HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board 20-80 C schock,

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Today’s Objectives: Soldering Soldering is non-trivial, especially surface mount components Soldering is non-trivial, especially surface mount components.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
OVERMOLDING PROCESS & MATERIAL ELECTRONIC MODULE ASSEMBLIES
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Status of Tracker Power supply electronics Mauro Menichelli,Sandor Blasko,Lucio Accardo INFN Perugia.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Molly, Gwyn, Sam, and Eric.  Fixed temperature sensor circuit- it works!  Successfully soldered a surface mount current sensor and tested it on a breadboard.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 Guide to Soldering. 2 Key Concepts in Soldering.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
IPC-2221 Conformal Coating Types and Thickness
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
Stephen Wolf Kirk Iler Brian Bentz Fuhe Xu. Current Schematics Micro, Motor, Keypad 2/2/2011Team 6: Defender2.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Printed Circuit Board (PCB) manufacture Learning outcomes: To work effectively, independently and in small groups. To understand the importance of personal.
Electronics and Robotics Merit Badges Class 1 – Safety and Soldering 10/14/20151Electronics Merit Badge Class 1.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
IPC Thermal Transfer Components, which for thermal reasons require extensive surface contact with the board or with a heatsink mounted on the.
Test of HV Prototype Boards for LHCb Outer Tracker NIKHEF, Amsterdam The Netherlands
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Status of PDS A.Lebedev MIT AMS TIM Meeting, Houston, January 2007.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
IPC-SM Soldermask Issues Rework of Surface Mount Assemblies due to soldermask related defects is cited as a major cause of problems by assembly.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
WELCOME TO THE LIGHT AGES ™ Considerations For The Constructions Of Foundational Standards In Solid State Lighting Fred Maxik Founder and CTO, Lighting.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
GEM Foil Development at ECIL
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
1 Reporter : 黃一軒 Advisor : 莊承鑫 老師 Institute of Mechanical Engineering Southern Taiwan University Southern Taiwan University, Tainan Taiwan.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Status of the TileMuon Digitizer Board Victor Ferraz.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
Soldering Basics.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Update on Pb-free Electronics in Military Systems David Locker.
Leakage current test & switched HV stress test of ALICE TRD / TPC capacitors TRD status meeting,
LAV HV repair plans Matthew Moulson
Process map NVA VA VA VA VA NVA VA NVA NVA NVA NVA NVA VA NVA NVA NVA
Some proposals on HV circuits realization for segmented straw detector
Changed wiring of the 555 timer
IT 318: M13 PWB Assembly IT M13.
EDLC(Embedded system Development Life Cycle ).
HV capacitor Testing.
Nikhef/Bonn LepCol meeting
Presentation transcript:

HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock, Ileak 1nA, (later increase) 3 broken caps Sparking under cap’s Test cycles 10-80C for 2 weeks, 3. TRIAL 2 improved casting, pick and place paste, no cleaning slurry Still broken capacitors (not HV but mechanical) Curved boards 4. TRIAL 3 Still broken caps Now thermal shocks -40 to +120 C Most probably Rework solder problem 5. TRIAL 4 Now better mounting on flat bad, ‘no rework’, capacitor monitorring 6. If failing “open Boards” with vac casting Status HV boards

New HV board without fuses

Capacitor monitoring checklist