Capital Insight Pty Ltd ABN 76 056 297 100 SYDNEY 61 2 9955 2300 MELBOURNE 61 3 9888 8853 BRISBANE 61 7 3229 0044 NSW Housing NBJP Program Development.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Trainers Notes This package provides an overview of the major issues likely to impact on Group Training Organisations with the Introduction of the new.
1 A GUIDE TO LABORATORY SAFETY School of Engineering and Science February 2009 HEALTH, ENGINEERING AND SCIENCE.
Struck By/Caught Between 29 CFR 1926 Objectives In this course, we will:  Recognize potential struck by/caught between scenarios  Identify and recognize.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Safe Learner Induction Stage 1 (complete) Harry Wheatcroft Safety Advisor.
Workplace Transport Safety. Workplace Transport Hazards n People struck,run over or crushed by vehicles n Vehicles colliding with each other or plant/equipment.
Occupational Health and Safety SRXOHS001B & SRXOHS002B Presented by: Deb Moloughney.
Health and Safety Manual Section F9 Working at Height.
SHE Code 4: Safety and Safe Use of Work Equipment
INTRODUCTION TO THE WORK HEALTH AND SAFETY REGULATIONS IMPLICATIONS FOR SMALL BUSINESS.
Rev: Section 6 Alternative Fall Protection.
Risk Management (Safe Work Method Statements)
BUILDING AND CONSTRUCTION By: Joshua Ray. Hazard Powered tools and non-powered tools including jackhammers, boltcutters, hand-held cutting saw. Possible.
OHS General Induction for Construction Work in NSW.
Review Quiz 1. OHS Legislation 4. Incident Response Introduction 2. Hazards & Controls 3. OHS Communication EASY GUIDES Australia.
Disclaimer: The tips in this presentation are general in nature. Please use your discretion while following them. The author does not guarantee legal validity.
A guide to... General Construction Site Safety. This training tool should be used to help educate everyone on the dangers of working in the construction.
Health, Safety and Environmental Update July 2015 Purpose: The intention of this briefing is to pull together and share both Optimise and other contractor.
Electrical Safety. What Are Electrical Risks? Electrical risks are risks of death, electric shock or other injuries caused directly or indirectly by electricity.
Safe Learner Induction Stage 1 (College)
Engineers Without Borders H&S Presentation
What is it? Why it is so important?
Outcome 6 Safety requirements for working safely in excavations and confined spaces Unit 201: Health and safety in building services engineering.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
Job Safety Analysis (JSA)
A guide to… Maintenance Safety. Aim There is a legal requirement for regular and effective maintenance, inspection and testing of work equipment. This.
Unit 201: Health and safety in building services engineering
© University of Reading Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading.
Main contractor name – LTI# - Date of incident Workplace Safety Engagement Pack Volume 2014 Edition 1 Working at Heights.
Metal and Nonmetal Fatal Accident Review CY 2007.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
School of Physics Safety Seminar for Honours Students.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Capital Insight Pty Ltd ABN SYDNEY MELBOURNE BRISBANE Capital Insight Conference December 2007.
Demolition Hazards & Control Measures. Remember! The CDM Regs 1994 apply to all demolition & dismantlement work.
SHE Code 2: Safe Movement of Vehicles on STFC Sites Safety, Health and Environment (SHE) Group.
Electrical Safety, Subpart K
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Excavation & Trench Safety
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
CDM Construction Design and Management
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Ch 1 Construction accidents 1. Health and safety definitions Health is the protection of the bodies and minds of people from illness resulting from the.
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
SCOTTISH BORDERS SAFETY FORUM WORKING SAFELY WITH WORK EQUIPMENT Compiled by Donald A Mackay Mainetti UK Ltd.
Work Place Transport. Members of the BPF Health & Safety Committee.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
Onsite traffic management and pedestrian safety. Aim of this session Discuss why traffic management is a priority issue for us. Consult with our workers.
Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
Excavation Hazards & Controls.
OSHA’s NEW Walking-Working Surfaces 1910
Presented by Kevin Williams
Lock Out & Tag Out.
The importance of being alert to potential hazards when dealing with machinery, equipment and substances such as toner fluid.
Learning aim B: Explore how sub-structures are constructed
Unsafe personal conduct affecting the work of administrators
NSW Construction Induction Green Card
Welcome to ‘project name’
Site Based Preconstruction – Enabling Work
Health and Safety Staff meeting 9/7/18.
Construction Safety Council Breaking New Ground February 7, 2001
Understanding your Workplace Specific Critical Controls
SCOTTISH BORDERS SAFETY FORUM
Risk Assessment – Space Only Stands
Click anywhere to get started…
Traffic Management Rok Safety Seminar 2007.
Presentation transcript:

Capital Insight Pty Ltd ABN SYDNEY MELBOURNE BRISBANE NSW Housing NBJP Program Development and Project Management Services Public Interface Risk April 2010

Public Interface Risk Noise / vibration Dust / fumes Mice / cockroaches

Public Interface Risk Noise / vibration Dust / fumes Mice / cockroaches Site Security Plant movement and traffic management

Site Security and Public Access Statistics are difficult to identify Point of focus for NSW WorkCover Specifically included in the National Standard for Construction Work Contacts (2005) A person with control of a construction project must ensure that members of the public are not exposed to health and safety risks arising from the construction work. (Section 8.6, National Standard for Construction Work)

Site Security and Public Access In February this year a man sustained a fractured skull and leg when he fell four metres from an elevated work platform after gaining unauthorised access to a construction site in Bathurst. In August last year a 39-year-old man fell into a pier hole and drowned after gaining access to a residential construction site in Kingswood in Sydney’s west. Over the past five years, more than 40 infringement notices have been issued in relation to unauthorised persons accessing construction sites. Source: NSW WorkCover Media Release December, 2009

Site Security and Public Access NSW WorkCover risk assessment tool for this issue is (simplistically) based on two things: temptation hazard We (and the Contractor) need to take on a different mindset for this particular OH&S issue.

falls from partially constructed houses and scaffolding electric shock from “live” cables drowning in open excavations suffocation or crushing from collapsing material coming into contact with hazardous substances falling onto protruding reinforcement bars etc. Source: NSW WorkCover OH&S Guidance for House Builders, 2007 Site Security and Public Access Unauthorised visitors, (including children), may not be deterred by warning signs, have no awareness of the dangers that may be present on a residential building site and have no idea of the risks that they may be exposed to once they have entered a site. These risks can include serious injury from

Electrical power is off Access to elevated floors, scaffolding, ladders is blocked Plant and equipment, tools, chemicals and dangerous goods are securely stored Water drums are emptied Cover excavation areas such as pits, trenches and pier holes Appropriate signage is erected with contact telephone numbers Adequate site security Source: NSW WorkCover Media Release December, 2009 Site Security and Public Access Site controllers should conduct a site-specific risk assessment to determine fencing requirements and should ensure that while sites are unattended:

Plant Movement and Traffic Management If pedestrian, traffic or plant movements at or near a construction site are affected by construction work, the person with control of the construction project must ensure that these movements are safely managed so as to eliminate or otherwise control any associated health and safety risks. (Section 8.3, National Standard for Construction Work)

Plant Movement and Traffic Management A Traffic Management Plan (TMP) is required for development consent. Requirements for TMPs are set by Council and (in NSW) are normally based upon the RTA Manual (Traffic Control at Work Sites). We should know what the TMP says and should know if/when the Contractor is not complying.

Plant Movement and Traffic Management A TMP should consider the affects of construction on: public transport services emergency vehicles heavy vehicles cyclists pedestrians traffic movements

Plant Movement and Traffic Management NSW WorkCover Code of Practice for Moving Plant on Construction Sites (2004) identifies a number of hazards and potential control measures.

isolating vehicles and plant - for example, vehicles or persons may be guided around or past the work area using fencing, barriers, barricades, temporary warning or control signs, or a combination of these to secure the area where moving plant is used planning the direction that plant moves, so the visibility of operators is not restricted using spotters/safety observers to control traffic movement The use of specific measures to eliminate or control identified risks should be done on the basis of the risk assessment. In particular, consider the following:

training persons carrying out work on or near public roads in accordance with AS Manual of uniform traffic control devices – Traffic control devices for works on roads and the 1998 Roads and Traffic Authority Manual: Traffic control at worksites and Manual of Uniform Traffic Control Devices implementing safe working distances using audible reversing alarms and/or other technologies or other safe work practices. minimising the amount of moving plant working at one time implementing systems of control and notices at all entrances and exits where construction vehicles or plant enter or leave the work area by public roads, to protect and warn all persons approaching or in the vicinity identifying designated delivery and turning areas