The Power Of Greater Nashville - 1 - T&D Planning at Nashville Electric Service Paul H. Allen, Nashville Electric Service APPA E&O Technical Conference.

Slides:



Advertisements
Similar presentations
MANAGEMENTS DISCUSSION & ANALYSIS NMASBO Fall Conference 2012 Taos, New Mexico Presented by Leslie Smith, Retired Business Manager.
Advertisements

A Path breaking Technology for Network Maintenance and Optimization
Program Management Office (PMO) Design
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Challenges in the Implementation of Enterprise GIS – TNB’s Experiences Malaysia Geospatial Forum 2012.
Network Design and Implementation
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Ed Gray, PE Public Service Electric and Gas
FASAB Update CIGIE/GAO Financial Statement Audit Conference Wendy Payne Executive Director March 30, 2011.
Principles of Information Systems, Seventh Edition2 An organization’s TPS must support the routine, day-to- day activities that occur in the normal course.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to Cost management
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
S/W Project Management
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Seattle City Light – AMI Business Case Results
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
APPA National Conference RP3 A Perspective from Two Systems June 21, 2005 – Anaheim, CA.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
1 AEP’s gridSMART sm Initiative FCC Workshop August 25, 2009 Jason D Griffith Director – IT Telecom Engineering.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Quarterly Performance Report For the period July - September 2011.
GOS Economic Model (GEM) Overview Uses the same underlying simulation software (Stella) which was used in developing TNM Economic Model (NB-Sim) Provides.
The University of Texas at San Antonio FY 08 Annual Financial Report Highlights January, 2009.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
Puerto Rico Electric Power
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
Optimizing the utilization of your skilled resources How to balance demand with capacity in volatile multi–project environments Barry Muir Managing Director.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Utility Needs and Smart Grid for Major Storm Events
Transmission and Distribution Loss Study
Accounting for Changes in Prices
City of Lebanon, Missouri Electric Department
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

The Power Of Greater Nashville T&D Planning at Nashville Electric Service Paul H. Allen, Nashville Electric Service APPA E&O Technical Conference March 9, San Antonio, Texas

The Power Of Greater Nashville Background Nashville Electric Service (NES) is the operating name for The Electric Power Board of the Metropolitan Government of Nashville and Davidson County NES is governed by a five member board, appointed by the Mayor and confirmed by the Council The Board Members serve 5 year terms, without pay, and have full responsibility for the operation of NES The day-to-day responsibility is delegated to the President and CEO of NES

The Power Of Greater Nashville NES Statistics 700 m 2 Service territory approx. 328,000 Customers 291,000 Residential 30,000 Small Commercial 6,700 Large C&I 12,233,000 MWh sold in FY % of revenue from C&I customers 77.8% to purchase power Residential ¢ / kWh; $6.01 customer charge

The Power Of Greater Nashville NES Statistics 62 Major substations 161 kV and 69kV transmission voltages 23.9kV, 13.9kV and 4 kV distribution voltages Secondary network system in downtown No generation - 22 feed points from TVA Went from winter peaking to summer peaking in mid 1990’s Summer peak 2,474 MW August 2000 Winter peak 2,441 MW December 1989

The Power Of Greater Nashville Issues in the Past Prior to 1992, a 5 year system plan was prepared that included a one year construction plan The plan was prepared internally and the plan was reviewed by an independent engineering consultant - similar to an external financial audit The plan was redone every five years or when annual load growth exceeded 2.5% Increasing financial pressure resulted in some maintenance activities being scaled back in the late 1980s

The Power Of Greater Nashville Timeline of Events

The Power Of Greater Nashville Timeline of Events

The Power Of Greater Nashville Timeline of Events

The Power Of Greater Nashville Timeline of Events

The Power Of Greater Nashville Current Environment Planning Process - Overview A 20 year comprehensive T&D plan is prepared at least every 5 years or when system demand reaches or exceeds 105% in the base year of the last study Result - a new plan every 3 to 5 years An external consultant is used on every other plan Assures that process is state of the art Provides appropriate due diligence to Board and Executive Management Interim studies are performed (internally) between plans to determine if plan should be accelerated or slowed

The Power Of Greater Nashville Current Tool Integration OMS (CADOPS) GIS (ArcInfo) SCADA (ESCA) Distribution (Feederall) Transmission (PTI PSS/E) Forecast (Foresite) Reliability (Relinet) AVL CIS (Legacy) Common Data Base System Forecast Various Inputs

The Power Of Greater Nashville Current Environment Planning Process - Forecasts System Forecast Rolling 5 year trending method based on historical data - primarily the weather adjusted peak Sufficiently accurate for 5 year period High, medium, and low forecasts Forecast changes from plan to plan are explained Substation Forecast Area load growth forecasts using software tool Determines where the load growth is likely to occur

The Power Of Greater Nashville Current Environment Substation Forecast Creation of land use models from satellite imagery, zoning data, city planning data, etc. - one acre small areas Much of information is from GIS systems Small areas are assigned to distribution substations System forecast is spread to substations by software tool and substations loads are grown relative to each other based on small areas Used to identify capacity needs, inputs for transmission load flow studies, and to determine loads on distribution feeders

The Power Of Greater Nashville Land Use Model - Downtown

The Power Of Greater Nashville Southwest Area Growth

The Power Of Greater Nashville Current Environment Planning Process - Contingency Analysis Transmission N-1 planning criteria using software tool using inputs from forecasts Identify multiple solutions Short list of solutions developed (costs developed) Distribution Extract distribution model from OMS system Identification of loading and voltage problems and potential solutions using software tool Identification of reliability solutions for worst circuits using software tool

The Power Of Greater Nashville Current Environment Planning Process - Project Identification Impact analysis - external factors that could affect the solution - property, schedules, public, etc. Selection of solution and identification of needed projects for the selected solution Prioritization of projects for selected solution - order of construction Schedule leveling of projects for selected solution - dollars and resources

The Power Of Greater Nashville Current Environment Budget Process 5 year financial model used to forecast net income Key financial goals Cash reserve, debt coverage, leverage goal Capital budget developed from T&D plan, forecasted new business, other infrastructure projects, and equipment/facilities Current prioritization is by senior management team and stakeholders Iterative Process - capital expenditures affect financial goals - pressure to limit expenditures

The Power Of Greater Nashville Financial Model

The Power Of Greater Nashville Current Environment Plans have been and will always be at risk for delay for many reasons - financial, public pressure, major equipment failures, weather, etc. It’s our experience that when plans are delayed beyond a reasonable timeframe, the cost of providing safe, reliable service dramatically increases, the solutions required to provide that service may not optimal, and there is increased risk to the reliability of the electric system This is a constant pressure on the planning process

The Power Of Greater Nashville Capital Expenditures

The Power Of Greater Nashville Current Gaps - Prioritization Current process is perceived to be unreliable In March 2003, began implementation of the EPRI Project Prioritization tool Goals: Model All Distribution Capital and O&M Projects Value projects using multiple attributes and Common Scale Determine measurements and weights Initial Model – Spring T&D Projects only End result -> prioritized project list by value

The Power Of Greater Nashville Project Prioritization

The Power Of Greater Nashville Current Gaps - Work Mgmt. Mainframe legacy system installed in 1989 Purchased integrated system in 2002 (Mincom) Work Management, Finance, Supply Chain External consultant facilitated “Best Practice” process definitions Planned “Go-Live” is July 1, 2004 Goals: Enable one view of all work Improve ability to prioritize and manage work Improve project management Reduce overall cycle time for work lifecycle Provide accurate tools for estimation and design Ensure that resources are at the right place at the right time

The Power Of Greater Nashville Work Management

The Power Of Greater Nashville Current Gaps - Asset Mgmt. No existing system or formal process EPRI recommendation Process consultant recommendation New work management system will provide necessary data and support system (Equipment Register)

The Power Of Greater Nashville Current Gaps - Asset Mgmt. Manage the Assets Asset Management Decision Support Maintenance Planning Budgeting Construction Planning Standards Other Work Planning System Planning

The Power Of Greater Nashville Current Gaps - Asset Mgmt.

The Power Of Greater Nashville Current Gaps - Asset Mgmt.

The Power Of Greater Nashville Current Gaps - Asset Mgmt. Goals: Improve information on health of assets Improve ability to compare and prioritize capital work Improve project management Develop consistent maintenance programs Improve linkage between budgeted projects and actual work performed Benefits realization Improving quality of asset data Coordination of repair/replace decisions Improve short and long term budgeting Improve standards and estimating process

The Power Of Greater Nashville The Future We striving for... More integration of and proficiency with tools and systems More public involvement in the planning process More accurate SCADA and OMS data More real time integration with SCADA Use of the Equipment Register to capture costs and operating statistics by circuit and equipment Better communication of the benefits and risks of proper T&D planning and construction to all of our stakeholders

The Power Of Greater Nashville Future Integration Plans OMS (CADOPS) GIS SCADA Distribution Planning Transmission Planning Substation Forecast Reliability Planning System Automation CIS Common Data Base System Forecast Various Inputs Mobile Data/AVL Other Operational Applications Equipment Register

The Power Of Greater Nashville Thank You!