Refrigerator Recycling UES Measure Subcommittee Adam Hadley Subcommittee of the RTF September 1, 2015.

Slides:



Advertisements
Similar presentations
Efficient Pricing of Energy Conservation and Load Management Programs. August 9 th,2006 Kansas Corporation Commission Staff.
Advertisements

Refrigerator Decommissioning: Brother In Law Factor April 23,
E3 Calculator Revisions 2013 v1c4 Brian Horii June 22, 2012.
1 Analysis of Cost and Savings Values for Revised Energy Star Freezers and Refrigerators June 6, 2006 Revised August 8, 2006.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
1 Cost-Effectiveness Screening Issue for RTF August 30, 2007.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Opportunities to Collaborate with Electric Utilities on Energy Efficient Vending Machines.
1 Total Resource Cost Effectiveness Test Utility Brown Bag Series by Tom Eckman, NWPCC Ken Keating, BPA October 4, 2006.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Electric “Grid” Savings and Non-Electric Benefits for Residential HVAC-effected UES Measures Regional Technical Forum March 20, 2013.
LED Case Lighting With and Without Motion Sensors Michele Friedrich – Sr. Engineer PECI 1/5/2010.
1 Using Bass Diffusion Models To Estimate Product-Specific Net-To-Gross Ratios for Market Transformation Programs November 13, 2014.
BPA Pre-Pilot, Monmouth  14 homes with installed DHP, single zone, single compressor.  11 Monmouth, 2 Moses Lake, 1 Tacoma  Savings.
Today’s “Game Plan” Two Trial-Runs of a new deemed measure review process – Deemed measure analysis and review Developed by … – (consultant, RTF member/staff,
Residential Refrigerator & Freezer Decommissioning Measure Update May 13 th,
Economic Analysis of Water Supply and Water Quality Benefits IRWM Round 2 Roger Mann Lorraine Marsh Steve Hatchett Jerry Horner.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Direction on Guidelines Savings Definition Path: CONTINUED Remaining Useful Life (RUL) and Measure Interaction Regional Technical Forum February 19, 2014.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Economic Evaluation of PV systems in Jordan
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
UES Measure Updates: Refrigerator and Freezer Recycling Adam Hadley Regional Technical Forum June 16, 2015.
“A-Day” – a pensions bonanza? More choice and a fundamental change Pensions – NOT products, investments “Long-term tax-relieved like ISAs or PEPs”* To.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum September 17, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
1 Proposed Deemed Savings Values for Residential Refrigerator Recycling Programs June 7, 2005.
1 Analysis of Cost and Savings Values for Revised Energy Star Dishwasher Specifications June 6, 2006 Revised August 8, 2006.
ProCost Version 3 Christian Douglass, Ryan Firestone, Charlie Grist
Measurement and Verification of Refrigeration Measures in 4 Grocery Stores in Pacific County Presented to the Regional Technical Forum August 8 th, 2006.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
Implementer’s Group June 2015 RTF Meeting Debrief and Upcoming Meeting Prep June 23, 2015.
High Efficiency Evaporator Coils for Medium Temperature Cases Dustin Bailey, Engineer PECI Jan 5, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
UES Measure Updates: Refrigerator and Freezer Recycling (Continued from June) Adam Hadley Regional Technical Forum June 16, 2015.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
Electric “Grid” Savings and Non-Electric Benefits for Residential HVAC-affected UES Measures Regional Technical Forum March 20, 2013.
Residential: Appliances Refrigerator/Freezer Decommissioning: Early Retirement and Recycling May 15, 2012 Measure Status Change Recommendation.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
Refrigerator Decommissioning: Next Steps for Measure Update March 18th,
Refrigerator and Freezer Decommissioning: Deemed Measure Review and Update Regional Technical Forum June 1 st, 2010.
©2006 Dr. Howard Godfrey – Extra File for Chapter 11 1 Chapter 11- B Extra PowerPoint Slides This file contains explanations of compound interest computations.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
RTF Management Update Jennifer Anziano Regional Technical Forum August 18, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum December 8, 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
Non-Res Code Compliant Lighting: Working Toward a Standard Protocol Christian Douglass, RTF Contract Analyst Non-Residential Lighting Subcommittee October.
Continued: DHP for New Construction Current Practice Baseline Regional Technical Forum Adam Hadley February 17, 2016.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Presentation transcript:

Refrigerator Recycling UES Measure Subcommittee Adam Hadley Subcommittee of the RTF September 1, 2015

Subcommittee Questions At its June meeting, the RTF assigned to subcommittees the following, with the provision that the subcommittees do not change the logic model: – A small sub-group of the RTF to answer: RUL on costs Risk mitigation credit for early retirement – The refrigerator recycling subcommittee to answer: Review Measure Costs 1.Should participant incentives be included in the Regional Cost- effectiveness test? 2.Review of early replacement cost methodology 3.Review cost (and benefits) of induced replacement Our job today 2

Review: Small Sub-group of the RTF’s Recommendations Group answered their questions July 2nd – RUL on Costs Answer: – The staff proposal was appropriate. – The measure’s initial capital cost value should be preserved in RTF analysis and reporting. – Risk mitigation credit for early retirement Answer: The risk mitigation credit should be set to $0 for savings that do not persist through the planning horizon. Also note: The Grocery SP-to-EC Motors and Display Case LED’s measures that used both of these methods were adopted at the July RTF meeting 3

Question 1: Include incentive in B/C test? Question, in detail: – The refrigerator recycling program typically offers an incentive (~$20-$40) to the owner of the refrigerator/freezer to encourage program participation. Should this be included as a cost within the Regional Cost-effectiveness Test? Argument used in favor of including it as a cost – This is a cost of running the program; it’s like marketing – It represents the loss of utility of refrigeration Argument used against including it as a cost – This is a transfer payment within the Region. Including it as a cost would represent a change in the way the RTF does its economics – If it’s loss of utility of refrigeration, this measure violates the definition of conservation Staff recommendation: Do not include the incentive as a cost in the Regional Cost-effectiveness Test (Or, deactivate the measure if we think it’s a curtailment) Discussion and Subcommittee Recommendation? 4

Question 2: Are early replacement costs appropriate? Question, in detail: – Is the early replacement cost estimation method (shown on next slide) appropriate? Argument used in favor of the method – The sub-group of the RTF agreed with this method – Same method used in RTF/ProCost for years for truncated costs and benefits – Same method is used for other recently adopted measures Argument used against the method – There should be more review of this by more economists – (subcommittee to fill in blank) – Alternative proposal is (subcommittee to fill in blank) Staff recommendation: Use proposed method (next slide) Discussion and Subcommittee Recommendation? 5

Early Replacement Cost Methodology Mimics calculations ProCost uses where costs or benefits are truncated by program life 6 Notes: This example is for refrigerators, the same methodology is used for freezers. All costs are in 2006$’s. PV of Cost of Purchasing New: $942 Real Discount Rate: 5% EUL (new unit): 15.2 years Annualized Constant Payment for life of new equipment: $90 RUL (replaced unit): 6.4 years Early Replacement Cost = $942 – Sum(Red Bubble)

Question 3: Are induced replacement costs and benefits appropriate? Question, in detail: – Should the induced replacement paths include a benefit? For example, the utility of the refrigerator? Or the fact that there’s now another new refrigerator in the region? Staff recommendation: Modify the June proposal for induced replacement costs to include a benefit for the utility of refrigeration – See next slide for logic and proposal details – This proposal, unlike the previous 2 questions, has not yet been reviewed by the RTF 7

Induced Replacement Cost Proposal (2006$’s) Net Cost of Induced Replacement = PV of new unit – Other Value Potential sources of “Other Value” – Utility of a Newer unit? No way to quantify the benefit of having a new unit (independent of energy savings), except for using the cost of the new unit itself. But this negates the purpose of the Regional Cost-effectiveness Test; by this logic, anything someone in the Region buys would be cost-effective. – Utility of Refrigeration This could argue for setting the “other value” at the cost of a new refrigerator (Net cost = $0), or the cost or value of a used refrigerator – But the participant already had a refrigerator that worked Set the utility of refrigeration at the value of the incentive? We could use the cost of running the unit as a proxy for the value of the refrigeration – Cost to run the new unit could be considered the minimum value, because the owner is willing to pay at least this much to run the unit. This mimics the method used to estimate the cooling benefit for the DHP measure. » New Unit Retail Electricity Cost Refrigerator: 433 $0.081/kWh = $35/yr NPV of $35/yr for % real discount rate = $369 Net Cost of Induced Replacement = $942 – $369 = $573 Freezer: 288 $0.081/kWh = $23/yr NPV of $52/yr for % real discount rate = $298 Net cost of Induced Replacement = $516 – $298 = $218 Discussion and Subcommittee Recommendation? 8

Extra Slides 9

Proposal: Add cost of Replacement Units – Induced Replacement – Where the program caused purchase of a unit that otherwise wouldn’t have been purchased – Early Replacement – Where the program caused early replacement of an existing unit – The induced replacement cost or the early replacement cost is used, depending on the circumstances, as shown on upcoming slides (“logic maps”) – Cost only incurred where replacement unit is new because purchase of a used unit represents a transfer payment within Region: How many are new units? Same values as used in energy savings calculations Refrigerators – “Brother-in-Law” (R2): 59% » ADM CA Statewide survey – Participant (R1): 78% » Source: JACO Program Data Freezers: 100% Measure Cost: Changes (continued) 10 This slide from June RTF Presentation

11 Refrigerator Replacement Cost Logic Map This slide from June RTF Presentation

Support Materials RTF June Refrigerator Recycling Presentation The Uniform Methods Project: Chapter 7: Refrigerator Recycling Evaluation Protocol The Uniform Methods Project: Chapter 7: Refrigerator Recycling Evaluation Protocol Reports where RTF gets its percent “induced replacement” value – Rocky Mt Power ID Rocky Mt Power ID – Pacific Power WA Pacific Power WA