SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am
TG 2 CHARGES Call to order and roll call TG charges June 2010 minutes June 2010 action items Status of standards Old business New business Next meeting and adjourne
TG2 MEMBERS / ROLE CALL Cheryl Stark – Chair Jim Berger Ryen Caeen David Ekas Stephen Polnaszek Paul Scott Johnna Smith Tim Wilkin Farewell and thanks – Del Son Welcome – Bernard Fraboulet
June 2010 Action Items Include comments to DIS vote for RP 13B-2 6 th ed. / ISO Forward for FDIS ballot. API will publish based on DIS. Publish ISO 13500, Amendment 1 following FDAM ballot Get 13C 3 rd ed. / printed Prepare DIS 13J/ with PCT? Complete RP 13K for ballot Encourage work on RP 13L Notify API of Mark Morgan departure
TG2 CHARGES Assist TGs and WGs in technical and editorial work on documents for publication Format the document to a publishable format Prepare all drawings in a publishable format Include CAS numbers, equations, and proper use of shall, should and may
TG2 CHARGES (CONT) Maintains a list of standards and publication status TG or WG chair is responsible for technical content and contacting TG2 when assistance is needed API TG2 assists ISO SC3/WG1 in preparing NWIs and documents for ISO Central Secretariat
REPORT – SPEC 13A/ISO API published 18 th edition – Feb 2010 including Clause 20 (Barite 4,10) ISO published Nov 08 – did not include Barite 4,10 ISO AM1 Barite 4,10:2010
API SPEC 13A API Monogram Program requested Spec 13A be color-coded for audit purposes Completed and reviewed by M-I, BHI, Newpark and Halliburton, Questions for Auditors constructed Work completed for API
REPORT RP 13B-1/ISO API RPP 13B-1 published Mar 09 ISO published in 2008 No work done on Annexes I and J – PPT – waiting on WG to submit new text NWI must be prepared for API and ISO to include PPT in Annexes I (and J deleted), as an Amendment (ceramic disks, procedure)
REPORT RP 13B-2 / ISO ISO FDIS accepted by ISO CS – Nov 10 Stage Reworked with new equations (33), (34) and (35) of dual salt calculations (THANKS – PAUL SCOTT) ISO FDIS vote Feb 2011 (50.20) API will print following ISO vote NWI must be prepared for API and ISO to include PPT in Annexes K (and L deleted), as an Amendment (procedure)
REPORT RP 13C / ISO ISO NWI and DIS approved Accepted by ISO CS for FDIS – Nov 10 FDIS ballot (50.20) – March 2011 API will published following completion of FDIS ballot
REPORT RP 13D Published May 2010 P. Bern pointed out errors in equations (46) and (47) Mario Zamora has submitted several pages of corrections – need decision as how to proceed as not all are editorial
REPORT RP 13I / ISO API RP 13I, 8 th edition, published Mar 09 ISO published 2008 No work done on Clauses 27 and 28 – PPT – waiting on WG to submit new text NWI must be prepared for API and ISO to include PPT in Clauses 27 (and 28 deleted), as an Amendment (ceramic disks, procedure)
REPORT RP 13J / ISO Accepted for NWI ballot by ISO CS DIS stage (40.00) Ballot is out in some countries, should be in USA shortly Addition buffer capacity and corrosion included
REPORT RP 13K Approved by TG8 Submitted to SC13 for vote API Publications is editing and document should be available in Feb 2011
REPORT RP 13L Reaffirmed in Sep 2010 Publication date remains 02/03, edition 1 D. Ekas is reviewing need for additions or deletions
REPORT RP 13M / ISO RP 13M, edition 4, published 07/04 Time for three-year review Mahmoud Asadi will report during SC13 meetings this week Need to change API numbering to reflect this is part of series 13M-xxx (this will be API RP 13M-1)
REPORT RP 13M-4 / ISO API 1 st edition, published 12/06 ISO 1 st edition, published in 2006 Time for three-year review
NUMBERTITLEAPIISO 13A Drilling Fluid Materials P&ngi – Drilling fluid materials – Specification and tests 2010Nov 1, 2008 AM: B Recommended Practice for Field Testing of Water-based Drilling Fluids P&ngi – Field testing of drilling fluids – Part 1: Water-based fluids Mar 09March 08 13B Recommended Practice for Field Testing of Oil-based Drilling Fluids P&ngi – Field testing of drilling fluids – Part 2: Oil-based fluids (API 13B-2 is not an ISO adoption) Mar 05 Reaff: Oct – Nov – Dec 10 IS – May 11 ? 13C Drilling Fluids Processing Systems Evaluation P&ngi – Drilling fluids – Processing systems evaluation Apr 05 Reaff: Dec Nov – Feb 11 ? IS – Jun 11 ? 13DRheology and Hydraulics of Oil-well Drilling FluidsMay 10 13I Recommended Practice Standard Procedure for Laboratory Testing Drilling Fluids P&ngi – Drilling fluids – Laboratory testing Mar 09Mar 08 13J Testing of Heavy Brines P&ngi – Completion fluids and materials – Part 3: Testing of heavy brines May NWI – Oct 10 13KChemical Analysis of BariteNov 01 Reaff: Aug 06 Voted: Sep 10 13LRecommended Practice for Training and Qualification of Drilling Fluid TechnologistsFeb 03 Reaff: Oct 10 13M Recommended Practice for the Measurement of Viscous Properties of Completion Fluids P&ngi – Completion fluids and materials – Part 1:Measurement of viscous properties of completion fluids (Cover is 13M not 13M-1, we can change this at the next printing) Jul 04 Reaff: Oct M Recommended Practice for Measuring Stimulation and Gravel-pack Fluid Leakoff Under Static Conditions P&ngi – Completion fluids and materials – Part 4: Measuring stimulation and gravel-pack fluid leakoff under static conditions Dec Jan 2011
Old Business Combining 13B-1, 13B-2, and 13I into single document – Paul S., Jim B., and Marvin P. will address prior to Jan 2011 New Business M. Zamora’s comments to RP 13D K. Morton procedure for HTHP viscometer L. Mitchell PPT procedure for three standards
Next Scheduled Meeting TG does not meet, all work done electronically Next report to SC13 – June 2011 Report is for information only San Francisco – Grand Hyatt