P&B ENGINEERING VISION r REMODELLING PROPOSAL. P&B ENGINEERING Utilising Feedervision as the base model Present relay for Venezuela job uses existing.

Slides:



Advertisements
Similar presentations
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Advertisements

1 Design for Commonality. 2 Team  Project Team Members:Brisia Roberts Mike Howie.
Substation Automation (S.A) System Project Supervisor: Stuart Wildy.
BHEL – Electronics Division, Bangalore
Software Engineering Process - II
Component-Based Adaptive Tasks Guided by Resource Contracts Peter Rigole K.U.Leuven Belgium.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
News about magnetic field simulation and progress ‘Towards magnetic field measurement benches’ Nikolay Morozov JINR Dubna.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
1 EDI: Electronic Data Interchange What is EDI? –Exchange of electronic data between companies using precisely defined transactions –Set of hardware, software,
R&D Design Center. Main activities 1. Alpha-Resources R&D Design Center provides: Embedded software development. Drivers development. Low-level programming.
Use of Multimedia in Engineering. Mechatronics engineering is based on the combination from three basic engineering field that is mechaninal, electronics.
October 11, Platform Design Considerations Jim Choate Intel Corporation.
MPLS networking at PSP Co Multi-Protocol Label Switching Presented by: Hamid Sheikhghanbari 1.
IEEE-1394 Data Link Design Review Sherry Womack Erik Pace ECE 4040 Dr. Martin Brooke.
Network Design & Technology Platforms Virginia Telehealth Initiative Consensus Conference: “Developing a Vision and Strategic Plan for Telehealth in Virginia.
Report of WG 6 Integration of on-board units into vehicles Michael Hollingsworth Chair, WG6.
Introduction In this power point I will tell people computer equipment and how you use them and how they work.
Presentation of HanKing
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
Information Technology Lecture No 3 By: Khurram Shahid.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
NEPTUNE Converter John Michael Morookian Vatche Vorperian.
SCSC 311 Information Systems: hardware and software.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
BMAN Integrative Team Project Week 2 Professor Linda A Macaulay.
Computer Main parts. Hardware Software. Hardware Computer hardware (usually simply called hardware when a computing context is implicit) is the collection.
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
Cosmic Test Rig  Mechanical structure to hold 4 PCBs  Minimise inter-sensor spacing  Rigid during ~weeks test run  Mounting for scintillators above/below.
Your Clear Choice for a Key Strategic Supplier Corporate Profile.
DataMaster 3000 Data Acquisition and Control Software.
IPC-2221 Connectors and Interconnects
COMPUTER HARDWARE ENGINEER 2100 × nasa.gov.
Editing is Selective Copying Select what will be copied. Pick and Arrange sequences and shots together.
English and computing. Да Нет Question 1 Is a computer an electronic machine which can accept data and give the results of the processing in a format.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Computer Engineering.
WORK-STUDY Work-study is a generic term for those techniques, method study and work measurement which are used in the examination of human work in all.
Commonwealth of Massachusetts Executive Office of Health and Human Services EOHHS Infrastructure Consolidation and Rationalization October 2008.
TE-MPE-EM Design Office William Billereau 29/11/
Lesson Objectives To understand why computer systems must be reliable To investigate the consequences of an unreliable system.
West Anglia Training Association. GROUP TRAINING ASSOCIATIONS Established during 1960s/70s as employer training companies created by member companies.
Basic Layout Types Product layouts Process layouts
THE SUSTAINABLE DESKTOP – AN OVERVIEW Professor Peter James
AUTOMATIC CIRCUIT RECLOSER
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Library Visits 2016 DePaul University, Chicago North Carolina State University, Raleigh University of Maryland, College Park Johns Hopkins University,
Arkom Engineering Consultants
DVR CET RENEWABLE ENERGY CLUB.
Chapter 1 Computer Technology: Your Need to Know
Electrical Engineering
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Designing and Installing a Network
MPE-EM Workshop Design Office William Billereau
PLC BASED AUTOMATION OF FUEL OIL PUMP HOUSE DRIVES IN TPS-2
Technology Plan Overview
 A programmable logic controller (PLC) is an industrial digital computer which has been adapted for the control of manufacturing.
عمل الطالبة : هايدى محمد عبد المنعم حسين
SL026/17 – Product Acceptance
Circuits and Circuit Elements
Peripheral Devices
Програмата е насочена към обновяване на многофамилни жилищни сгради, като с нея се цели чрез изпълнение на мерки за енергийна ефективност да се осигурят.
JL04V Series Low Profile Type End Bells
Production and Operations Management
Circuits and Circuit Elements
Wireless Embedded Systems
Automated Spotsize Measurement
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

P&B ENGINEERING VISION r REMODELLING PROPOSAL

P&B ENGINEERING Utilising Feedervision as the base model Present relay for Venezuela job uses existing hardware from established Vision 2 hardware platform Extended front panel and switch/led addition to achieve ‘look’ of a larger device Software modified and re-written to create recloser functionality

P&B ENGINEERING

VISION r design driven by specific project requirements. Intention is to create a generic recloser relay to meet FKI requirements Make use of the existing cost advantage Absorb the functionality of high specification recloser applications Minimise wiring, programming, reduces peripheral equipment and commissioning time

P&B ENGINEERING New VISION r to be mechanically repackaged PCB layouts and circuitry to be consolidated using presently used BoM No deviation from existing and proven software & hardware knowledge base Better use of space within the relay New hardware arrangement to be utilised as the de facto 200 series drawout relay New platform also for retrofit products & repackaged FV2 and AFV2 relays

P&B ENGINEERING

New format will not negate existing look Maintained cost advantage by using existing BoM Structurally superior Inclusion of high current trip and close relays Connectors can be to FKI choice Ease of manufacture Finished product

P&B ENGINEERING