MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Briefs submitted for the TB to approve Tesla’s long lead items: 1)Cold Mass Forging 2)Super conductor wire.
Spectrometer Solenoid Procurement Update Steve VirostekWing Lau Mike GreenStephanie Yang Lawrence Berkeley National LabOxford Physics MICE Collaboration.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
April-20, 2015MQXF Strand :Specification choices - A. Ghosh1 MQXF Strand: Available Implementations of various Cu/No-Cu in RRP April-20, 2015 LARP-CERN.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
FCC Conductor Development at KAT-Korea
Lessons learnt from CERN experience
MQXF cable with RRP wires for Q2
Coil Design and Fabrication
11 T Dipole Integration & Plans M. Karppinen
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
CERN Conductor and Cable Development for the 11T Dipole
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
To be presented at Nb3Al R&D Review,
Procurement of Nb3Sn strand for coils assembled at CERN
EuCARD2 WP 10.2 HTS Conductor
MQXF cable with RRP wires for Q2
Status of the PANDA Solenoid Magnet Production in BINP
MQXF updates P. Ferracin October 9th, 2014.
Development of Nb3Sn in Japan
Presentation transcript:

MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN

Outline Introduction MQXFS and MQXFL Magnet Strand and Cable Strand procurement for the prototype magnet (qualification phase or pre-production phase) MQXF Strand Production/Procurement Plan Phase I followed by Phase II production QA/QC plan at vendor and within the project MQXF Cable Cabling, Insulation and Testing QA Summary 11/5/2014 Arup Ghosh2

Introduction For the MQXF Q1/Q3 Magnets we will likely use RRP® wire from Oxford Superconducting Technology Strand diameter 0.85 mm Ti-Ternary Nb 3 Sn Cable is a 40- strand Rutherford Cable with stainless steel core The 1 st Short model MQXFS magnet is using coils made with 108/127 strand. Subsequent Short and Long MQXF magnets will use 132/169 design wire (smaller filament diameter) Final Specification Documents for the MQXF magnet strand will be released in June’2015. It will be a performance based specification as is currently being used for LARP strand procurements. 11/5/2014 Arup Ghosh3

LARP-MAG-M-8004-Rev. B (Present spec.) D s sub-element diameter I c Critical Current RRR residual resistivity ratio Process Ti-Ternary RRP® Nb 3 Sn Strand Diameter, mm0.85 ±.003 I c (12 T) at 4.2 K, A≥ 684 I c (15 T) at 4.2 K, A> 361 n-value> 30 D s, µm (sub-element diameter)< 60 Cu-fraction, % > 53 RRR (after full reaction) ≥ 150 Twist Pitch, mm14 ± 2 Twist DirectionRight-hand screw Minimum Piece length, m750 High temperature HT duration, h ≥ 48 11/5/2014 Arup Ghosh4

MQXF Strand Specification 11/5/2014 Arup Ghosh5 ProcessRRP® or PIT Nb3Sn Strand Diameter, mm0.850 ±.003 I c (15 T) at 4.2 K, A> 361 n-value> 30 I c (12 T) at 4.2 K, A (Reference Only)(> 632 ) D s, µm (sub-element diameter)< 50 Cu : Non-Cu volume Ratio 1.2  0.1 RRR (after full reaction) ≥ 150 Twist Pitch, mm19 ± 2 Twist DirectionRight-hand screw Strand Spring Back, deg.< 720 Magnetization Width at 3 T, 4.2 K, mT< 300 Minimum Piece length, mTBD

LARP-MAG-M-8007 Rev.0 (TBR) D s sub-element diameter I c Critical Current RRR residual resistivity ratio Process Ti-Ternary RRP® Nb 3 Sn Strand Diameter, mm0.85 ±.003 I c (15 T) at 4.2 K, A> 361 I c (12 T) at 4.2 K, A (for reference) (≥ 632) n-value> 30 D s, µm (sub-element diameter)< 50 Cu : Non-Cu volume Ratio 1.2  0.1 RRR (after full reaction) ≥ 150 Twist Pitch, mm19 ± 2 Twist DirectionRight-hand screw Strand Spring Back, deg.< 720 Magnetization Width at 3 T, 4.2 K, mT< 300 Minimum Piece length, m550 High temperature HT duration, h ≥ 48 11/5/2014 Arup Ghosh6

Procurement Plan for MQXF RRP-132/169 strand leading up to the Prototype magnet  Require 6 coils for short MQXF; cable unit length 150 m  Require 16 coils for Long MQXF; cable unit length 450 m  Assuming 12% loss in strand from cable mapping  Total length of strand for MQXFS: ~ 50 km (250 Kg)  55 km of strand is in inventory  Total length required for MQXFL: 350 km (~ 1750 Kg)  12 km in inventory  17 km awaiting delivery pending all tests  A total of 320 km has to be procured in FY’15 & FY’16  Present specification LARP-MAG-M-8004 Rev. B  Is being replaced by LARP-MAG-M /5/2014 Arup Ghosh7

Procurement Plan for MQXF Q1/Q3Magnets Require 90 coils for Q1 and Q3 Unit length of cable : 450 m Assuming 12% loss in strand from cable mapping Total length of strand for UL of cable: 22.4 km Total length required for project: 2016 km (~ 10,000 Kg) ~ billets depending on yield Present billet size is 45 Kg Coil production start: Jan’2018 Cable Production start: June 2017 Final Strand Specification set June’2015 RFP sent out Oct’2015 Contract placed Apr’2016 Phased Production Phase 1 : First delivery of 500 Kg May’2017 Phase 2 : Production Phase July’2017 through Oct’2018 Delivery complete Oct’ /5/2014 Arup Ghosh8

Strand Delivery Schedule 11/5/2014 Arup Ghosh9 First delivery after 12 months of placing of contract Cable mapping using first 500 Kg of wire 1 UL will use wire from at least 3 billets

Strand Delivery Schedule 11/5/2014 Arup Ghosh10 OST (most likely vendor for RRP wire) has sufficient capacity to handle both CERN and US orders in the same time frame. Production rate ~ 1 metric ton/month. During ITER the production rate was ~ 2 tons/month.

Cabling and Insulation Plan Cabling at LBNL Cabling to start 5-6 months in advance of start of coil winding. Cabling Start June 2017 Unit length is fabricated within 1 week. Cabling throughput required 2 UL’s / month at start, ramping to 3 UL’s/month by July’2018 S2 glass Insulation braided directly onto cable Vendor: New England Wire Technology (qualified) Sufficient capacity to keep up with cabling rate, 2 braiders available. Unit length insulated within 5 working days. 11/5/2014 Arup Ghosh11

11/5/2014Arup Ghosh12 QA-Plan Conductor Qualification - 1 Billets from OST Cable fabrication Coil Winding & HT QC Tests at OST Cable Qualification Strand Delivered HT Witness Sample Test Cold Mass Fabrication Billet Qualification = Hold point Cable Mapping

11/5/2014Arup Ghosh13 Conductor Qualification -2 Billet Qualification –Primarily based on vendor QA/QC –Apply SPC to track uniformity of strand production –QC tests on a smaller subset of samples at a US lab –Phase I will have more extensive checks than Phase 2 –OST data will be verified periodically with measurements at a US lab. Cable Qualification –This is important and needs to be completed prior to coil winding. –Mechanical tests, metallographic test, insulation thickness –I c and local RRR electrical test: minimum 3 extracted strand and one round wire –Heat Treatment schedule (HT) as specified for coil reaction

Strand QC Tests and Reports QC Tests and Reports Cu/Non Cu Twist Pitch and Twist Direction Ic, n-Value, RRR Magnetization Width Wire Springback Surface Cleanliness Certification Eddy Current Certification Final Wire Diameter Piece Length Material Certifications: Tin Rod Niobium Rod Niobium/Titanium Rod Niobium Sheet Copper Tube 11/5/2014 Arup Ghosh14 Ian Pong will elaborate on the QA/QC plan

Cable QC Tests and Reports QC Tests and reports Cable dimensions from CMM Cable 10-stack measurements Cable cross-section microscopy Cable Residual Twist RRR of Extracted strand Ic, n value of extracted strands Cabling Report Cable Piece Length Insulation thickness Material Certifications: Insulation fiber Stainless Steel core 11/5/2014 Arup Ghosh15

Summary Strand procurement has been planned to meet coil winding schedule. Strand production will last for 30 months Phase I used to assess vendor QA/QC and set control limits on full production Cabling start is planned for 5 months before coil winding Goal is to be well ahead of cable required for coil winding Peak cabling rate of 3 unit lengths/ month during production can be handled at LBNL Cable throughput ramps up after one year of operation. Final Specification documents and Strand and Cable production QA plan to be released in time for strand RFP (Request For Proposal) solicitation in Oct’ /5/2014 Arup Ghosh16

End of Presentation 11/5/2014 Arup Ghosh17

Cable Insulation Insulation is braided directly on cable New England Wire Technology (NEWT) Using S-2® glass (from AGY) with 933 Silane sizing 6 lengths of MQXF cable (170 m long) has been insulated Using braiding parameters to yield target specification of  mm thickness 10-stack measurements at 5 MPa are used to determine insulation thickness Thickness can be readily adjusted to meet any change to present specification /5/2014 Arup Ghosh