Review of Interventions ____________ CanZinco Ltd.

Slides:



Advertisements
Similar presentations
Division of Mining and Reclamation Kenneth Politan (304) , ext
Advertisements

Environmental Assessment in Nova Scotia
The role of information in water-related decision making.
Proposed Regulatory Framework for Wastewater Presented by Claude Fortin Winnipeg, Manitoba December 6, 2007.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
The Chemical Water Quality of Lake Nipissing Andrew Paterson Dorset Environmental Science Centre Environmental Monitoring and Reporting Branch.
2009 Water Quality Monitoring Report – Fish Creek Vaughn Hauser, B.Sc. Naomi Parker, B.Sc., BIT, CEPIT.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Division of Water Quality
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
Koktuli River Instream Flow Reservation Cathy Flanagan Bristol Bay Native Association.
Changes in Spoil Electrical Conductivity (EC) and Sodium Adsorption Ratio (SAR) Following Irrigation at a Mine Site in Northwestern New Mexico Steven Perkins,
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
US EPA Region IV Surface Coal Mining Field Activities Adventures in Mountain Top Mining / Valley Fill Chris Decker.
Freshwater Aquatic Organisms and Habitat ( ) Rick Palmer Senior Fisheries Biologist Sharleen Hamm Aquatic Ecologist.
Environment Canada’s Intervention on the Doris North Gold Project Water Licence Application Savanna Levenson/ Dave Fox / Anne Wilson Environmental Protection.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
Government of Nunavut Department of Environment Environmental Protection Division Intervention to the Nunavut Water Board City of Iqaluit Water License.
1 CanZinco Ltd. NWB Water Use Licence Renewal, 1AR-NAN0914 Nanisivik Department of National Defence Public Hearing October 8-9, 2014 Louis Lemay P.Eng.,
Fisheries and Oceans Canada Intervention to the Nunavut Water Board on the Type A Water License Renewal for the Nanisivik Mine Project Fisheries and Oceans.
Laboratory Practice for rain water Sample Analysis Group 6 Pakistan Male Declaration Training Program and Refresher course March 25 to 28, 2008.
Thuli and Mzingwane catchments’ hydrochemistry Implications for risks Thuli and Mzingwane catchments’ hydrochemistry Implications for risks 6/16/2009.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)
Fisheries and Oceans Canada Fish Habitat Management Program Intervention to the Nunavut Water Board on the Doris North Gold Project Cambridge Bay August.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Review of Interventions Received after May14 th by Various Stakeholders.
1 Monitoring Activity to be included in Water License as Recommended by INAC Previously Committed to by MHBL New Acceptable to MHBL New Not Acceptable.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
STORET 1001 and the State of Utah Monitoring Strategy Today you will see: –What kind of attributes are available in STORET –How results, stations, and.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Final Plan Background rao6]Xu4 X6NAt5 ckwoz4mzb CanZinco submitted initial Closure Plan in February, 2002 Nunavut Water Board hearing held in Arctic Bay.
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
July 2013 Environmental Update for SLEMA Board July 2013 Environmental Update for SLEMA Board Zhong Liu July 31, 2013.
Landfill Odor Action Plan Utilities Department October 6,
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Water Quality Concerns WRI and DEP Data Water Quality Concerns.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Arsenic in Iowa’s Groundwater – The Unknown Threat: A Pilot Study in Cerro Gordo County Arsenic Conference November 9, 2011.
Current EFR synthesis database design Sites Site web sites Contacts Site disclaimers & agreements Status of data Basins Disturbances Disturbance details.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Cumulative Hydrologic Impact Assessment. Quality Assurance \ Quality Control Panel.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
Lynas Advanced Materials Plant
Review of Meadowbank Water License Application: Public Hearing
Characterization of Dissolved Solids in the Ohio River
Good afternoon __________ Chair, and members of the Board.
April 2017 Environmental Update for SLEMA Board
Baker Lake, Nunavut Anne Wilson, Environment Canada January 14, 2015
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Agnico-Eagle Mines Ltd
Kitikmeot Inuit Association
Meadowbank Water License Renewal
Groundwater Quality UNIT 5.
Independent Environmental Monitoring Agency Annual Report Summary
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Acceptability aspects: Taste, odour and appearance  Water should be free of tastes and odours that would be objectionable to the majority of consumers.
WHALE TAIL PIT Expansion Project
WGGW Bratislava – 26 October 2016
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Review of Interventions ____________ CanZinco Ltd.

5 Year Monitoring Issue raised Government of Nunavut (DoE), Environment Canada and INAC. Proponent in agreement but would request that NWB provide flexibility in the License for discretionary amendments to SNP

“Full suite” water quality parameters Issue raised by EC and INAC. New elements not previously monitored Including trace elements measured during operation that were at low or non- detectable concentrations Both EEM and Effluent Characterization sampling under MMER – identified parameters of no concern

“Full suite” water quality parameters CanZinco selected site specific parameters based on historic database which are considered to be ideal indicator elements with respect to potential toxicity and geochemical stability: Total cadmium, lead and zinc Major cations (calcium, magnesium, sodium, potassium, ammonia, and the derived parameter hardness) Major anions (chloride, sulphate, bicarbonate, carbonate, nitrate+nitrite, and the derived parameter alkalinity) TSS Specific conductivity (a surrogate for total dissolved solids) pH

Total Petroleum Hydrocarbon Analyses Issue raised by INAC and EC. INAC request for TPH at based on incorrect data in CanZinco submission Landfill: Water monitoring since 2003 shows TPH at lowest detectable levels CanZinco recommends continuing current Licence requirement to visibly inspect for “sheen” and sample for TPH when sheen is present

Retain station Issue raised by INAC: “it is applicable for assessing reclamation activity in the West Pit mining area”. Proponent: Retaining Station is downstream of the West Open Pit mining area (and the natural sulphide outcropping) and will continue to be monitored.

“Final Discharge” at and Issue raised by GN DOE. Proponent has significant issues with the designation of a sampling station as a final discharge point: A final discharge point defined as the final point of institutional control exercised over effluent water quality. This criterion applied to Station 159-4, the final outfall from the WTDA, during operation. At Stations and control has never been established. Natural effects may significantly impact water quality. Recommend they be monitored and reported but not classified as final discharge.

Contingency Plans Issue raised by GN DoE, EC and INAC. Comprehensive contingency plans have been identified for each of the major components of the Nanisivik Final Closure and Reclamation Plan (FCRP). Submitted to the NWB as Appendices to the FCRP, they were approved and are on file at the NWB registry. References appear below:

Contingency Plans Appendix A: Engineering Design of Reclamation Surface Covers Appendix B: Assessment of Surface Cell and Test Cell Taliks Appendix C: Quarry Development and Reclamation Plan Appendix E: Nanisivik Mine Rock Piles and Open Pits Closure Plan Appendix J: West Twin Disposal Area Closure Plan Appendix L: Nanisivik Mine Landfill Closure Plan

Reclamation of Tankfarm Issue raised by DFO, INAC, DoE CanZinco has made a final appeal to Minister’s level. Commitment to submit detailed reclamation plan and schedule for approval by September 30, 2009.