INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April 2011 INGAS project – Year 2 Review Meeting.

Slides:



Advertisements
Similar presentations
The Strategic Information Audit: A Powerful Tool to Prevent Chaos Louis-René Dessureault, BA, MBSI Vice-president, Consulting Services.
Advertisements

Marketing & Sales Roundtable Total Product Planning: Delivering What Customer Requires March 2003.
INGAS Review Meeting, Brussels, 8 April 2011 INGAS INtegrated GAS Powertrain 1 SP-B1Reviewers General Comments Reviewers General Comments: It may be said.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 1 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ SP A3 Change of DoW Summary & Rational Approach.
INGAS Meeting, Regensburg, 13 October 2011Mirko BARATTA INGAS INtegrated GAS Powertrain 1 Meeting – Regensburg Subproject A2 Status (month 31-36) Mirko.
INGAS 24th Months Brussels Meeting, 27 & 28 October 2010 INGAS INtegrated GAS Powertrain 1 Brussels Meeting, 27 & 28 October 2010 InGAS Integrated GAS.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
PRIMA © PRIMA Consortium All Rights Reserved 1 Project Risk Management Project funded by the EC under the Information Society Technology /2002 Corporate.
Managing the Information Technology Resource Jerry N. Luftman
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Group 9A: Jerry Dutreuil Joshua Guerra Matt Grywalski William Mehnert.
INGAS INtegrated GAS Powertrain B. Hüchtebrock, FEV 1 INGAS Sub Project A3 „Boosted Lean Burn Gas Engine“ Review Meeting 07-08/04/2011 Brussels FEV Motorentechnik,
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 1 Mobile Terminals S.p.A. Telit.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
„Boosted Lean Burn Gas Engine“
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
Ouagadougou, Burkina Faso, 18 July 2013 Telecommunications Quality of Service Contractual Indicators for African region Gamal Amin Elsayed RG-AFR Chairman.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
1 Future Powertrains Global Opportunities & Challenges Sue Cischke Vice President of Environmental & Safety Engineering January 14, 2004.
INGAS meeting, Oulu, May 25 th /26 th, 2011 INGAS INtegrated GAS Powertrain 1 SP B0 Status presentation, outline E.ON Ruhrgas - Engine tests on oil influence.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
INGAS meeting, Brussels, 31 March 2010 INGAS INtegrated GAS Powertrain 1 INGAS project – Year 1 Review Meeting.
INGAS General Assembly, Brussels, 27&28 October 2010 INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels, 27&28 of October 2010 General.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
INGAS INtegrated GAS Powertrain INGAS “reviewer meeting”, “Brussels”, “April 2011” 1 Reviewer Meeting, Brussels, 8 th April, 2011 SPB2 Aftertreatment for.
Assessment Workshop Title of the Project (date). Project Title Assessment Workshop October 25, 2015© Company Name All rights reserved2 Agenda Purpose.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
6-7 / 3 /2006 INSEAD Campus - Fontainebleau WP5: Exploitation and Dissemination General approach and scheduling on deliverable: D5.1 Dissemination and.
How to Organize the Systems Selection Process Using the SCOR Framework Pittiglio Rabin Todd & McGrath April 12, 2000 David Kennedy, Principal.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
INGAS “24 Months Meeting ”, “Brussels, Belgium”, “27-28 October 2010” INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels - Belgium 27 -
INGAS meeting, Naples, Nov INGAS INtegrated GAS Powertrain 1 Continental Automotive GmbH Advanced development (AD) at INGAS SPA2 Meeting
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006.
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
Volvo Technology Corporation
INGAS 18 months meeting, Paris, 20./ DAIMLER AG INGAS INtegrated GAS Powertrain InGas 18 months meeting May, 20th/21st 2010 Paris, France SPB2.
INGAS Review Meeting, Brussels, 8 April 2011 INGAS INtegrated GAS Powertrain 1 SP BO – 24M PR reviewed MMWork PerformedWP Development of Recalculation.
INGAS - Integrated GAS Powertrain 18 months Meeting, Paris GdF Suez May, 2010 Project number: May 2010 Project number:
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
INGAS 12 months Meeting, Naples, 5-6 November 2009 INGAS INtegrated GAS Powertrain 1 12 Month Meeting Naples, Subproject B2, Status AVL (month 7-12) Marko.
Informal Working Group on Gaseous Fuelled Vehicles (GFV) Background and Accomplishments January 2008 to June 2016 Informal document GRPE rd GRPE,
Informal Group on Environmentally Friendly Vehicles EFV 15 th February 2011 Geneva Working paper EFV (Geneva, 15 February 2011)
SLAs with Software Provider. Scope “…declare the rights and responsibilities between EGI.eu and the Software Provider for a particular component.” Which.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .
4th. Plenary Meeting, Edinburgh, May 2010
شرکت تحقيق , طراحي و توليد موتور ايران خودرو
Informal Group on Gaseous Fuelled Vehicles (GFV)
Gamal Amin Elsayed RG-AFR Chairman
The MED Biodiversity Protection community
Process Improvement With Roles and Responsibilities explained
HyTEC: Hydrogen Transport in European Cities
RRP6 Development Process
CMAQ Developers’ Guidance
Assessment Workshop Title of the Project (date)
Second Avenue Subway Project Execution Strategy
Gamal Amin Elsayed RG-AFR Chairman
INFORMAL GROUP ON GASEOUS FUEL VEHICLES Within the UN GRPE (WP29)
Presentation transcript:

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April 2011 INGAS project – Year 2 Review Meeting

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 TimeItemName (Company) 09:00Answers to general comments / questions General status of the project Coordinator Massimo Ferrera (CRF) PM Stefania Zandiri (CRF) 10:00SPA1: answers to reviewers comments/questionsAndrea Gerini (CRF) 10:45SPA2: answers to reviewers comments/questionsAlois Fuerhapter (AVL), Harry Schüle (CONTI) 11:30SPA3: answers to reviewers comments/questionsChristoph Bollig (FEV), Bertold Hüchtebrock (FEV), Kenth Johansson (SAPT), Martin Müther (RWTH) 12:30Lunch 13:00SPB0: answers to reviewers comments/questionsManfred Hoppe (EON), Michal Takats (CVUT) Micheline Montero (GDF SUEZ) 13:45SPB1: answers to reviewers comments/questionsDavid Storer (CRF), Volker Strubel (Xperion) 15:00SPB2: answers to reviewers comments/questionsMichel Weibel (DAI), Matthias Rink (USTUTT), Alois Fuerhapter (AVL) 16:30End of reviewers meeting 17:30Feedback of the reviewers & PO to the Core Group

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Reply to Technical Review Report for Period 2 issued by Reviewers: 1)Written responses 2)Revised 24 months Periodic Report 3)New version of rejected deliverables 4)Release of some delayed deliverables

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Common methodology to compare the 3 engine technology approaches This methodology has been approved by PO and reviewers on October 2010

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Competitiveness vs benchmark A comparison with a certain vehicle available today in the market is feasible only if vehicle parameters are well known and applied at the same time to all technologies considered inside INGAS project. Moreover current NG engines available into the market show a gap compared to gasoline ones that can be overcome only thanks to technologies developed in INGAS project.

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Competitiveness vs benchmark

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Emission targets As written in table 3 of original and last amended versions of INGAS DoW, all demonstrators of INGAS Project have to comply with emission limits halved respect to Euro 6

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Cost assessment of different technologies INGAS Consortium agrees that the control of costs of NG powered vehicles is a critical issue and we have scheduled in the final assessment / comparison of the 3 engine technology platforms to carry out a cost evaluation of innovative developed technologies, but before to manage this issue it’s mandatory to freeze the technologies to apply on final demonstrators. Therefore the Consortium will provide a cost evaluation according to the list of technologies developed in INGAS project and mentioned above by Reviewers. This activity SP by SP will be carried only in the 3 rd year of the project after the completion of definition of integrated technologies to apply on final demonstrators.

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 Choice of monofuel approach The main scope of INGAS project is to develop technologies to apply on engines running only on NG and therefore the focus it to optimize and to maximize the exploitation of NG features to reduce fuel consumption and CO2 and to increase the performances. This approach is based on the hypothesis of a short term development of refuelling station network suitable for CNG monofuel vehicles. If this event won’t occur due to lack of adequate infrastructure available in the near future, there’s no chance that INGAS project can change this status because out of its scope according to contractual documents (i.e. DoW).

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April 2011 Reviewed INGAS GANTT (1/2) 17

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April 2011 Reviewed INGAS GANTT (2/2) 18

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 SPA2 - Answers to Reviewer Comments

INGAS INtegrated GAS Powertrain INGAS - 2° review meeting c/o EUCAR (Brussels) – 8 April Review meeting Period 2 – Brussels, 8 April 2011 SPB0 - Answers to Reviewer Comments