth Caller.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
By Touseef Tahir Software Testing Basics. Today's Agenda Software Quality assurance Software Testing Software Test cases Software Test Plans Software.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
National Information Exchange Model Update for the Global Advisory Committee Spring 2008 Meeting April 10, 2008 NIEM Technical Architecture Committee (NTAC)
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Info-Tech Research Group1 Requirements Gathering World Class Operations - Impact Workshop.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Page 1 TEST in the large RELEASE REWORK ASSESS packaged application documentation models and source code management documents requirement alloc. matrix.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Team Skill 6: Building the Right System Assessing Requirements Quality (29)
Software Development A Proposed Process and Methodology.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Software Testing Process
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
ITC Software ITC AUTOMATION TESTING SERVICES Date (Day Month, Year) Place (City, Country)
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
ITC Software ITC PERFORMANCE TESTING SERVICES.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
What is a software? Computer Software, or just Software, is the collection of computer programs and related data that provide the instructions telling.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Fundamentals of Information Systems, Sixth Edition
Chapter 10 Software Quality Assurance& Test Plan Software Testing
Quality Management Perfectqaservices.
Project Process Discussion
Project Process Discussion
PSS verification and validation
Unit IV – Chapter 2 V-Test Model.
Presentation transcript:

ITC Software ITC FUNCTIONAL TESTING SERVICES

ITC Software Functional testing services PRESENTATION PLAN WHAT IS FUNCTIONAL TESTING FUNCTIONAL TESTING PROCESS

ITC Software What is functional testing WHAT IS FUNCTIONAL TESTING? Functional testing checks features and operational behavior of a product to ensure compliance with specifications. This testing ignores the internal mechanism of a system/component and focuses solely on the outputs generated in response to selected inputs and execution conditions. STAGES OF FUNCTIONAL TESTING PROCESS:  Initiation  Tests planning  Tests design  Tests execution  Analysis & reporting  Completion

ITC Software Functional testing: initiation phase ACTIVITIES: Testing team is compiled, testing experts are assigned to certain roles; Kick-off meeting; Acknowledgement with project:  Study of project-related documents,  Examination of prototype and/or previous version of application. ARTIFACTS: Assignment letters; Questions & Answers document.

ITC Software Functional testing: planning phase ACTIVITIES: Understand the operational and organizational context of the testing to be performed; Define and prioritize the risks; Create, approve and publish test plan; Test environment establishment. ARTIFACTS: Test plan; Configuration matrix; Test hardware request, if needed.

ITC Software Functional testing: tests design phase ACTIVITIES: Import functional specifications into the Jira; Create, confirm, and publish test procedures; Cover each functional requirement with one or more test cases; Develop automated test scripts٭. ARTIFACTS: Test cases in Jira; Automated test scripts٭. ٭ Only by customer’s request

ITC Software Functional testing: tests execution phase ACTIVITIES: Check the configuration and obligatory documents (What’sNew, ReadMe etc.); Installation and smoke test execution. Execution of all planned test cases in accordance with test plan strategies; Defects reporting. ARTIFACTS: Notification (passed/failed); Defect reports.

ITC Software Functional testing: analysis & reporting phase ACTIVITIES: Gather and analyze defect metrics; Communicate test results to key stakeholders. ARTIFACTS: Test results report.

ITC Software Functional testing: completion phase ACTIVITIES: Final build acceptance and recommendation for production; Overall testing results summary and evaluation; Participation in the post-mortem meeting. ARTIFACTS: Test evaluation summary report; Post-mortem report.

ITC Software Contact details ITC Software Phone: Web: