6th International HRO Conference 9-11 April 2013 Ralph T. Soule, Captain, US Navy, retired Strategic Reliability

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
[Organisation’s Title] Environmental Management System
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Beyond Design Basis The Marine Version. Current Events Fukushima and North Anna are technical historical markers of unique circumstances of seemingly.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
SUBSAFE and the NASA / Navy Benchmarking Exchange
SUBSAFE Approved for Public Release
SUBMARINE Nuclear Reactors Friend or Foe?
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Accident Investigations
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS ACCIDENT INVESTIGATION Prepared by: Miss Hairul Nazirah Abdul Halim.
Overview Lesson 10,11 - Software Quality Assurance
Computer Security: Principles and Practice
Management of Health & Safety Joe McNicholas July 2000.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Importance of Documentation Demonstratin g Due Diligence concept application defense.
SMS Implications for Education Jim Dow Chief, Flight Training & Examinations Transport Canada Presentation to National Training Aircraft Symposium
DSS-SOC (Deep Submergence Systems Scope of Certification) Program
Federal Aviation Administration Presented to: The National Academy of Sciences By: Daniel I. Cheney, Manager, Safety Programs Federal Aviation Administration.
Protection of knowledge in the shipbuilding industry Leading expertise for a safer world A Classification Society perspective Vaughan Pomeroy, Technical.
I) Bob Ettinger Flight Test Manager Northrop Grumman Aerospace Systems El Segundo, CA An Approach to Flight Readiness and Executive Readiness Reviews The.
Safety Culture Working on Small Problems Before They Become Big Problems Thomas M. Weishar – Naval Reactors.
EUR2013 High Reliability Conference 1 Ralph T. Soule, Captain, US Navy, retired Division Director Aircraft Carrier Test, Evaluation, and Certification.
1 Accident Investigation 2 Objectives Explain the meaning and impact of accidents Identify different types of accident causes Know the purpose of accident.
From Research Prototype to Production
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
Patient Safety and Quality 8 February 2013 Ralph T. Soule, Captain, US Navy, retired Division Director Aircraft Carrier Test, Evaluation, and Certification.
Evaluation of Internal Control System
SAFETY FIRST PROGRAM  SAFETY IS #1 – ACCIDENTS National focus on Safety Training Unit Managers #1 priority Can be eliminated Leadership is the key –
Total Productive Maintenance (TPM)
Elements of Effective Behavior Based Safety Programs
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
FACILITATOR Prof. Dr. Mohammad Majid Mahmood Art of Leadership & Motivation HRM – 760 Lecture - 25.
Presented to: By: Date: Federal Aviation Administration Lessons Learned From Aviation Accidents World Aviation Training Conference Daniel I. Cheney, Manager,
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
Strategic Human resource Management Training & Developing.
Sunnybrook Health Science Centre SSCL. About SHSC Academic Teaching Centre Tertiary Care Centre Regional Trauma Centre 2 Campuses 16,000 OR’s per year.
Unit 9 Maintaining High Reliability and Implementation.
A QUALITY IMPROVEMENT TOOL
Behind the Mirror of Safety Steve Danon Director, Risk Control Services Marcotte Insurance Agency.
Achieving Confidence in Fleet Readiness by Generating a Quality Culture Ralph Soule, Senior Consultant, Spatial Integrated Systems. Inc. Greg Thomas, Senior.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Monitoring, review and audit.
Human Factors in Accident Investigation
Week 4 Seminar Investigating Significant Injuries and Lessons Learned.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
AIRCRAFT ACCIDENT INVESTIGATION MOOC THE INVESTIGATIVE PROCESS ACCIDENT REPORTS.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
1 During WWII, modern oceanography began with Cousteau’s invention of SCUBA. It and many other devices invented by Cousteau opened the ocean to millions.
LECTURE 7 AVIATION SAFETY & SECURITY
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
SUNY Maritime Internal Control Program. New York State Internal Control Act of 1987 Establish and maintain guidelines for a system of internal controls.
Pipeline Safety Management Systems
Measuring and Reviewing Performance
Data Driven Risk Modelling A Pragmatic Approach
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Safety Management in Europe
Air Carrier Continuing Analysis and Surveillance System (CASS)
TOLLING FOR THE BOATS JUNE.
Harm to assets and equipment
Nuclear Emergency Planning Chinese Experience
Accident Investigation
Accident Investigation
Presentation transcript:

6th International HRO Conference 9-11 April 2013 Ralph T. Soule, Captain, US Navy, retired Strategic Reliability Tragedy to High Reliability DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

Presentation Name Patient Safety and Quality 8 February 2013 History - Loss of THRESHER High Reliability Lessons: Submarine Safety (SUBSAFE) and other maintenance processes 2

Presentation Name Patient Safety and Quality 8 February 2013  Laid down, 28 May 1958, at Portsmouth Naval Shipyard, Kittery, ME.  Launched on 9 July  13 th nuclear powered attack submarine.  The first ship of its Class; leading edge of US submarine technology:  combining nuclear power with modern hull design  newly-designed equipment and components 3 USS THRESHER (SSN-593) USS THRESHER launching ceremonies at the Portsmouth Naval Shipyard, Kittery, Maine, 9 July She was fast, quiet, and deep diving

Presentation Name Patient Safety and Quality 8 February Submarine Buoyancy and Ballast Tanks

On April 10, 1963, while engaged in a deep test dive, approximately 200 miles off the northeastern coast of the United States, the U.S.S. THRESHER (SSN-593), was lost at sea with all persons aboard naval personnel and 17 civilians. THRESHER wreckage: About 200 miles off Cape Cod in 8,400 ft of water PNSY

Presentation Name Patient Safety and Quality 8 February 2013 Navy Response to Loss of USS THRESHER  Immediately limited diving depth of all submarines  Court of Inquiry  THRESHER Design Appraisal Board  Focus:  Design  Construction  Operation  Testimony Before Congress 6

Presentation Name Patient Safety and Quality 8 February 2013 Investigation Conclusions 7 Loss of propulsion power Flooding in the engine room Unable to secure from flooding Spray on electrical switchboards Unable to blow ballast tanks

Presentation Name Patient Safety and Quality 8 February SUBSAFE PROGRAM LOSS of THRESHER Overhaul/Construction MAINTENANCE PROCESS CHANGES Inception of the SUBSAFE and Significant Culture Change

Presentation Name Patient Safety and Quality 8 February 2013 Key Lessons “The loss of the Thresher should not be viewed solely as the result of failure of a specific braze, weld, system, or component, but rather should be considered a consequence of the philosophy of design, construction, and inspection … it is important that we reevaluate our present practices where, in the desire to make advancements, we may have forsaken the fundamentals of good engineering. ” – ADM Rickover 9

Presentation Name Patient Safety and Quality 8 February 2013 Safety must be part of process design, not an afterthought Key systems were under-designed for knowable risks Failure to bound an unexpected problem An attitude that specifications were merely goals, did not need to be taken literally, and HQ permission not needed for failure to meet them Impact of accumulated conditions, not a single failure The Navy had not updated its way of doing business to meet the requirements of updated technology and high-performance ships that could operate in riskier environments Processes are only as good as their audit plan 10 Key Lessons

Presentation Name Patient Safety and Quality 8 February 2013 Navy High Reliability Practices  It is expensive and costly to wait for mistakes to learn  Use existing debriefing records to tune awareness  Safety is created in the moment, where work is done, by the people doing it  “High reliability is a continuous, ongoing, dynamic accomplishment."  The blindness of hindsight bias short circuits learning... 11

Presentation Name Patient Safety and Quality 8 February 2013 Getting it Wrong

Presentation Name Patient Safety and Quality 8 February 2013 Checklists Work Model: training, procedures, supervision Critiques/Fact Sheets Risk Management Audits/Surveillances Pre-operative safety briefings Post-event/procedure debriefs 13 Navy Maintenance Tools for High Reliability

Presentation Name Patient Safety and Quality 8 February 2013 Key: capturing each person’s perspective, follow up Was the desired outcome achieved? Things to do more often Things not to do next time Hazards caught (which ones remain open?) Assess work process tools (effectiveness/utility of pre- briefs, procedure, especially things not covered, but should be, training/qualifications -> management credibility rests with follow up) What were the surprises and how were they identified? Things to do differently next time 14 Post-action reviews (informal)

Presentation Name Patient Safety and Quality 8 February ACCIDENT TIME SAFETY LEVEL Minimum Optimum Understanding the Challenge - Actual - Perceived THE BATTLE WHERE YOU THINK YOU ARE WHERE YOU REALLY ARE

Presentation Name Patient Safety and Quality 8 February 2013

Presentation Name Patient Safety and Quality 8 February 2013 “Those who cannot remember the past are condemned to repeat it.” - George Santayana 17 “A good pre-event briefing beats an accident investigation any day.” - ADM Kinnaird R. McKee

Presentation Name Patient Safety and Quality 8 February 2013 Questions 18

Presentation Name Patient Safety and Quality 8 February 2013  Bierly and Spender (1995). Culture and High Reliability Organizations: The Case of the Nuclear Submarine. Journal of Management: Vol. 21, no. 4, pp Holzmann, Mischari, Goldberg, and Ziv (2012). New tools for learning: a case of organizational problem analysis derived from debriefing records in a medical center. The Learning Organization: Volume 19, Issue 2, pp blog/2009/12/6/what-we-really-learned-from- thresher.html Loss of the USS Thresher, Hearings Before the Joint Committee on Atomic Energy ( What Sank the Thresher? Dean J. Golembeski Managing the Unexpected, Weick and Sutcliffe 19 References

Presentation Name Patient Safety and Quality 8 February 2013 BACK-UP SLIDES 20

Presentation Name Patient Safety and Quality 8 February 2013 Culture- Key Element of Success Submarine Safety Approach  Technical  Cultural 21

Presentation Name Patient Safety and Quality 8 February 2013  Work Discipline  Knowledge of and Compliance With Requirements  Material Control  Correct Material Installed Correctly  Documentation  Design Products (Specs, Drawings, Maintenance Standards, etc.)  Objective Quality Evidence (OQE)  Compliance Verification  Inspections, Surveillance, Technical Reviews, Audits  Continual Training 22 Culture- Key Element of Success The Fundamentals

Presentation Name Patient Safety and Quality 8 February 2013 Culture is a word for people’s “way of life”, meaning the way they do things. A Group of people has a separate culture when that group sets itself apart from others through its actions. 23 Culture- Key Element of Success SUBSAFE Culture