Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Preparation of the Self-Study and Documentation
Engaging Patients and Other Stakeholders in Clinical Research
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
London November 9th1 The Independent Assessment Committee London November 9th, 2006.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Project Cost Management Estimation Budget Cost Control
ACCIDENT REVIEW PROCESS. OBJECTIVES After completing this lesson the participants will be able to: Understand the role of an Accident Review Board/Board.
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
Configuration Management
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Project Management Process Overview
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
PMP® Exam Preparation Course
NIST Special Publication Revision 1
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Roles and Responsibilities
Configuration Management Matti Kuikka CONFIGURATION MANAGEMENT by Matti Kuikka, Unit Manager, Ericsson, Turku, Telecom R&D, Wireless Charging.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
IT Requirements Management Balancing Needs and Expectations.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Quick Recap Monitoring and Controlling. 2 Monitor Project Progress and Make Corrections.
Georgia Institute of Technology CS 4320 Fall 2003.
PATIENT-CENTERED OUTCOMES RESEARCH INSTITUTE PCORI Board of Governors Meeting Washington, DC September 24, 2012 Anne Beal, MD, MPH, Chief Operating Officer.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
FRYSC Advisory Councils Partners in Progress
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Constellation Space Transportation Planning Office July 30, 2009.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
EAC Voting System Certification Process (Test Plan) - 3/21/05
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
ESO and the CMR Life Cycle Process Winter ESIP, Jan 2015 ESDIS Standards Office (ESO) Yonsook Enloe Allan Doyle Helen Conover.
Select Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Configuration Control (Aliases: change control, change management )
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Software Project Configuration Management
Software Quality Control and Quality Assurance: Introduction
Software Configuration Management
11 ii. Develop a plan for aDSM
TechStambha PMP Certification Training
Clinical Engineering Lecture (3).
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
NASA Independent Reviews -Lessons Learned-
Instrument PDR Summary of Objectives
Project Management Method and PMI ® PMBOK ® Roles
Software Reviews.
Presentation transcript:

Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006

The NASA Governance Model The Governance Model provides for checks and balances between the constellation program and other offices within NASA For the Constellation Program: –The Program Manager and his staff provide the program functions. mission performance programmatic cost schedule –The Office of the Chief Engineer (OCE), Office of Safety and Mission Assurance (OSMA), and the Office of the Chief Health and Medical Officer (OCHMO) provide the technical authority function over: Engineering, SR&QA, and Health and Medical standards respectively Provide Informed technical recommendations on programmatic issues throughout all stages of a program life cycle. Provide an appeal path for program office personnel or line organization personnel who disagree with a program decision.

Decision Making Structure The Constellation Program uses a board/panel structure for making decisions that affect the project, as well as for making technical implementation decisions. Example of the decisions that affect the project: –Anything that requires a change to an already approved designed component. Example of a technical implementation decision: – Whether to approve a design modification requiring additional funding, or selecting which launch pad the program will use and develop at Kennedy Space Center.

Board and Panel Structure The representatives on the board cannot be program office personnel, nor can they be funded by the program to avoid conflict of interest.

Proposed CxP Board Structure

Board and Panel Process In this board structure, program office personnel are responsible for providing a recommendation to the Program Manager. The same program office personnel are responsible for setting up discussion groups and forums necessary to establish a recommendation or position. –This may include, but is not limited to, lower level boards and panels, technical reviews, etc. Board members representing the technical authority are responsible for either providing a recommendation to the program manager. In order to establish their recommendation or position, the technical authority board members are responsible for participating in the discussion board established by the Program. –This does not preclude the technical authority from calling its own meeting on a given topic, or from engaging an independent assessment.

Decision Making Process Boards and Panel structure established as the Program’s decision making bodies Formal Program decisions are documented on Program Directives – Change Directive – Management Directives

Notional Decision Model Identify Problem/Issue Document via white paper (archived) Does a decision need to be made No, archive white paper Yes, follow decision process Prepare the Decision Maker, Brief the Decision Maker Formulate decision package Identify stakeholder – Define evaluators Elevate discussion through working groups to Boards and Panels for decision – Create a Program Directive and presentation material, including white paper

Notional Model Cont. Make a decision and implement Authorize Directive and create actions to implement decision Track actions through closure Dissenting Opinion Documented in decision package Elevate through appropriate independent review – Chief Engineer, NESC Return to decision body for implementation Archive to Authoritative repository – ICE

Identified change Change Engineer to coordinate OPR for Budget/ Schedule Priority Constellation Program Program Integrated Change Management Process Example flow CE to coordinate (as needed) with PP&C for Support: Change Management Assessments Resources Procurement Evaluation of change content. Evaluators submit impacts, issues, or concurrence Conduct Technical Coordination Meeting CE to initiate CR with description of Change, With technical and programmatic language CE to Develop preliminary technical requirements CE to present IDP to SIGs and other Panels as required CE/OPR to develop New or Mod existing ITA, if required CE/Procurement to develop New or Mod existing contract Change Screening Group to validate CR & determine required evaluators and board dates Resources to generate a budget change directive (BCD), if required Develop Directive/Decision Package (IDP) Complete Directive out of Board If Meets Boarding Requirements NO YES 13 CE to present IDP to Control Board with Technical, Budget, and Schedule Analysis 14 Revise or disapprove Board approves NO YES 15 Board Member Authorization/ signature NO YES 6 Cancel or rework Obtain Head of Contracting activity Approval UCA required YES NO 16 Change Management status and report open actions and track CR/Directive to closure 20 Procurement Issues UCA YES NO CM Receipt Desk receives request 7 Fast Track Archive Records 21

Reflection Can you think of other systems where decisions are made using a board and panel process? What are the advantages of this type of decision making process? What are the disadvantages? Why is documentation so important throughout the decision making process?