Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.

Slides:



Advertisements
Similar presentations
H:\athoc\publ\heidelb\eures_1.ppt 1 Workshop MTM `99 Moving to Mobility Broadband Hybrid Fibre Radio (HFR) Access Networks: Concepts and Evolutions by.
Advertisements

SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
CSCI 4550/8556 Computer Networks Comer, Chapter 11: Extending LANs: Fiber Modems, Repeaters, Bridges and Switches.
Proprietary & Confidential1 OPLL vision... Coherent WDM systems:  INCREASED BANDWIDTH BY > 10 X  LOWER COST PER BIT  Closely spaced, long haul WDM systems.
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
Passage Three Network Transmission Media. Training target: In this part , you should try your best to form good reading habits. In order to avoid your.
Introduction to Interconnection Networks. Introduction to Interconnection network Digital systems(DS) are pervasive in modern society. Digital computers.
Network PHY - Cabling Cabling Issues with cabling LANs Types of equipment/choices Version2, 12/09/2015Slide 1.
1 Business Telecommunications Data and Computer Communications Chapter 4 Transmission Media.
CPRI-T (Fronthaul through transport of CPRI signal from RRH to the C-RAN baseband.) Jishnu Aravindakshan.
Engr Fundamental Ideas.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
Sharif University of Technology Physical layer: Wireless Transmission.
Local Area Network By Bhupendra Ratha, Lecturer
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Chapter 2 – X.25, Frame Relay & ATM. Switched Network Stations are not connected together necessarily by a single link Stations are typically far apart.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
Simulations of Beamforming Algorithms Stelio Montebugnoli, IRA-INAF, Medicina (BO), Italy, Giovanni Naldi, IRA-INAF, Medicina.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
Sami Al-wakeel 1 Data Transmission and Computer Networks The Switching Networks.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Research of long distance clock distribution system Université Libre de Bruxelles (IIHE) Yifan Yang, Kael Hanson, Aongus Ó Murchadha, Thomas Meures, Michael.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
Center for Tele-Information Evolution of the Infrastructure Market SERENATE final workshop Bad Nauheim 15/16 June 2003 Knud Erik Skouby CTI/ DTU.
Phase and Gain stability of optical fibre link used in MeerKAT Author : Roufurd Julie Supervised by : Prof Michael Inggs SKA HCD bursary conference Dec.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
Research Networks and Astronomy Richard Schilizzi Joint Institute for VLBI in Europe
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
Water Vapor In The Atmosphere: An Examination For CARMA Phase Correction Y.-S. Shiao, L. W. Looney and L. E. Snyder Department of Astronomy University.
DS3-T1 Network Infrastructure & Data Transmission Simon Garrington JBO/Manchester UK Feasibility study of the optical fibre network required to support.
Adaptive Filters for RFI Mitigation in Radioastronomy
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
© 2014 IBM Corporation IBM Research - Zurich VCSEL based Radio-over-Fiber Links for Radio Astronomy Jonas Weiss, IBM Zurich Research Lab, Switzerland.
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
Presented by, G.RajMohan I Year M-Tech. WHY WDM? Capacity upgrade of existing fiber networks (without adding fibers) Transparency: Each optical channel.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Phase Stable Interferometers at Jodrell Bank Ralph Spencer Jodrell Bank Centre for Astrophysics University of Manchester 3rd VLBI Technical Meeting Groningen.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
iit is the worlds’ 7 th largest telecommunication company llargest public sector units in India iit provides telecom services with ICT application.
By: Danielle Bowen-Dooley
An Introduction to Transmission Media
3 Computing System Fundamentals
Methods of transfer of ultra-stable frequencies to radio telescope
EVLA Advisory Committee Meeting System Status
Ethernet LAN 1 1.
Observational Astronomy
Observational Astronomy
Technical Foundations & Enabling Technologies – DS4
Terry Cotter LO/IF Group Leader
Back End & LO PDR April 2002 FIBRE-OPTIC LINKS -An Introduction Ralph Spencer Jodrell Bank Observatory University of Manchester UK --The use of.
A Draft Funding Model for the SKA
EVLA Advisory Panel Mtg. System Overview
ATCA Wideband Continuum Operation
Presentation transcript:

Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal Transport & Networks

Roshene McCool2 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Contents Distribution of LO signals over fibre Merlin L-Band Link (LBL) L-Band Link over fibre Results of experiments Is round trip correction required? Interferometry using a fibre LBL Results Conclusions

Roshene McCool3 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Transfer of Local Oscillator Signals Over Fibre Motivation –Accurate timing signals to all antenna & data processing stations –Like to have transmission over fibre to avoid RFI Specifications –Not specified directly, yet… –Working to ±1 ps in 1 second (driven by astronomy at high frequencies) and ±10 ps over 10 minutes Other LO over fibre systems –EVLA, 22 km –ATCA, 4.5 km LO over fibre for the SKA & e-MERLIN –Same specifications, similar distances –e-MERLIN, 400km (120km longest unrepeatered hop) –Adapted MERLIN LO distribution equipment for optical transmission

Roshene McCool4 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Merlin L-Band Link (LBL) MHz signal arrives at the antenna with delay Φ one way Good quartz oscillator locks a 10 MHz local oscillator signal using the incoming MHz The LBL equipment switches to transmit At Jodrell the phase Φ round trip of the incoming MHz signal is measured. Φ round trip /2 = Φ one way

Roshene McCool5 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 L Band link over fibre

Roshene McCool6 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Back to Back nm nm 110 km no thermal control 110 km thermal control Phase stability of an LBL over fibre link round trip /2 - one way

Roshene McCool7 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Back to Back nm nm 110 km no thermal control 110 km thermal control Phase stability of an LBL over fibre link

Roshene McCool8 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Back to Back nm nm 110 km no thermal control 110 km thermal control Phase stability of an LBL over fibre link

Roshene McCool9 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Back to Back nm nm 110 km no thermal control 110 km thermal control Phase stability of an LBL over fibre link 1 ps r.m.s stability in 1 second, 2 ps r.m.s stability in 10 minutes 5 ps r.m.s stability in 3 hours.

Roshene McCool10 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Do we need round trip correction? Why not use a directly transmitted frequency standard?

Roshene McCool11 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Do we need round trip correction?

Roshene McCool12 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Interferometry with a fibre LBL Observations of calibrator sources at 5 GHz Used a fibre LBL, distributing LO signals from Jodrell Bank to Pickmere (28.6 km) Other telescopes remained on a microwave LBL Direct comparison of competing architectures impossible – only 1 LO connections per antenna!! Observations were successful. Fibre LBL results impressive

Roshene McCool13 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Link Phase stability, microwave and fibre

Roshene McCool14 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Astronomy Phase at 5 GHz (correlated and round trip correction added) Using a microwave LBL Using a fibre LBL ** These plots are not direct comparisons and are made, using the same baseline (Knockin – Pickmere) over 5 hrs at different dates. Changes in Atmosphere will effect phase stability. However, we can certainly conclude the fibre LBL system is no worse than the microwave system.

Roshene McCool15 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Conclusions LO distribution over fibre is possible Over short links it may be possible to distribute phase with no round trip correction. ‼Hostage to external temperature changes Distribution over long links is possible using thermally controlled lasers Interferometry, performed at 5 GHz, using a fibre distributed LO was successful Further work will address fibre distributed LOs over longer distances, using repeatered and optically amplified links

Roshene McCool16 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Questions

Roshene McCool17 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Wide area data networks Roshene McCool SPDO – Signal Transport and Networks

Roshene McCool18 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Contents Defining the problem Identifying the risks How to approach it Questions

Roshene McCool19 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Introduction Defining the problem –6.5 Peta bits per second total data transport requirements –In one day SKA will transport 35,000x total internet traffic of the USA* !! –Network along arms of 3,000 km length –To a network of ~ 300 AA stations & 600 dishes * AT&T Analyst Conference Stankey x3 !

Roshene McCool20 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Technology risks Technology risk in wide area networks – relatively low –40 Gbps DPQSK systems –10 GE SFP+ and XFP transponders commodity & address even long links –optical transmission mature technology - EDFAs, DCMs, DWDM, CWDM –Many possible suppliers Long distance fibre networks (> 500 km) –Cost of high bit rates over long distance –Use commercial systems to avoid re-gen at lengths > 480 km –Availability of commercial dark fibre over long distances Interfaces (may be none standard)

Roshene McCool21 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Risks

Roshene McCool22 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Risks related to scale Cost !!

Roshene McCool23 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 How do we approach this problem ? Use industry & obtain a turn key solution –Transfer risk from the project to the supplier –Now we can all go home! This option doesn’t let us off the hook! –Have to produce a contract that will deliver for the SKA –Don’t know what it will cost –Evaluate ability of suppliers to deliver –Need a Plan B 

Roshene McCool24 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 How do we approach this problem ? Target development of subsystems to directly address SKA digital signal processing design block –Efficient use of development resource –address interface issues –power –Identify cost effective solutions

Roshene McCool25 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 How do we approach this problem ? Critical Analysis of solutions –Technical risk is low, telecoms industry & pathfinders can provide solutions – but this can encourage complacency –Implementation is on a scale not yet conceived in industry –Hand-crafted designs in pathfinders do not necessarily scale either –Ask questions, build systems that lead to objective metrics upon which to base costed designs for implementation. –Optimisation is required to reduce costs

Roshene McCool26 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Questions