6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
6-7 April 06 MAC Review Global Design Effort 1 BCD Overview Process and Highlights Barry Barish GDE Caltech.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
6-7 April 06 MAC Review Global Design Effort 1 Configuration Control – Change Control Board (CCB) Report Nobu Toge GDE KEK.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Impedance-related and others collective effects Impedance-driven collective effects/Instabilities –Single-Bunch (very high priority) –Multiple-bunch.
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
15-August-2005Peter Tenenbaum for WG1 Convenors 1 Low Emittance Transport and Beam Dynamics (WG1) Snowmass Meeting “I hear the roar of the big machine,
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Integration Ideas for the Central Region Some old some new
Status and Plan of GDE Design Work (Including Road Map for RDR)
Accelerator Physics Technical System Group Review
ILC - Global Design Effort
Presentation transcript:

6-7 April 06 MAC Review Global Design Effort 1 RDR Management Accelerator Design Towards the RDR Nick Walker ILC-GDE

6-7 April 06 MAC Review Global Design Effort 2 Produce a detailed (conceptual) design for the ILC based on the Baseline Configuration, evolved through the design process Produce a cost estimate good enough to give best estimate and bound the costs RDR Goals

6-7 April 06 MAC Review Global Design Effort 3 Produce a detailed (conceptual) design for the ILC based on the Baseline Configuration, evolved through the design process Produce a cost estimate good enough to give best estimate and bound the costs RDR Goals This process continues as we refine the design (focus of latter part of this talk)

6-7 April 06 MAC Review Global Design Effort 4 Produce a detailed (conceptual) design for the ILC based on the Baseline Configuration, evolved through the design process Produce a cost estimate good enough to give best estimate and bound the costs RDR Goals Expected cost is used to set our priorities (for this year and the RDR)

6-7 April 06 MAC Review Global Design Effort 5 Baseline Configuration

6-7 April 06 MAC Review Global Design Effort 6 The Devil in the (Design) Details Baseline Configuration handed formally under Change Control at Frascati GDE meeting (November ’05) Basic layout and parameter space of machine established; e.g. –RF parameters –bunch parameters –IP parameters etc. Critical design decisions agreed upon; e.g. –number of tunnels –location of undulator-based e+ source etc.

6-7 April 06 MAC Review Global Design Effort 7 The Devil in the (Design) Details However, many detailed decisions still remained –exact layout of RF unit –detailed lattice designs component counts real estate requirements Conventional Facilities requirements Critical cost-driving systems dealt with first –main linac technology –Civil Engineering and Conventional Facilities Other ‘design issues’ not cost-critical e.g. –exact design of sources –exact DR lattice performance critical

6-7 April 06 MAC Review Global Design Effort 8 RDR Technical Management RDR Management Board Barish, Bialowons, Garbincius Paterson*, Shidara, Raubenheimer, Walker (chair), Yokoya * integration

6-7 April 06 MAC Review Global Design Effort 9 RDR Technical Management Area System Leaders are primarily responsible for the design of their AS They are also the ‘owner’ of the costs associated with their AS

6-7 April 06 MAC Review Global Design Effort 10 RDR Technical Management Technical System (TS) regional contacts are responsible for Engineering, Design of technical sub- systems and for estimating the cost. Typically one contact per sub-system per region.

6-7 April 06 MAC Review Global Design Effort 11 RDR Technical Management Global Groups (GG) Cover specialist design items which are considered global in nature (i.e. they cross multiple SA boundaries).

6-7 April 06 MAC Review Global Design Effort 12 RDR Matrix Reloaded System Areas Tech. GroupsGlobal Groups costs

6-7 April 06 MAC Review Global Design Effort 13 The “Two Views” of the RDR Accelerator Design –focused on layout, performance, accelerator physics, but nonetheless cost aware Engineering and Cost –design of components (SCRF, magnets, vacuum etc), and supplying unit costs –Important to produce harmonized cost estimates across regions ( cf Garbincius DCB presentation )

6-7 April 06 MAC Review Global Design Effort 14 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics Can only touch on examples in this short presentation Many aspects presented in previous talks Goal here is to show this effort is on-going

6-7 April 06 MAC Review Global Design Effort 15 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics Already covered in detail in presentation by Adolphsen SA leads: Adolphsen, Hayano, Lilje, Solyak

6-7 April 06 MAC Review Global Design Effort 16 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics SA leads: Gao, Guiducci, Wolski electrons: 1 ring positrons: 2 rings (e-cloud)

6-7 April 06 MAC Review Global Design Effort 17 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics SA leads: Gao, Guiducci, Wolski RF: 500 MHz  650 MHz better timing flexibility (synch. with Main Linac) larger number of available bunch patterns Better suited for so-called Low-Q parameter set (5600 bunches, 1×10 10 e ± /bunch) cons: RF system requires R&D Tighter inj./extr. kicker requirements Example of CC request (accepted)

6-7 April 06 MAC Review Global Design Effort 18 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics SA leads: Gao, Guiducci, Wolski Accelerator Design Issues Collective instabilities (under study) e-cloud for e + FII for e - (critical for low-Q set) Low emittance tuning (instrumentation) Inj./extr. kickers (R&D issue) Current RDR issues (cost-driven) Location and layout of RF Location of PS and Instrumentation Large international collaboration CF&S ($€¥)

6-7 April 06 MAC Review Global Design Effort 19 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics SA leads: Angal-Kalinin, Seryi, Yamamoto Accelerator Design Lattices well established Components counts, specs. etc. available Few AP questions remain (e.g. wakefield effects  impact on vacuum system) Current RDR issues under discussion Number of high-powered dumps Location of PS & Instrumentation Civil engineering (location and number of access shafts etc.)

6-7 April 06 MAC Review Global Design Effort 20 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics SA leads: Kuriki, Sheppard Primary e - source e - DR Target e - Dump Photon Beam Dump e + DR Auxiliary e - Source Photon Collimato rs Adiabatic Matching Device e + pre- accelerator ~5GeV 150 GeV100 GeV Helical Undulator In By-Pass Line Photon Target 250 GeV Positron Linac IP Beam Delivery System Primary accelerator design issues involve integration of system into the entire machine e+ source co-exists with other sub-systems Location of injector linacs (etc) currently being discussed/resolved interference issues

6-7 April 06 MAC Review Global Design Effort 21 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics Global Integration concerns those issues which do not logically fall into any one sub-system overall parameters timing operations (incl. MPS) interfaces (Now) the job of RDR management board (and specifically integration scientist) to keep track of and resolve these issues.

6-7 April 06 MAC Review Global Design Effort 22 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics EC commissioned a ‘global timing task force’ ( Ehrlichmann, Guiducci Kubo, Kurike, Wolski ) to make a recommendation on a layout of the machine consistent with the timing constraints: main linac frequency, pulse length and current Flexibility in bunch patterns in the DR (need for gaps due to e-cloud and FII) Constraints of e+ production Two IR operation critical! Example: Global timing constraints

6-7 April 06 MAC Review Global Design Effort 23 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics Maximum flexibility requires additional ~1.3km to positron path length maintains 1-1 correspondence between ejected and injected e+ bunch in DR maximises future flexibility in choice of bunch patterns cost increment  (but considered justifiable) Example: Global timing constraints

6-7 April 06 MAC Review Global Design Effort 24 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics Machine protection Overall philosophy (control system) Understanding ‘failure modes’ and their potential for damage (especially the main linac) example: How many fast emergency dumps are required? Operational modes (including recovery from trips) Diagnostics (stations) Number of emittance measurement stations Commissioning Initial machine commissioning start-up from ‘down’ (recovery) impact on machine design (# of tune-up dumps, diagnostic requirements etc.)

6-7 April 06 MAC Review Global Design Effort 25 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics (AP) Relatively low profile Current design effort builds on 10+ years of accelerator physics TESLA TDR US Options study ILC-TDR & ITRP etc. Current (RDR) emphasis on Engineering and Costs Updated AP still required to demonstrate we can achieve goal (luminosity) performance Each Area System has its own unique AP requirements (there are remaining issues e.g. in DR) Integrated simulation of baseline machine performance still required (update of existing knowledge) There are cost-relevant issues that do require some AP input e.g. MPS, # diagnostics stations etc.

6-7 April 06 MAC Review Global Design Effort 26 On-going Accelerator Design Main Linac Damping Ring BDS Positron Source Global Issues –MPS –Diagnostics Accelerator Physics (AP) Lattice (optics) work primarily being made by identified resources within Area Systems this work is close to be (conceptually) finished Beam dynamics issues in some specialised areas are also being coordinated within AS DR physics e+ source BDS Two important areas that are ‘global’ (inter-AS) in the so- called LET (Low Emittance Transport): Low-emittance tuning (static errors) Luminosity stabilisation (feedback) studies Machine protection ‘failure mode’ simulations Goal to produce ‘Start-to-End’ simulations of the machine to answer these (and other) questions.

6-7 April 06 MAC Review Global Design Effort 27 Interactions All of the ILC RDR work requires coordination across many institutes distributed world-wide –Communications and Communication Tools become of paramount importance A heavily web-based collaboration: –information posted to central web sites –use of wiki sites for information exchange –CERN InDiCo server for scheduling global meetings all ILC-related meetings should be posted here! –Document servers and EDMS will have web- based interfaces

6-7 April 06 MAC Review Global Design Effort 28 Interactions cont. Interacting –heavy use of traditional video- and tele-conferencing together with InDiCo for posting presented material works OK –Commercial web-based ‘virtual meeting’ systems (e.g. webex) currently being evaluated feedback so far very promising, but commercial system costs money. No replacement for physical face-to-face meetings –they will always be needed, but we try to minimise them We are still on the learning curve –we continue to monitor effectiveness and improve our approach.

6-7 April 06 MAC Review Global Design Effort 29 Final Comments RDR ‘matrix’ is in place and functioning well –primary focus is on consolidating baseline with a view to producing cost estimate Accelerator Design work continues around the globe –filling in many of the gaps in the Frascati Baseline Configuration –Global (Integration) issues now being dealt with directly –Priorities being set by cost impact no need to design the machine completely at this stage Global interaction (distributed design) remains a challenge –But we are up to it